TxDOT contract A00210124 bid tabulation
METAL BEAM GUARD FENCE REPAIR, FM2001 (VARIOUS LOCATIONS IN HAYS to TRAVIS AND CALDWELL COUNTIES). Let by Texas DOT on April 4, 2025, Hays, Austin District. 4 bids received; low bid $535,512 by BK Field Operations LLC, -57% against the engineer's estimate of $1,248,865.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 51
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BK Field Operations LLC | $535,512 | Low | -57% |
| 2 | Austin Barricade Company, L.L.C. | $652,490 | +22% | -48% |
| 3 | T&L Cleaning Services LLC | $1,174,533 | +119% | -6.0% |
| 4 | Roy Jorgensen Associates, Inc. | $1,421,454 | +165% | +14% |
Engineer's estimate: $1,248,865.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. BK Field Operations LLC | 2. Austin Barricade Company, L.L.C. | 3. T&L Cleaning Services LLC | 4. Roy Jorgensen Associates, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 400 | $50.00 | $20.00 | $1.00 | $1.00 | $50.00 |
| 2 | Riprap (concrete)(5 in) (432-7002) | CY | 25 | $600.00 | $250.00 | $150.00 | $400.00 | $900.00 |
| 3 | Riprap (mow strip)(4 in) (432-7013) | CY | 55 | $600.00 | $300.00 | $150.00 | $500.00 | $675.00 |
| 4 | Retrofit rail (type T221) (451-7004) | LF | 5 | $180.00 | $150.00 | $250.00 | $50.00 | $2,500.00 |
| 5 | Mobilization (callout) (500-7002) | EACH | 1,150 | $1.00 | $1.00 | $0.10 | $1.00 | $0.01 |
| 6 | Portable changeable message sign (503-7001) | DAY | 5 | $150.00 | $100.00 | $450.00 | $300.00 | $150.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 125 | $100.00 | $1.00 | $1.00 | $1.00 | $1,000.00 |
| 8 | Temporary sediment control fence (install) (506-7039) | LF | 155 | $5.00 | $3.00 | $1.00 | $3.00 | $5.00 |
| 9 | Temporary sediment control fence (remove) (506-7041) | LF | 155 | $5.00 | $1.00 | $1.00 | $1.00 | $2.00 |
| 10 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,900 | $25.00 | $0.10 | $8.00 | $27.00 | $38.00 |
| 11 | Metal W-beam guard fence (steel post) (540-7002) | LF | 5 | $70.00 | $50.00 | $80.00 | $40.00 | $42.50 |
| 12 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 5 | $2,050.00 | $5.00 | $100.00 | $1,500.00 | $2,200.00 |
| 13 | Downstream anchor terminal section (540-7015) | EACH | 45 | $850.00 | $5.00 | $1.00 | $1,000.00 | $1,250.00 |
| 14 | Metal beam guard fence trans (31"-28") (540-7028) | EACH | 30 | $250.00 | $1.00 | $1.00 | $100.00 | $250.00 |
| 15 | Remove metal beam guard fence (542-7001) | LF | 1,665 | $1.00 | $0.10 | $1.00 | $0.01 | $4.00 |
| 16 | Remove terminal anchor section (542-7002) | EACH | 45 | $1,000.00 | $1.00 | $1.00 | $1.00 | $250.00 |
| 17 | Remove downstream anchor terminal (542-7003) | EACH | 5 | $250.00 | $2,000.00 | $1.00 | $100.00 | $250.00 |
| 18 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 5 | $200.00 | $10.00 | $1.00 | $1,500.00 | $500.00 |
| 19 | Guardrail end treatment (install) (544-7001) | EACH | 15 | $3,000.00 | $1.00 | $1,000.00 | $2,000.00 | $3,200.00 |
| 20 | Install delineator assembly (D-SW)SZ 2(WC)GND (658-7009) | EACH | 10 | $5.00 | $1.00 | $5.00 | $1.00 | $105.00 |
| 21 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015) | EACH | 45 | $40.00 | $1.00 | $25.00 | $1.00 | $50.00 |
| 22 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 40 | $25.00 | $1.00 | $25.00 | $1.00 | $50.00 |
| 23 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 40 | $45.00 | $1,000.00 | $50.00 | $1.00 | $50.00 |
| 24 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $10.00 | $1,500.00 | $100.00 | $1.00 | $50.00 |
| 25 | Install delineator assembly (D-SY)SZ 2(WC)GND (658-7028) | EACH | 5 | $100.00 | $1.00 | $5.00 | $1.00 | $200.00 |
| 26 | Install delineator assembly (D-SY)SZ 1(BRF)GF1 (658-7034) | EACH | 45 | $10.00 | $1.00 | $25.00 | $1.00 | $30.00 |
| 27 | Install delineator assembly (D-SY)SZ 1(BRF)GF1 (BR) (658-7035) | EACH | 15 | $150.00 | $1.00 | $50.00 | $1.00 | $30.00 |
| 28 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 5 | $120.00 | $1.00 | $5.00 | $900.00 | $105.00 |
| 29 | Replace rail element (W-beam) (770-7001) | LF | 4,800 | $30.00 | $1.00 | $15.00 | $24.00 | $30.00 |
| 30 | Replace rail element (thrie-beam) (770-7002) | LF | 30 | $30.00 | $100.00 | $55.00 | $20.00 | $35.00 |
| 31 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 5 | $30.00 | $100.00 | $350.00 | $50.00 | $500.00 |
| 32 | Replace short radius sys (TL-3) (770-7005) | EACH | 10 | $3,000.00 | $1.00 | $1.00 | $20,000 | $1.00 |
| 33 | Replace timber post W/O concrete FND (770-7006) | EACH | 125 | $40.00 | $200.00 | $25.00 | $30.00 | $105.00 |
| 34 | Replace steel post W/O concrete FND (770-7007) | EACH | 55 | $40.00 | $1.00 | $1.00 | $50.00 | $80.00 |
| 35 | Replace timber post W/ concrete FND (770-7008) | EACH | 125 | $40.00 | $300.00 | $150.00 | $30.00 | $120.00 |
| 36 | Replace steel post W/ concrete FND (770-7009) | EACH | 55 | $40.00 | $1.00 | $1.00 | $75.00 | $80.00 |
| 37 | Realign posts (770-7010) | EACH | 270 | $100.00 | $200.00 | $100.00 | $5.00 | $25.00 |
| 38 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 115 | $3,500.00 | $1,900.00 | $3,000.00 | $4,500.00 | $4,200.00 |
| 39 | Replace single gdrail terminal rail (770-7016) | LF | 5 | $1,000.00 | $175.00 | $100.00 | $50.00 | $100.00 |
| 40 | Replace single gdrail terminal post (770-7017) | EACH | 5 | $250.00 | $500.00 | $100.00 | $50.00 | $150.00 |
| 41 | Replace blockout (770-7018) | EACH | 445 | $200.00 | $6.00 | $50.00 | $5.00 | $90.00 |
| 42 | Repair steel post with base plate (770-7019) | EACH | 10 | $150.00 | $1.00 | $100.00 | $200.00 | $400.00 |
| 43 | Repair rail element (curved rail) (770-7027) | LF | 1,000 | $31.00 | $20.00 | $45.00 | $25.00 | $35.00 |
| 44 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 100 | $180.00 | $1.00 | $100.00 | $180.00 | $150.00 |
| 45 | Replace posts (TL-4)(NU-cable) (771-7006) | EACH | 100 | $180.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 46 | Replace posts (TL-4)(trinity) (771-7007) | EACH | 100 | $180.00 | $500.00 | $1.00 | $220.00 | $305.00 |
| 47 | Replace posts (TL-4)(brifen) (771-7008) | EACH | 100 | $180.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 48 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 15 | $1,500.00 | $1.00 | $1,500.00 | $1.00 | $1,000.00 |
| 49 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 30 | $3,000.00 | $500.00 | $500.00 | $1,200.00 | $3,900.00 |
| 50 | Replace cable (TL-4) (771-7016) | LF | 110 | $10.00 | $4.00 | $10.00 | $0.01 | $5.00 |
| 51 | Repair (steel post W/ base plate)(T101) (776-7007) | EACH | 5 | $80.00 | $25.00 | $100.00 | $200.00 | $750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.