VDOT contract C0000115116C01 bid tabulation
Smart scale - intersection safety improvements. Let by Virginia DOT on July 22, 2026, King George, Fredericksburg. 2 bids received; low bid $3,058,652 by J. L. Kent & Sons, Inc..
- Owner
- Virginia DOT
- Letting
- 22 JUL 2026
- Pay items
- 134
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | J. L. Kent & Sons, Inc. | $3,058,652 | Low |
| 2 | Ardent Company, LLC | $5,684,700 | +86% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. J. L. Kent & Sons, Inc. | 2. Ardent Company, LLC |
|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0001) | LS | 1 | $7,520.00 | $25,000 |
| 0001-0020 | 15" conc. pipe (302SD20-0025) | LF | 155 | $94.20 | $90.00 |
| 0001-0030 | 24" pipe (302SD20-0037) | LF | 14 | $269.60 | $100.00 |
| 0001-0040 | 15" end section ES-1 (302SD20-0199) | EACH | 1 | $1,395.00 | $1,502.92 |
| 0001-0050 | 24" end section ES-1 or 2 (302SD20-0204) | EACH | 1 | $869.00 | $2,000.00 |
| 0001-0060 | Drop inlet DI-3B,L=4' (302SD20-0311) | EACH | 1 | $5,990.00 | $9,000.00 |
| 0001-0070 | Drop inlet DI-7 (302SD20-0447) | EACH | 2 | $5,500.00 | $7,000.00 |
| 0001-0080 | Manhole MH-1 or 2 (302SD20-0662) | LF | 5.90 | $1,160.00 | $500.00 |
| 0001-0090 | Frame & cover MH-1 (302SD20-0663) | EACH | 1 | $1,090.00 | $750.00 |
| 0001-0100 | NS drainage special design precast inlet (302SX20-0022) | EACH | 1 | $9,790.00 | $8,000.00 |
| 0001-0110 | Regular excavation (303SD20-0001) | CY | 2,094 | $94.00 | $45.00 |
| 0001-0120 | Borrow excavation (303SD20-0007) | CY | 1,232 | $48.70 | $30.00 |
| 0001-0130 | Erosion control mulch (303SD20-0019) | SY | 5 | $1.50 | $10.00 |
| 0001-0140 | Check dam rock TY. II (303SD20-0023) | EACH | 6 | $344.50 | $500.00 |
| 0001-0150 | Siltation control excavation (303SD20-0029) | CY | 165 | $1.00 | $10.00 |
| 0001-0160 | Inlet protection type A (303SD20-0030) | EACH | 4 | $600.00 | $250.00 |
| 0001-0170 | Inlet protection type B (303SD20-0031) | EACH | 7 | $164.00 | $250.00 |
| 0001-0180 | Temp. silt fence type A (303SD20-0034) | LF | 361 | $6.00 | $1.50 |
| 0001-0190 | Aggr. base matl. TY. I no. 21B (308SD20-0012) | TON | 2,040 | $70.00 | $40.00 |
| 0001-0200 | Asphalt concrete TY. SM- 12.5D const (315SD20-0002) | TON | 1,381 | $190.15 | $150.00 |
| 0001-0210 | Asphalt concrete TY. IM- 19.0A const (315SD20-0004) | TON | 181 | $233.80 | $150.00 |
| 0001-0220 | Asphalt concrete BM-25.0 (315SD20-0010) | TON | 537 | $226.40 | $150.00 |
| 0001-0230 | NS saw-cut asph conc full depth (315SX20-0011) | LF | 2,248 | $5.70 | $2.00 |
| 0001-0240 | Erosion CTRL. stone CL. A1, EC-1 (414SD20-0001) | TON | 5.30 | $328.00 | $50.00 |
| 0001-0250 | Dry riprap CL. AI (414SD20-0008) | TON | 15 | $328.00 | $60.00 |
| 0001-0260 | Underdrain UD-4 (501SD20-0004) | LF | 691 | $22.40 | $12.00 |
| 0001-0270 | Outlet pipe (501SD20-0009) | LF | 34 | $25.80 | $10.00 |
| 0001-0280 | Curb, STD. CG-2 (502SD20-0011) | LF | 138 | $56.40 | $25.00 |
| 0001-0290 | Curb, radial CG-2 (502SD20-0012) | LF | 158 | $52.00 | $25.00 |
| 0001-0300 | Curb, STD. CG-3 (502SD20-0014) | LF | 191 | $46.90 | $25.00 |
| 0001-0310 | Curb, radial CG-3 (502SD20-0015) | LF | 196 | $46.90 | $25.00 |
| 0001-0320 | Comb. curb & gutter, STD. CG-6 (502SD20-0022) | LF | 52 | $52.50 | $35.00 |
| 0001-0330 | Comb. curb & gutter, rad. CG-6 (502SD20-0023) | LF | 48 | $52.50 | $35.00 |
| 0001-0340 | Comb. curb & gutter, STD. CG-7 (502SD20-0024) | LF | 710 | $51.80 | $35.00 |
| 0001-0350 | Comb. curb & gutter, rad. CG-7 (502SD20-0025) | LF | 197 | $55.90 | $35.00 |
| 0001-0360 | Median strip MS-1A (502SD20-0056) | SY | 199 | $245.00 | $110.00 |
| 0001-0370 | NS saw cut H.C.C. items saw cut exist. sidewalk & curb and gutter (502SX20-0010) | LF | 81 | $7.30 | $5.00 |
| 0001-0380 | CG-12 detectable warning surface (504SD20-0002) | SY | 17 | $693.00 | $350.00 |
| 0001-0390 | Hydr. cement conc. sidewalk 4" (504SD20-0003) | SY | 261 | $95.60 | $70.00 |
| 0001-0400 | Handrail HR-1 type II (504SD20-0014) | LF | 14 | $874.60 | $350.00 |
| 0001-0410 | Obscuring roadway (508SD20-0001) | UNIT | 3.60 | $100.00 | $1,500.00 |
| 0001-0420 | Demo. of pavement flexible (508SD20-0004) | SY | 1,214 | $25.10 | $15.00 |
| 0001-0430 | Allaying dust (511SD20-0001) | HR | 80 | $30.00 | $40.00 |
| 0001-0440 | Type 3 barricade 4' (512SD20-0012) | EACH | 18 | $250.00 | $350.00 |
| 0001-0450 | Temporary sign (512SD20-0014) | SF | 850 | $39.70 | $20.00 |
| 0001-0460 | Group 2 channelizing devices (512SD20-0024) | DAY | 20,000 | $0.80 | $0.50 |
| 0001-0470 | Port.changeable mess. sign (512SD20-0025) | HR | 1,500 | $7.55 | $2.00 |
| 0001-0480 | Electronic arrow board (512SD20-0026) | HR | 3,000 | $2.00 | $2.00 |
| 0001-0490 | Warning light TY. B (512SD20-0029) | DAY | 1,280 | $1.00 | $3.00 |
| 0001-0500 | Eradicate linear PVMT MRKG (512SD20-0042) | LF | 200 | $8.95 | $5.00 |
| 0001-0510 | Temp. PVMT MRKG TY. A, 4" (512SD20-0046) | LF | 400 | $4.70 | $2.50 |
| 0001-0520 | Temp. PVMT MRKG TY. A, 24" (512SD20-0050) | LF | 30 | $47.20 | $20.00 |
| 0001-0530 | NS modify signal modify signal (512SX20-0020) | LS | 1 | $16,500 | $75,000 |
| 0001-0540 | Mobilization (513SD20-0001) | LS | 1 | $150,000 | $3,533,980 |
| 0001-0550 | Field office TY.III (514SD20-0003) | MO | 14 | $3,660.00 | $3,000.00 |
| 0001-0560 | Flexible pave.planing 0"-2" (515SD20-0004) | SY | 10,891 | $5.49 | $4.00 |
| 0001-0570 | Construction surveying constr. (517SD20-0001) | LS | 1 | $25,064 | $50,000 |
| 0001-0580 | Topsoil class A (602SD20-0002) | CY | 183 | $162.90 | $40.00 |
| 0001-0590 | Temporary seed (603SD20-0002) | LB | 68 | $39.50 | $2.00 |
| 0001-0600 | Regular seed (603SD20-0003) | LB | 187 | $43.60 | $2.00 |
