TxDOT contract A00211858 bid tabulation

Bridge Maintenance, SH 75 (At Caney Creek to .). Let by Texas DOT on January 7, 2026, Freestone, Bryan District. 4 bids received; low bid $2,822,101 by Gibson & Associates, Inc., +8.2% against the engineer's estimate of $2,607,253.

Owner
Texas DOT
Letting
07 JAN 2026
Pay items
75
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Gibson & Associates, Inc.$2,822,101Low+8.0%
2Ragle Construction, Inc.$2,851,489+1.0%+9.0%
3Structural Integrity Group LLC$3,088,026+9.0%+18%
4Built Right Construction of Oklahoma, LLC$3,152,673+12%+21%
TxDOT contract A00211858: bids by rank

Engineer's estimate: $2,607,253.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Gibson & Associates, Inc.2. Ragle Construction, Inc.3. Structural Integrity Group LLC4. Built Right Construction of Oklahoma, LLC
1Preparing row (100-7002)STA2$2,000.00$2,200.00$100,000$2,750.00$1,000.00
2Removing concrete (curb) (104-7016)LF112$20.00$78.00$13.00$15.00$15.00
3Embankment (vehicle)(OC)(type C) (132-7017)CY83$65.00$60.50$60.00$30.00$25.00
4Furn & place topsoil (4") (160-7002)SY5,802$5.75$6.00$1.75$8.75$12.50
5Broadcast seed (permanent_rural_clay) (164-7002)SY5,802$0.75$0.55$0.45$1.00$1.50
6Vegetative watering (168-7001)TGL2$52.00$550.00$250.00$500.00$300.00
7SP mixes SP-C sac-A PG70-22 (344-7020)TON1,022$118.00$198.00$220.00$180.00$210.00
8Tack coat (344-7077)GAL930$4.00$6.60$8.00$6.00$8.00
9Planing asphalt concrete pavement(0" to 4") (354-7034)SY2,558$6.60$5.00$14.25$10.00
10Planing asphalt concrete pavement(0" to 6") (354-7035)SY1,391$10.00$7.70$9.00$19.50$10.00
11Planing asphalt concrete pavement(0" to 8") (354-7036)SY8,401$11.00$8.80$7.50$13.25$10.00
12Cem stabil BKFL (400-7010)CY56$265.00$302.50$130.00$345.00$400.00
13Temporary special shoring (cofferdam) (403-7002)SF3,324$1.00$1.00$40.00$30.00
14Class C concrete(pile encasement) (420-7059)LF115$500.00$365.00$325.00$1,500.00
15Penetrating concrete surface treatment (428-7001)SY320$48.40$18.00$22.00$30.00
16Concrete structure repair(clean & coat WTH epoxy) (429-7001)SF86$200.00$148.50$175.00$198.00$325.00
17Concrete structure repair(rapid deck rep(PRT DPT) (429-7004)SF740$100.00$10.00$40.00$118.00$325.00
18Concrete structure repair(rapid deck rep(full DPT)) (429-7006)SF310$170.00$50.00$75.00$145.00$325.00
19Concrete structure repair (vertical & overhead) (429-7007)SF293$350.00$176.00$125.00$221.00$275.00
20Concrete structure repair (standard) (429-7009)SF100$150.00$176.00$175.00$150.00$250.00
21Riprap (mow strip)(4 in) (432-7013)CY151$750.00$627.00$520.00$675.00$650.00
22Riprap (stone protection)(18 in) (432-7043)CY178$250.00$200.20$190.00$325.00$250.00
23Riprap (stone protection)(24 in) (432-7045)CY78$203.50$190.00$240.00$250.00
24Cleaning and sealing existing joints (438-7001)LF1,096$30.00$26.40$30.00$65.00$60.00
25Polyester polymer concrete overlay (3/4") (439-7015)SY2,910$108.00$167.00$165.00$157.00$115.00
26Miscellaneous non-bridge (nbis) (442-7017)LB224$25.00$45.00$30.00$353.00$50.00
27Retrofit rail (type T221) (451-7004)LF228$408.00$200.00$295.00$200.00
28Retrofit rail (type T131RC) (451-7049)LF1,183$232.00$178.20$175.00$203.00$235.00
29Pipe (galvanized) (4 in X 6 in) (481-7048)LF19$575.00$95.00$150.00$525.00
30Mobilization (500-7001)LS1$260,000$283,000$280,000$303,000$220,000
31Barricades, signs and traffic handling (502-7001)MO6$4,000.00$38,500$35,000$7,625.00$3,000.00
32Portable changeable message sign (503-7001)DAY144$95.00$115.00$100.00$50.00$60.00
33TMA (stationary) (505-7001)DAY90$300.00$500.00$250.00$200.00$300.00
34TMA (mobile operation) (505-7003)DAY8$500.00$500.00$600.00$500.00$300.00
35Construction exits (install) (type 2) (506-7021)SY624$20.00$22.00$45.00$45.00$40.00
36Construction exits (remove) (506-7024)SY624$10.00$11.00$12.00$10.00$15.00
37Temporary sediment control fence (install) (506-7039)LF1,050$4.00$7.70$5.00$4.50$6.00
38Temporary sediment control fence (remove) (506-7041)LF1,050$1.00$2.20$1.50$1.00$2.00
39One-way traffic control (port traffic signal) (510-7003)MO3$6,000.00$6,500.00$5,000.00$10,000$8,500.00
40Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF450$66.00$150.00$59.00$110.00
41Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF1,050$45.00$10.00$12.00$30.00
42Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF450$45.00$20.00$40.00$30.00
43Metal W-beam guard fence (timber post) (540-7001)LF1,462.50$31.00$22.55$30.50$22.50$27.00
44Metal beam guard fence trans (thrie-beam) (540-7005)EACH12$2,450.00$1,677.50$2,750.00$2,200.00$2,000.00
45Remove metal beam guard fence (542-7001)LF1,225$6.00$2.75$5.00$3.00$3.00
46Remove terminal anchor section (542-7002)EACH15$275.00$165.00$500.00$150.00$225.00
47RM metal beam guard fence trans (T101) (542-7005)EACH12$600.00$165.00$500.00$125.00$225.00
48Guardrail end treatment (install) (544-7001)EACH12$3,400.00$3,300.00$3,750.00$2,950.00$4,000.00
49Guardrail end treatment (remove) (544-7003)EACH5$530.00$220.00$500.00$250.00$350.00
50Crash cushion attenuator (move & reset) (545-7002)EACH6$2,200.00$1,250.00$1,100.00$2,500.00
51Crash cushion attenuator (remove) (545-7004)EACH2$1,100.00$1,250.00$1,100.00$1,300.00
52Cca (install)(N)(TL3)(work zone) (545-7018)EACH2$9,350.00$10,000$8,750.00$11,000
53Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH4$19.80$30.00$20.00$25.00
54Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH37$35.00$27.50$40.00$25.00$30.00
55Work zone pavement marking removing (W)6"(solid) (662-7068)LF3,620$1.50$1.07$1.25$0.97$1.50
56Work zone pavement marking removing (W)24"(solid) (662-7077)LF288$10.00$1.38$12.00$1.25$15.00
57Work zone pavement marking removing (Y)6"(solid) (662-7100)LF28,800$2.00$1.07$1.25$0.97$1.40
58Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,065$1.50$2.00$1.00$2.00$0.01
59Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF21,680$0.65$0.44$1.00$0.40$1.00
60Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF6,390$0.40$0.50$1.00$0.45$1.00
61Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF7,610$0.65$0.44$1.00$0.40$1.00
62Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265)LF24,840$1.50$0.94$0.95$0.85$1.60
63Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269)LF7,750$1.50$0.94$0.95$0.85$1.60
64Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273)LF6,945$1.50$0.99$0.95$0.90$1.60
65Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF2,940$0.80$0.83$0.95$0.75$1.20
66Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF330$1.00$0.88$0.95$0.80$1.20
67Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF715$0.83$0.95$0.75$1.20
68Prefabricated PM type C (W)(24")(solid) (668-7089)LF950$14.58$12.00$13.25$20.00
69Reflectorized pavement marker type II-A-A (672-7004)EACH1,752$7.00$5.50$8.00$5.00$10.00
70Eliminating existing PM & markers (4") (677-7001)LF39,670$1.00$0.58$1.25$0.53$0.60
71Pavement surface preparation for marking (6") (678-7002)LF35,780$0.50$0.39$0.50$0.35$0.15
72Concrete CRCK repair(discrete)(rout and seal) (780-7003)LF3$55.00$350.00$500.00$120.00
73Rep steel bridge MBR (straighten memb) (784-7020)EACH23$1,600.00$2,000.00$7,250.00$1,500.00
74Carbon fiber reinforced polymer strengthning (786-7002)SF454$182.00$75.00$203.00$135.00
75Steel bridge zone painting (4010-7013)LS1$132,550$81,000$98,000$115,000
TxDOT contract A00211858: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy