TxDOT contract A00218315 bid tabulation

METAL BEAM GUARD FENCE REPAIR, IH0045 (Various to Various). Let by Texas DOT on December 10, 2025, Walker, Bryan District. 5 bids received; low bid $268,385 by Rhino Equity, LLC, -31% against the engineer's estimate of $389,575.

Owner
Texas DOT
Letting
10 DEC 2025
Pay items
44
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Rhino Equity, LLC$268,385Low-31%
2Roy Jorgensen Associates, Inc.$324,000+21%-17%
3Above All Contracting LLC$324,545+21%-17%
4T&L Cleaning Services LLC$354,457+32%-9.0%
5Hazmat International, Inc.$462,100+72%+19%
TxDOT contract A00218315: bids by rank

Engineer's estimate: $389,575.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Rhino Equity, LLC2. Roy Jorgensen Associates, Inc.3. Above All Contracting LLC4. T&L Cleaning Services LLC5. Hazmat International, Inc.
1Riprap (mow strip)(4 in) (432-7013)CY10$700.00$200.00$650.00$600.00$500.00$10.00
2Mobilization (callout) (500-7002)EACH20$1,000.00$1.00$2,000.00$1.00$1.00$250.00
3TMA (stationary) (505-7001)DAY50$500.00$1.00$500.00$1.00$1,000.00$2,000.00
4Metal W-beam guard fence (timber post) (540-7001)LF500$35.00$50.00$30.00$30.00$40.00$20.00
5Metal W-beam guard fence (steel post) (540-7002)LF200$40.00$30.00$32.00$50.00$1.00$55.00
6Metal beam guard fence trans (thrie-beam) (540-7005)EACH5$2,200.00$1,600.00$1,800.00$2,200.00$1.00$2,200.00
7Metal W-beam guard fence adjustment (540-7009)LF25$20.00$1.00$10.00$20.00$1.00$25.00
8Downstream anchor terminal section (540-7015)EACH5$1,700.00$2,000.00$1,150.00$1,800.00$1,500.00$3,500.00
9Remove metal beam guard fence (542-7001)LF500$6.00$1.00$2.00$5.00$0.01$1.00
10Remove terminal anchor section (542-7002)EACH5$300.00$1.00$100.00$300.00$1.00$25.00
11Remove downstream anchor terminal (542-7003)EACH5$260.00$1.00$200.00$200.00$1.00$25.00
12Guardrail end treatment (install) (544-7001)EACH5$3,400.00$2,000.00$3,000.00$3,000.00$3,000.00$3,500.00
13Guardrail end treatment (remove) (544-7003)EACH5$470.00$1.00$250.00$200.00$1.00$25.00
14Replace rail element (W-beam) (770-7001)LF1,500$25.00$14.00$15.00$25.00$20.00$10.50
15Replace rail element (thrie-beam) (770-7002)LF50$50.00$10.00$25.00$75.00$20.00$25.00
16Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH20$80.00$10.00$200.00$500.00$20.00$250.00
17Replace timber post W/O concrete FND (770-7006)EACH100$60.00$50.00$80.00$50.00$1.00$100.00
18Replace steel post W/O concrete FND (770-7007)EACH25$80.00$55.00$40.00$75.00$1.00$100.00
19Replace timber post W/ concrete FND (770-7008)EACH50$85.00$50.00$40.00$50.00$1.00$100.00
20Replace steel post W/ concrete FND (770-7009)EACH10$95.00$100.00$250.00$100.00$1.00$150.00
21Realign posts (770-7010)EACH100$35.00$5.00$5.00$20.00$1.00$50.00
22Rem obsolete get & repl W/ SGT (770-7013)EACH25$4,400.00$4,000.00$2,800.00$3,300.00$6,500.00$3,500.00
23Repl single gdrail terminal impact head (770-7015)EACH5$1,000.00$800.00$1,100.00$900.00$1,000.00$750.00
24Replace single gdrail terminal rail (770-7016)LF500$50.00$40.00$25.00$30.00$50.00$55.00
25Replace single gdrail terminal post (770-7017)EACH10$150.00$100.00$70.00$120.00$100.00$40.00
26Replace blockout (770-7018)EACH100$40.00$30.00$20.00$30.00$1.00$65.00
27Repair steel post with base plate (770-7019)EACH5$150.00$1.00$150.00$250.00$200.00$350.00
28Reset SGT impact head (770-7020)EACH5$240.00$200.00$150.00$100.00$1.00$125.00
29Replace SGT object marker (770-7021)EACH5$20.00$1.00$40.00$30.00$1.00$25.00
30Replace SGT cable anchor (770-7022)EACH5$20.00$1.00$40.00$100.00$1.00$75.00
31Replace SGT cable assembly (770-7023)EACH5$40.00$1.00$60.00$100.00$1.00$100.00
32Replace SGT strut (770-7024)EACH5$70.00$1.00$60.00$100.00$1.00$75.00
33Raise rail (770-7025)LF100$10.00$1.00$10.00$10.00$0.01$25.00
34Replace downstream anchor terminal (770-7026)EACH5$1,000.00$200.00$1,000.00$1,700.00$1,200.00$2,500.00
35Repair rail element (curved rail) (770-7027)LF20$35.00$20.00$30.00$75.00$50.00$55.00
36Replace posts (TL-4)(gibraltar) (771-7005)EACH50$190.00$150.00$120.00$200.00$150.00$500.00
37Replace posts (TL-4)(NU-cable) (771-7006)EACH50$190.00$1.00$180.00$125.00$1.00$25.00
38Replace posts (TL-4)(trinity) (771-7007)EACH50$190.00$350.00$400.00$200.00$200.00$500.00
39Cable splice / turnbuckle (TL-4) (771-7010)EACH5$95.00$300.00$150.00$300.00$150.00$25.00
40Repair concrete foundation (TL-4) (771-7012)EACH5$130.00$1.00$250.00$500.00$1.00$25.00
41Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH10$1,500.00$1,500.00$1,500.00$3,000.00$500.00$3,500.00
42Replace cable (TL-4) (771-7016)LF100$10.00$1.00$3.00$10.00$0.01$15.00
43Check / RE-tension cable (TL-4) (771-7018)EACH20$230.00$1.00$100.00$200.00$1.00$200.00
44Replace post hardware (TL-4) (771-7020)EACH50$70.00$50.00$30.00$50.00$1.00$100.00
TxDOT contract A00218315: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of December 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy