TxDOT contract A00195794 bid tabulation
Rehabilitate Existing Roadway, FM 1777 (CR 677 to SH 66). Let by Texas DOT on December 3, 2025, Collin, Dallas District. 7 bids received; low bid $5,803,762 by D. L. Lennon Incorporated - Contractor, -11% against the engineer's estimate of $6,545,696.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 96
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | D. L. Lennon Incorporated - Contractor | $5,803,762 | Low | -11% |
| 2 | A. K. Gillis & Sons, LLC | $5,885,298 | +1.0% | -10% |
| 3 | Ed Bell Construction Company | $6,349,947 | +9.0% | -3.0% |
| 4 | Grey Sky Construction LLC | $6,806,885 | +17% | +4.0% |
| 5 | Highway 19 Construction LLC | $7,280,976 | +25% | +11% |
| 6 | Texas Materials Group, Inc. | $7,352,658 | +27% | +12% |
| 7 | Overland Corporation | $7,462,555 | +29% | +14% |
Engineer's estimate: $6,545,696.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. D. L. Lennon Incorporated - Contractor | 2. A. K. Gillis & Sons, LLC | 3. Ed Bell Construction Company | 4. Grey Sky Construction LLC | 5. Highway 19 Construction LLC | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 137.80 | $500.00 | $281.90 | $390.00 | $2,800.00 | $2,500.00 | $140.00 | $2,000.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 1,205 | $15.00 | $12.00 | $25.00 | $15.00 | $20.00 | $35.00 | $33.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 629 | $22.57 | $12.00 | $15.00 | $15.00 | $20.00 | $25.00 | $33.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 6,878 | $20.00 | $18.50 | $15.00 | $16.00 | $20.00 | $25.00 | $14.00 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 13,267 | $30.00 | $26.32 | $19.00 | $19.30 | $30.00 | $30.00 | $44.00 |
| 6 | Backfill (type A or B) (134-7004) | STA | 137.80 | $325.00 | $300.00 | $275.00 | $268.00 | $250.00 | $350.00 | $305.00 |
| 7 | Blading (150-7001) | STA | 137.80 | $225.00 | $350.00 | $275.00 | $568.00 | $150.00 | $350.00 | $190.00 |
| 8 | Drill seed (permanent_rural_clay) (164-7010) | SY | 91,954 | $0.50 | $0.15 | $0.15 | $0.16 | $0.30 | $0.37 | $0.16 |
| 9 | Drill seed (temporary_warm_cool) (164-7015) | SY | 91,954 | $0.25 | $0.15 | $0.15 | $0.11 | $0.30 | $0.35 | $0.12 |
| 10 | Vegetative watering (168-7001) | TGL | 27,358 | $5.00 | $0.01 | $1.00 | $0.10 | $1.00 | $10.00 | $0.11 |
| 11 | FL BS (compacted in place)(type D GR 1-2) (12") (247-7125) | SY | 48,860 | $30.00 | $30.60 | $31.38 | $29.00 | $30.00 | $40.70 | $37.00 |
| 12 | FL BS (roadway del) (type D GR 1-2) (247-7209) | TON | 12,215 | $40.00 | $48.00 | $52.37 | $39.00 | $50.00 | $54.00 | $41.00 |
| 13 | Rework BS metal (type C)(12")(ord comp) (251-7055) | SY | 39,129 | $4.50 | $2.80 | $3.10 | $2.40 | $5.00 | $5.00 | $6.00 |
| 14 | Cement (275-7001) | TON | 255 | $300.00 | $255.00 | $219.00 | $255.00 | $250.00 | $250.00 | $240.00 |
| 15 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 50,396 | $4.00 | $3.55 | $2.95 | $1.55 | $4.00 | $4.50 | $2.26 |
| 16 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 7,331 | $8.00 | $5.42 | $6.21 | $5.96 | $5.00 | $5.00 | $5.85 |
| 17 | Emuls asphalt (BS or subgr TRT)(SS-1) (314-7001) | GAL | 7,331 | $8.00 | $4.22 | $4.96 | $5.75 | $5.00 | $5.00 | $3.75 |
| 18 | Asphalt (CRS-2P) (316-7012) | GAL | 9,163 | $5.00 | $4.57 | $5.31 | $4.74 | $5.00 | $5.00 | $4.48 |
| 19 | Asphalt (RC-250) (316-7016) | GAL | 3,422 | $10.00 | $5.33 | $5.93 | $6.10 | $5.00 | $6.00 | $4.60 |
| 20 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 7,698 | $12.00 | $4.14 | $4.47 | $3.99 | $5.00 | $4.00 | $4.81 |
| 21 | Aggregate (type-B or L, GR-3)(sac-B) (316-7244) | CY | 313 | $310.00 | $152.00 | $179.91 | $266.25 | $250.00 | $250.00 | $224.04 |
| 22 | Aggregate (type-B or L, GR-5) (316-7251) | CY | 134 | $450.00 | $140.00 | $167.71 | $319.50 | $250.00 | $250.00 | $228.55 |
| 23 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 6,151 | $110.00 | $125.00 | $120.00 | $126.00 | $135.00 | $117.00 | $139.00 |
| 24 | Plane & text asphalt concrete pavement(0" to 6") (354-7005) | SY | 39,129 | $5.00 | $4.50 | $3.50 | $5.25 | $3.00 | $5.50 | $5.00 |
| 25 | Cut & restoring pavement (400-7006) | SY | 81 | $150.00 | $50.00 | $100.00 | $300.00 | $200.00 | $350.00 | $84.84 |
| 26 | Trench excavation protection (402-7001) | LF | 25 | $5.00 | $5.00 | $15.00 | $50.00 | $10.00 | $10.00 | $1.05 |
| 27 | Temporary special shoring (403-7001) | SF | 688 | $40.00 | $80.00 | $5.00 | $65.00 | $85.00 | $55.00 | $65.00 |
| 28 | Riprap (mow strip)(4 in) (432-7013) | CY | 85 | $650.00 | $715.00 | $750.00 | $700.00 | $550.00 | $550.00 | $746.00 |
| 29 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 198 | $130.00 | $300.00 | $299.42 | $220.00 | $155.00 | $180.00 | $313.00 |
| 30 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,289 | $100.00 | $75.00 | $90.00 | $85.00 | $95.00 | $92.00 | $87.00 |
| 31 | RC pipe (CL III)(30 in) (464-7007) | LF | 52 | $170.00 | $118.00 | $125.00 | $300.00 | $105.00 | $160.00 | $130.00 |
| 32 | RC pipe (CL III)(48 in) (464-7011) | LF | 56 | $270.00 | $240.00 | $300.00 | $600.00 | $225.00 | $250.00 | $433.00 |
| 33 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 2 | $12,000 | $6,500.00 | $10,000 | $9,000.00 | $2,250.00 | $3,500.00 | $8,770.00 |
| 34 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 2 | $12,500 | $7,500.00 | $12,000 | $10,000 | $2,850.00 | $6,000.00 | $11,910 |
| 35 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $20,564 | $13,000 | $16,000 | $25,000 | $6,500.00 | $12,000 | $26,000 |
| 36 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 62 | $1,500.00 | $1,500.00 | $1,600.00 | $1,400.00 | $1,500.00 | $1,550.00 | $1,620.00 |
| 37 | Jack bor or tun pipe(30 in)(RC)(CL III) (476-7012) | LF | 44 | $1,700.00 | $2,208.00 | $2,011.00 | $2,100.00 | $2,500.00 | $560.00 | $1,785.00 |
| 38 | Clean existing culverts (480-7001) | EACH | 7 | $4,263.64 | $1,000.00 | $1,500.00 | $1,200.00 | $1,500.00 | $5,000.00 | $3,680.00 |
| 39 | Removing structure (set) (496-7004) | EACH | 30 | $540.00 | $100.00 | $150.00 | $100.00 | $500.00 | $500.00 | $216.00 |
| 40 | Removing structure (wingwall) (496-7005) | EACH | 6 | $2,227.45 | $900.00 | $1,000.00 | $2,500.00 | $2,500.00 | $1,000.00 | $757.00 |
| 41 | Removing structure (headwall) (496-7006) | EACH | 5 | $1,300.00 | $800.00 | $1,000.00 | $800.00 | $2,500.00 | $500.00 | $974.00 |
| 42 | Removing structure (pipe) (496-7007) | LF | 940 | $30.00 | $5.00 | $10.00 | $25.00 | $30.00 | $50.00 | $13.00 |
| 43 | Mobilization (500-7001) | LS | 1 | $583,820 | $360,750 | $432,742 | $645,000 | $680,000 | $750,000 | $632,685 |
| 44 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $15,000 | $9,476.00 | $14,000 | $21,000 | $8,500.00 | $2,500.00 | $35,000 |
| 45 | Portable changeable message sign (503-7002) | EACH | 2 | $17,500 | $21,000 | $19,500 | $21,000 | $20,000 | $15,000 | $12,100 |
| 46 | TMA (stationary) (505-7001) | DAY | 155 | $250.00 | $150.00 | $200.00 | $150.00 | $250.00 | $250.00 | $420.00 |
| 47 | TMA (mobile operation) (505-7002) | HR | 40 | $150.00 | $150.00 | $200.00 | $150.00 | $55.00 | $100.00 | $1.00 |
| 48 | Rock filter dams (install) (type 3) (506-7003) | LF | 347 | $62.00 | $74.00 | $70.00 | $90.53 | $30.00 | $85.00 | $75.00 |
| 49 | Rock filter dams (remove) (506-7011) | LF | 393 | $18.00 | $10.00 | $15.00 | $13.85 | $15.00 | $15.00 | $14.80 |
| 50 | Construction exits (install) (type 1) (506-7020) | SY | 308 | $35.25 | $35.00 | $33.00 | $37.28 | $50.00 | $35.00 | $37.00 |
| 51 | Construction exits (remove) (506-7024) | SY | 308 | $11.00 | $10.00 | $10.00 | $10.65 | $20.00 | $10.00 | $12.00 |
| 52 | Temporary sediment control fence (install) (506-7039) | LF | 4,444 | $4.31 | $4.00 | $5.00 | $3.78 | $4.00 | $5.00 | $3.65 |
| 53 | Temporary sediment control fence (remove) (506-7041) | LF | 4,444 | $2.00 | $1.00 | $1.00 | $1.07 | $2.00 | $1.00 | $1.00 |
| 54 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 209 | $5.00 | $5.25 | $7.00 | $6.23 | $9.00 | $10.00 | $11.80 |
| 55 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 2,002 | $9.00 | $6.00 | $9.00 | $6.66 | $12.00 | $10.00 | $7.00 |
| 56 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,211 | $2.00 | $1.22 | $1.00 | $1.17 | $5.00 | $1.00 | $0.92 |
| 57 | Rock filter dams (install) (type 2) 6:1 (506-7048) | LF | 46 | $102.00 | $51.00 | $70.00 | $58.58 | $30.00 | $70.00 | $121.00 |
| 58 | Driveways (concrete) (530-7006) | SY | 651 | $120.00 | $170.17 | $164.51 | $130.00 | $105.00 | $110.00 | $143.00 |
| 59 | Driveways (ACP) (530-7010) | SY | 1,094 | $85.00 | $75.00 | $73.00 | $80.00 | $45.00 | $75.00 | $99.00 |
| 60 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 7,674 | $0.26 | $1.19 | $0.19 | $0.55 | $0.30 | $0.35 | $0.62 |
| 61 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 4,764 | $0.36 | $1.19 | $0.19 | $0.85 | $0.30 | $0.35 | $0.62 |
| 62 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,350 | $26.00 | $22.50 | $22.50 | $23.96 | $30.00 | $35.00 | $24.50 |
| 63 | Remove metal beam guard fence (542-7001) | LF | 1,235 | $4.00 | $2.50 | $2.50 | $2.66 | $6.00 | $3.00 | $2.60 |
| 64 | Guardrail end treatment (install) (544-7001) | EACH | 10 | $3,800.00 | $2,950.00 | $2,950.00 | $3,141.75 | $3,250.00 | $2,950.00 | $3,225.00 |
| 65 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $300.00 | $250.00 | $250.00 | $266.25 | $1,500.00 | $250.00 | $270.00 |
| 66 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 8 | $350.00 | $230.00 | $220.00 | $452.63 | $850.00 | $450.00 | $334.00 |
| 67 | Conduit (PVC) (schedule 80) (2 1/2") (618-7058) | LF | 12 | $25.00 | $30.00 | $22.00 | $16.00 | $50.00 | $30.00 | $67.55 |
| 68 | Electrical conductor (no.6) bare (620-7009) | LF | 80 | $2.89 | $6.00 | $3.00 | $3.00 | $3.00 | $6.00 | $15.59 |
| 69 | Electrical conductor (no.6) insulated (620-7010) | LF | 160 | $3.31 | $6.00 | $3.25 | $3.00 | $3.00 | $6.00 | $25.98 |
| 70 | Relocate electrical services (628-7001) | EACH | 1 | $805.00 | $2,500.00 | $5,065.00 | $5,500.00 | $1,500.00 | $2,700.00 | $10,393 |
| 71 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 35 | $800.00 | $665.00 | $625.00 | $479.25 | $850.00 | $850.00 | $731.00 |
| 72 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 3 | $1,200.00 | $745.00 | $670.00 | $505.88 | $1,150.00 | $1,100.00 | $799.00 |
| 73 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $975.47 | $830.00 | $950.00 | $825.38 | $1,150.00 | $1,500.00 | $844.00 |
| 74 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,008.18 | $1,370.00 | $950.00 | $1,065.00 | $1,150.00 | $1,250.00 | $1,002.00 |
| 75 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 5 | $700.00 | $500.00 | $450.00 | $718.88 | $1,150.00 | $350.00 | $583.00 |
| 76 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 26 | $43.49 | $25.00 | $25.00 | $26.63 | $100.00 | $35.00 | $26.50 |
| 77 | Install object marker assembly (OM-2Z)(WFLX)GNDHH (658-7249) | EACH | 12 | $67.28 | $173.00 | $190.00 | $159.75 | $100.00 | $45.00 | $191.00 |
| 78 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 13,780 | $0.24 | $0.44 | $0.44 | $0.32 | $1.00 | $0.30 | $0.32 |
| 79 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 13,780 | $0.25 | $0.44 | $0.44 | $0.32 | $1.00 | $0.30 | $0.32 |
| 80 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 90 | $1.34 | $1.50 | $2.45 | $2.00 | $6.00 | $2.00 | $1.20 |
| 81 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 351 | $1.71 | $1.50 | $2.45 | $2.00 | $6.00 | $2.00 | $1.20 |
| 82 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 857 | $1.10 | $1.05 | $1.05 | $0.82 | $6.00 | $0.77 | $1.04 |
| 83 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 143 | $6.46 | $6.85 | $6.85 | $6.66 | $20.00 | $6.00 | $12.72 |
| 84 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 26,864 | $0.48 | $0.20 | $0.20 | $0.27 | $1.00 | $0.25 | $0.18 |
| 85 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 857 | $0.32 | $0.38 | $0.38 | $0.64 | $4.00 | $0.60 | $0.62 |
| 86 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 143 | $6.10 | $2.40 | $2.40 | $4.26 | $20.00 | $4.00 | $2.65 |
| 87 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 1,411 | $0.33 | $0.20 | $0.20 | $0.32 | $3.00 | $0.30 | $0.31 |
| 88 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 19,804 | $0.40 | $0.20 | $0.20 | $0.27 | $1.00 | $0.25 | $0.18 |
| 89 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 26,864 | $0.65 | $0.60 | $0.60 | $0.51 | $1.00 | $0.48 | $0.55 |
| 90 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,411 | $0.67 | $0.60 | $0.60 | $0.59 | $3.00 | $0.55 | $0.57 |
| 91 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 19,804 | $0.66 | $0.60 | $0.60 | $0.51 | $1.00 | $0.48 | $0.56 |
| 92 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 10 | $311.00 | $248.00 | $248.00 | $234.30 | $250.00 | $250.00 | $201.00 |
| 93 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 10 | $400.00 | $329.00 | $329.00 | $319.50 | $250.00 | $300.00 | $254.00 |
| 94 | Reflectorized pavement marker type I-C (672-7002) | EACH | 47 | $5.29 | $4.00 | $4.00 | $4.26 | $6.00 | $4.00 | $4.45 |
| 95 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 688 | $5.61 | $4.00 | $4.00 | $4.26 | $6.00 | $4.00 | $3.92 |
| 96 | Relocate RDSD flash beacon assembly (685-7002) | EACH | 2 | $4,500.00 | $2,500.00 | $4,780.00 | $9,000.00 | $8,500.00 | $2,700.00 | $15,589 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.