TxDOT contract A00187296 bid tabulation

Rehabilitate Existing Roadway, FM 159 (9.8 Mi S of FM 2154 to SH 105). Let by Texas DOT on April 4, 2025, Brazos, Bryan District. 5 bids received; low bid $6,280,471 by Brazos Paving, Inc., -5.7% against the engineer's estimate of $6,658,923.

Owner
Texas DOT
Letting
04 APR 2025
Pay items
97
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Brazos Paving, Inc.$6,280,471Low-6.0%
2Texas Materials Group, Inc.$7,073,471+13%+6.0%
3Cornerstone Paving and Construction, L.L.C.$7,523,366+20%+13%
4Knife River Corporation - South$7,776,380+24%+17%
5Big Creek Construction, LTD.$8,887,999+42%+33%
TxDOT contract A00187296: bids by rank

Engineer's estimate: $6,658,923.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Brazos Paving, Inc.2. Texas Materials Group, Inc.3. Cornerstone Paving and Construction, L.L.C.4. Knife River Corporation - South5. Big Creek Construction, LTD.
1Preparing row (100-7002)STA65$2,000.00$550.00$3,900.00$1,600.00$585.00$1,000.00
2Removing concrete (riprap) (104-7006)SY90$12.50$21.50$165.00$25.00$71.00$50.00
3Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053)SY1,124$20.00$13.20$20.00$20.00$9.48$15.00
4Excavation (roadway) (110-7001)CY19,045.35$17.00$18.60$19.00$42.75$14.95$25.00
5Embankment (final)(DC)(type C) (132-7006)CY2,085.65$22.00$21.50$30.00$30.70$5.00$25.00
6Furn & place topsoil (4") (160-7009)STA203.53$225.00$98.00$280.00$300.00$134.00$250.00
7Broadcast seed (permanent_rural_clay) (164-7002)SY24,974$0.42$0.22$0.30$0.30$0.24$0.25
8Broadcast seed (temporary_warm) (164-7005)SY12,487$0.28$0.14$0.28$0.28$0.23$0.15
9Broadcast seed (temporary_cool) (164-7006)SY12,487$0.28$0.17$0.28$0.28$0.23$0.20
10Vegetative watering (168-7001)TGL500$35.00$66.00$30.00$10.00$37.70$25.00
11FL BS (compacted in place)(type A GR 1-2) (8") (247-7067)SY67,599$23.00$19.80$23.00$21.20$21.33$25.00
12Rework BS metal (type B)(6")(ord comp) (251-7025)SY53,715$3.75$2.05$3.30$7.50$1.46$3.50
13Cement (275-7001)TON1,076$250.00$260.00$235.00$260.00$243.00$300.00
14Cement TRT (existing material)(10") (275-7004)SY76,631$4.25$2.65$1.50$3.30$1.52$3.50
15Asphalt (AC-20XP) (316-7006)GAL48,173$5.50$3.90$4.80$4.60$3.75$4.50
16Asphalt (RC-250) (316-7016)GAL16,900$6.50$4.00$5.30$7.15$5.00$5.00
17Aggregate (type-PB or PL, GR-4)(sac-A) (316-7241)CY1,071$179.00$180.00$208.00$175.00$176.49$170.00
18Aggregate (type-B or L, GR-5) (316-7251)CY501$165.00$154.75$202.00$133.00$189.64$140.00
19SP mixes SP-C PG64-22 (344-7009)TON76$150.00$181.65$370.00$280.00$281.00$300.00
20Tack coat (344-7077)GAL69$5.00$8.00$32.00$15.00$5.00$10.00
21Cut & restoring pavement (400-7006)SY186$175.00$29.85$100.00$165.00$33.19$100.00
22Cem stabil BKFL (400-7010)CY112$225.00$100.20$280.00$1,000.00$195.00$250.00
23Trench excavation protection (402-7001)LF224$25.00$2.00$3.00$9.00$48.00$20.00
24Drilled shaft (18 in) (416-7002)LF216$200.00$361.40$132.00$306.00$132.00$250.00
25Drilled shaft (36 in) (416-7006)LF432$354.00$516.00$420.00$436.00$517.19$450.00
26Drilled shaft (42 in) (416-7007)LF264$431.00$564.20$535.00$477.00$629.00$650.00
27Class C concrete (abutment)(HPC) (420-7013)CY48.20$1,630.00$2,423.75$4,400.00$2,047.00$8,482.00$5,000.00
28Class C concrete (cap)(HPC) (420-7023)CY58.50$1,505.00$2,246.40$3,600.00$1,900.00$7,242.00$5,000.00
29Class C concrete (column)(HPC) (420-7039)CY19.20$1,724.63$2,246.40$2,600.00$1,900.00$3,217.00$5,000.00
30Reinforced concrete slab (HPC) (422-7002)SF6,120$28.23$48.75$65.00$42.00$146.70$150.00
31Approach slab (HPC) (422-7014)CY54.60$777.83$925.55$830.00$790.00$1,245.00$2,500.00
32Prestressed concrete girder (TX28) (425-7001)LF1,011$298.24$230.45$623.00$195.00$449.45$300.00
33Riprap (mow strip)(4 in) (432-7013)CY36$650.00$455.00$850.00$800.00$1,285.00$850.00
34Riprap (stone protection)(12 in) (432-7041)CY15.50$225.00$325.00$202.00$1,200.00$438.00$500.00
35Riprap (stone protection)(18 in) (432-7043)CY369$203.50$160.00$202.00$375.00$261.00$300.00
36Rail (type T223)(HPC) (450-7009)LF372$170.00$172.80$240.00$146.00$263.00$300.00
37Header type expansion joint (454-7009)CF71$500.00$940.30$360.00$327.00$400.00$350.00
38RC pipe (CL III)(24 in) (464-7005)LF325$150.00$129.10$216.00$102.00$129.00$120.00
39RC pipe (CL III)(30 in) (464-7007)LF58$210.00$182.10$235.00$135.00$140.00$160.00
40RC pipe (CL III)(36 in) (464-7009)LF46$300.00$262.20$310.00$220.00$182.00$220.00
41RC pipe (CL III)(42 in) (464-7010)LF46$325.00$273.40$360.00$315.00$214.00$250.00
42Set (type I) (36 in) (3: 1) (C) (467-7017)EACH2$4,750.00$5,725.00$15,000$3,450.00$11,650$8,000.00
43Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH2$1,347.85$1,590.00$2,100.00$1,950.00$1,100.00$1,500.00
44Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$2,500.00$1,100.00$2,300.00$2,255.00$1,360.00$1,600.00
45Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH10$2,500.00$1,990.00$2,500.00$2,315.00$1,430.00$1,700.00
46Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH4$2,376.37$2,300.00$2,500.00$2,458.00$1,300.00$2,200.00
47Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345)EACH1$4,000.00$2,400.00$3,100.00$3,653.00$1,800.00$2,000.00
48Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH1$4,200.00$2,650.00$3,100.00$3,789.00$1,800.00$2,400.00
49Set (type II) (42 in) (TP) (3: 1) (C) (467-7381)EACH2$4,750.00$6,510.00$5,200.00$4,978.00$2,500.00$5,200.00
50Clean existing culverts (480-7001)EACH2$2,500.00$2,000.00$3,000.00$2,750.00$4,100.00$1,500.00
51Diamond grinding slab (abc) (483-7019)SY642$14.00$18.80$12.00$40.00$17.25$30.00
52Removing structure (set) (496-7004)EACH18$1,000.00$792.00$400.00$650.00$500.00$750.00
53Removing structure (pipe) (496-7007)LF401$50.00$177.00$35.00$25.00$34.00$20.00
54Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$75,000$49,825$55,000$255,000$53,400$147,000
55Mobilization (500-7001)LS1$620,000$737,120$528,000$750,000$811,000$880,000
56Barricades, signs and traffic handling (502-7001)MO12$10,000$6,500.00$3,500.00$7,000.00$18,500$50,000
57Portable changeable message sign (503-7001)DAY280$230.00$68.00$140.00$65.00$120.00$150.00
58Portable changeable message sign (503-7002)EACH2$12,000$17,373$5,000.00$20,000$21,000$15,000
59TMA (stationary) (505-7001)DAY174$250.00$248.10$280.00$210.00$500.00$375.00
60TMA (mobile operation) (505-7003)DAY24$200.00$580.00$280.00$210.00$900.00$750.00
61Rock filter dams (install) (type 2) (506-7002)LF580$40.00$43.60$36.00$36.00$56.45$40.00
62Rock filter dams (remove) (506-7011)LF580$12.00$14.50$12.00$12.00$25.00$12.00
63Temporary sediment control fence (install) (506-7039)LF3,940$4.41$4.25$3.50$3.50$6.40$5.00
64Temporary sediment control fence (remove) (506-7041)LF3,940$1.22$1.20$1.00$1.00$1.50$1.00
65Driveways (ACP) (530-7010)SY437$85.00$39.05$115.00$145.00$58.00$65.00
66Driveways (surface treat) (530-7016)SY534$50.00$13.00$51.00$120.00$48.00$45.00
67Turnouts (surface treat) (530-7019)SY16$77.00$73.65$51.00$500.00$180.00$45.00
68Metal W-beam guard fence (timber post) (540-7001)LF250$27.50$29.05$25.00$31.00$26.70$40.00
69Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$2,450.00$2,408.00$2,800.00$2,020.00$3,120.00$2,500.00
70Remove metal beam guard fence (542-7001)LF200$4.50$3.00$2.00$11.00$2.20$5.00
71Guardrail end treatment (install) (544-7001)EACH4$3,460.00$3,631.00$3,300.00$3,125.00$3,550.00$3,500.00
72Guardrail end treatment (remove) (544-7003)EACH6$400.00$303.00$200.00$300.00$230.00$350.00
73Mailbox install-S (TWW-post) type 4 (560-7008)EACH2$400.00$91.25$350.00$300.00$400.00$350.00
74Mailbox install-D (TWW-post) type 4 (560-7009)EACH1$415.00$411.50$430.00$350.00$470.00$450.00
75Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH46$800.00$750.35$530.00$700.00$583.00$700.00
76Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$900.00$895.60$620.00$750.00$683.00$750.00
77Remove SM RD SN sup&AM (644-7073)EACH40$120.00$109.00$100.00$100.00$100.00$150.00
78Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH6$40.00$27.00$25.00$28.00$28.00$40.00
79Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH12$40.13$29.00$35.00$32.00$39.00$45.00
80Install object marker assembly (OM-2Z)(WFLX)SRF (658-7060)EACH18$120.00$91.00$150.00$90.00$160.00$150.00
81Remove delin & object marker assms (658-7078)EACH20$55.00$22.00$25.00$15.00$28.00$30.00
82Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF40,706$0.35$0.50$0.25$0.32$0.28$0.35
83Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF4,450$0.70$0.50$0.33$0.34$0.37$0.40
84Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF11,944$0.35$0.50$0.33$0.32$0.37$0.40
85Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,070$0.80$1.00$1.50$1.00$2.00$1.50
86Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF40,706$0.35$0.50$0.33$0.34$0.37$0.40
87Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF4,450$0.50$0.50$0.33$0.36$0.37$0.40
88Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF11,944$0.35$0.40$0.33$0.34$0.37$0.40
89Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF40,706$2.77$0.90$0.65$0.66$0.72$0.90
90Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF4,450$2.43$0.95$0.65$0.68$0.72$0.75
91Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF11,944$2.43$0.95$0.65$0.66$0.72$0.75
92PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF4,071$4.21$5.75$4.40$4.50$4.90$6.00
93Prefabricated PM type C (W)(24")(solid) (668-7089)LF33$30.00$18.15$25.00$33.00$28.00$35.00
94PRFB rumble strip (BLK)(1')(edgeline) (668-7137)LF8,142$0.23$5.75$4.30$4.30$4.78$6.00
95Reflectorized pavement marker type II-A-A (672-7004)EACH392$7.50$7.25$5.00$5.50$5.60$7.00
96Pavement surface preparation for marking (6") (678-7002)LF800$0.10$1.20$1.20$1.00$1.30$1.50
97Ultra-high performance concrete (4024-7001)CY16.80$10,000$10,660$1,850.00$9,000.00$3,500.00$5,000.00
TxDOT contract A00187296: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy