TxDOT contract A00200923 bid tabulation
Hazard Elimination & Safety, TEXAS AVE (A St to C St). Let by Texas DOT on May 2, 2025, Midland, Odessa District. 6 bids received; low bid $1,295,425 by O. Trevino Construction, LLC, -13% against the engineer's estimate of $1,487,853.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 53
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | O. Trevino Construction, LLC | $1,295,425 | Low | -13% |
| 2 | Ti-Zack Concrete, LLC | $1,482,632 | +14% | 0.0% |
| 3 | Grey Sky Construction LLC | $1,622,115 | +25% | +9.0% |
| 4 | Dan Williams Company | $1,699,975 | +31% | +14% |
| 5 | Reece Albert, Inc. | $1,729,128 | +33% | +16% |
| 6 | Ragle Construction, Inc. | $2,061,627 | +59% | +39% |
Engineer's estimate: $1,487,853.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. O. Trevino Construction, LLC | 2. Ti-Zack Concrete, LLC | 3. Grey Sky Construction LLC | 4. Dan Williams Company | 5. Reece Albert, Inc. | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 360 | $80.00 | $65.00 | $25.33 | $30.00 | $50.00 | $142.68 | $100.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 444 | $50.00 | $50.00 | $24.65 | $30.00 | $40.00 | $101.22 | $25.00 |
| 3 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 670 | $65.00 | $30.00 | $13.61 | $30.00 | $25.00 | $80.75 | $14.00 |
| 4 | Remove (7"-11") TRT/untrt base & asphalt pavement (105-7007) | SY | 1,388 | $45.00 | $35.00 | $26.28 | $30.00 | $45.00 | $62.94 | $14.20 |
| 5 | Excavation (roadway) (110-7001) | CY | 12 | $55.00 | $95.00 | $114.00 | $30.00 | $300.00 | $1,338.29 | $500.00 |
| 6 | Embankment (final)(OC)(type A) (132-7001) | CY | 173 | $65.00 | $157.00 | $113.43 | $100.00 | $80.00 | $330.57 | $600.00 |
| 7 | Furn & place topsoil (4") (160-7002) | SY | 86 | $15.00 | $13.50 | $10.60 | $10.00 | $75.00 | $46.48 | $23.00 |
| 8 | Block sodding (162-7002) | SY | 86 | $25.00 | $44.00 | $11.00 | $10.00 | $75.00 | $55.42 | $23.00 |
| 9 | FL BS (compacted in place)(type C GR 4) (6") (247-7054) | SY | 734 | $55.00 | $60.00 | $12.43 | $65.00 | $50.00 | $184.85 | $22.00 |
| 10 | Rework BS metal (type D)(6")(ord comp) (251-7065) | STA | 734 | $15.00 | $30.00 | $1.24 | $20.00 | $25.00 | $35.23 | $3.50 |
| 11 | Prime coat (MC-30) (310-7004) | GAL | 87 | $25.00 | $90.00 | $11.00 | $10.00 | $75.00 | $50.80 | $14.00 |
| 12 | D-GR HMA type-C PG70-22 (341-7022) | TON | 58 | $600.00 | $530.00 | $385.00 | $500.00 | $1,250.00 | $833.82 | $300.00 |
| 13 | D-GR HMA type D PG70-22 (341-7048) | TON | 38 | $510.00 | $1,375.00 | $385.00 | $500.00 | $1,700.00 | $1,162.26 | $350.00 |
| 14 | Tack coat (341-7082) | GAL | 35 | $15.00 | $150.00 | $11.00 | $10.00 | $125.00 | $13.85 | $15.00 |
| 15 | Riprap (concrete)(4 in) (432-7001) | CY | 52 | $1,150.00 | $1,110.00 | $1,793.89 | $650.00 | $1,575.00 | $1,905.91 | $2,300.00 |
| 16 | Riprap (stone common)(grout)(6 in) (432-7036) | CY | 4 | $625.00 | $1,305.00 | $440.00 | $250.00 | $3,500.00 | $3,759.70 | $651.00 |
| 17 | Cast-in-place trench drain (474-7021) | LF | 722 | $250.00 | $285.00 | $764.42 | $1,000.00 | $500.00 | $421.54 | $350.00 |
| 18 | Adjusting manholes (water valve box) (479-7007) | EACH | 2 | $1,900.00 | $2,650.00 | $456.00 | $850.00 | $1,200.00 | $887.58 | $3,500.00 |
| 19 | Mobilization (500-7001) | LS | 1 | $315,658 | $129,500 | $147,731 | $165,000 | $165,000 | $174,138 | $300,000 |
| 20 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $15,000 | $20,000 | $16,500 | $8,500.00 | $32,500 | $10,525 | $110,850 |
| 21 | Concrete curb & gutter (type II) (529-7009) | LF | 1,325 | $90.00 | $80.00 | $79.25 | $65.00 | $75.00 | $89.16 | $36.00 |
| 22 | Concrete sidewalks (4") (531-7001) | SY | 789 | $155.00 | $120.00 | $158.08 | $85.00 | $175.00 | $172.12 | $66.00 |
| 23 | Curb ramps (type 1) (531-7005) | EACH | 21 | $4,150.00 | $4,010.00 | $3,624.03 | $3,850.00 | $3,500.00 | $4,458.02 | $2,000.00 |
| 24 | Curb ramps (type 21) (531-7013) | EACH | 2 | $4,020.00 | $3,580.00 | $3,624.03 | $3,850.00 | $3,500.00 | $4,059.73 | $2,100.00 |
| 25 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 20 | $115.00 | $70.00 | $44.00 | $100.00 | $60.00 | $66.50 | $60.00 |
| 26 | Electrical conductor (no.6) bare (620-7009) | LF | 20 | $6.00 | $2.50 | $5.50 | $5.00 | $2.00 | $2.22 | $2.00 |
| 27 | Ground box type C (162911) (624-7005) | EACH | 2 | $3,000.00 | $2,328.00 | $1,375.00 | $1,500.00 | $2,000.00 | $2,216.77 | $2,000.00 |
| 28 | Aluminum signs (type A) (636-7001) | SF | 157 | $100.00 | $41.00 | $49.50 | $50.00 | $8.00 | $36.58 | $35.00 |
| 29 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 22 | $1,190.00 | $1,105.00 | $495.00 | $1,500.00 | $1,850.00 | $908.88 | $950.00 |
| 30 | Remove SM RD SN sup&AM (644-7073) | EACH | 16 | $560.00 | $117.00 | $55.00 | $500.00 | $200.00 | $253.27 | $100.00 |
| 31 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 147 | $5.00 | $6.75 | $5.50 | $5.00 | $5.00 | $5.54 | $5.00 |
| 32 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 82 | $8.00 | $15.50 | $12.33 | $12.00 | $11.25 | $12.43 | $11.21 |
| 33 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 431 | $15.00 | $17.00 | $13.46 | $20.00 | $12.25 | $13.57 | $12.24 |
| 34 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 8 | $675.00 | $488.00 | $397.10 | $1,000.00 | $361.00 | $399.90 | $360.79 |
| 35 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 8 | $200.00 | $136.50 | $111.10 | $1,000.00 | $101.00 | $111.90 | $100.96 |
| 36 | Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402) | LF | 570 | $3.00 | $6.75 | $5.50 | $3.00 | $5.00 | $5.54 | $5.00 |
| 37 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,324 | $3.20 | $6.75 | $5.50 | $5.00 | $5.00 | $5.54 | $5.00 |
| 38 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 26 | $7.00 | $16.50 | $13.20 | $6.00 | $12.50 | $13.33 | $12.03 |
| 39 | Eliminating existing PM & markers (6") (677-7002) | LF | 721 | $2.20 | $4.15 | $3.30 | $5.00 | $5.90 | $3.33 | $3.00 |
| 40 | Eliminating existing PM & markers (24") (677-7008) | LF | 379 | $12.00 | $8.25 | $6.60 | $20.00 | $13.25 | $6.65 | $6.00 |
| 41 | Pavement surface preparation for marking (4") (678-7001) | LF | 717 | $2.20 | $4.15 | $3.30 | $3.00 | $3.00 | $3.33 | $3.00 |
| 42 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,324 | $2.00 | $4.15 | $3.30 | $5.00 | $3.00 | $3.33 | $3.00 |
| 43 | Pavement surface preparation for marking (12") (678-7006) | LF | 82 | $3.00 | $4.15 | $3.30 | $12.00 | $3.00 | $3.33 | $3.00 |
| 44 | Pavement surface preparation for marking (24") (678-7008) | LF | 431 | $4.00 | $8.25 | $6.60 | $20.00 | $6.00 | $6.65 | $6.00 |
| 45 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 260 | $9.00 | $3.50 | $5.50 | $3.00 | $3.00 | $3.33 | $3.00 |
| 46 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 270 | $9.00 | $4.75 | $7.70 | $3.00 | $4.00 | $4.43 | $4.00 |
| 47 | Reloct RDSD FLSH BCN AM (solar PWRD) (685-7005) | EACH | 2 | $6,000.00 | $13,964 | $9,350.00 | $12,500 | $20,000 | $13,301 | $12,000 |
| 48 | Pedestrian pole assembly (687-7001) | EACH | 2 | $7,900.00 | $5,528.00 | $4,950.00 | $6,500.00 | $7,500.00 | $5,264.83 | $4,750.00 |
| 49 | Remove pedestrian pole assembly (687-7005) | EACH | 1 | $2,000.00 | $873.00 | $550.00 | $2,500.00 | $750.00 | $831.29 | $750.00 |
| 50 | Removal of ground boxes (690-7006) | EACH | 2 | $650.00 | $873.00 | $55.00 | $500.00 | $750.00 | $831.29 | $750.00 |
| 51 | Install LED traffic signal lamp unit (690-7092) | EACH | 4 | $7,750.00 | $117.00 | $2,200.00 | $1,000.00 | $100.00 | $110.84 | $100.00 |
| 52 | Removing pedestrian signal LED traffic signal lamp unit (690-7094) | EACH | 4 | $1,950.00 | $117.00 | $220.00 | $500.00 | $100.00 | $110.84 | $100.00 |
| 53 | Relocate of pedestrian push button (690-7123) | EACH | 4 | $5,250.00 | $117.00 | $550.00 | $1,150.00 | $100.00 | $110.84 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.