| 0001-0610 | Overseeding (603SD20-0004) | LB | 150 | $19.70 | $2.00 |
| 0001-0620 | Hydraulic erosion control product type 2 (603SD20-0008) | SY | 4,114 | $1.11 | $1.00 |
| 0001-0630 | Hydraulic erosion control product type 3 (603SD20-0009) | SY | 3,297 | $1.40 | $1.00 |
| 0001-0640 | Fertilizer nitrogen - N (603SD20-0014) | LB | 104 | $2.67 | $2.00 |
| 0001-0650 | Fertilizer phosphorous - P (603SD20-0015) | LB | 48 | $2.67 | $2.00 |
| 0001-0660 | Fertilizer potassium - K (603SD20-0016) | LB | 48 | $2.67 | $2.00 |
| 0001-0670 | Lime (603SD20-0017) | TON | 3.74 | $477.00 | $250.00 |
| 0001-0680 | Rolled erosion CTRL product EC-2 type 1 (606SD20-0001) | SY | 235 | $5.50 | $2.00 |
| 0001-0690 | Rolled erosion CTRL product EC-3 type 3 (606SD20-0007) | SY | 10 | $61.00 | $2.00 |
| 0001-0700 | Remove existing 1 post sign structure (700SD20-0003) | EACH | 5 | $80.90 | $100.00 |
| 0001-0710 | Relocate EX. 2 post GRND mount SGN panel (700SD20-0013) | EACH | 1 | $805.00 | $200.00 |
| 0001-0720 | Sign post STP-1, 2", 14 gauge (700SD20-0034) | LF | 106 | $26.04 | $6.00 |
| 0001-0730 | Sign post STP-1, 2 3/16", 10 gauge (700SD20-0035) | LF | 108 | $29.97 | $12.00 |
| 0001-0740 | Sign post STP-1, 2 1/2", 10 gauge (700SD20-0036) | LF | 282 | $34.22 | $13.00 |
| 0001-0750 | Sign post STP-1, 2 1/2", 12 gauge (700SD20-0037) | LF | 276 | $30.60 | $9.00 |
| 0001-0760 | Conc. found. STP-1, TY. B (700SD20-0039) | EACH | 20 | $775.00 | $260.00 |
| 0001-0770 | Conc. found. STP-1, TY. D (700SD20-0041) | EACH | 12 | $553.00 | $70.00 |
| 0001-0780 | Conc. found. STP-1, TY. E (700SD20-0042) | EACH | 28 | $553.00 | $100.00 |
| 0001-0790 | Electrical service SE-5 (700SD20-0060) | EACH | 2 | $4,890.00 | $1,500.00 |
| 0001-0800 | Pedestal pole PF-2, 12' (700SD20-0067) | EACH | 18 | $2,368.00 | $3,500.00 |
| 0001-0810 | Conc. found. PF-8 (700SD20-0068) | CY | 72 | $2,650.00 | $500.00 |
| 0001-0820 | Conc. found. PF-2 (700SD20-0069) | EACH | 18 | $1,850.00 | $2,500.00 |
| 0001-0830 | Signal mast arm pole MP- 3, TY. D (700SD20-0094) | EACH | 2 | $26,980 | $25,000 |
| 0001-0840 | Signal mast arm pole MP- 3, TY. E2 (700SD20-0096) | EACH | 2 | $33,830 | $40,000 |
| 0001-0850 | Mast arm 49' (700SD20-0100) | EACH | 2 | $16,200 | $16,000 |
| 0001-0860 | Mast arm 75', case 2 loading (700SD20-0105) | EACH | 2 | $24,480 | $24,000 |
| 0001-0870 | 14/4 conductor cable (700SD20-0112) | LF | 400 | $2.58 | $0.50 |
| 0001-0880 | 14/7 conductor cable (700SD20-0114) | LF | 3,200 | $2.58 | $0.50 |
| 0001-0890 | 14/1 conductor cable enclosed (700SD20-0118) | LF | 7,650 | $1.27 | $0.50 |
| 0001-0900 | 14/2 conductor cable shielded (700SD20-0120) | LF | 3,640 | $2.58 | $0.50 |
| 0001-0910 | Cat 5E direct burial cable (700SD20-0124) | LF | 2,000 | $2.58 | $0.50 |
| 0001-0920 | Electrical service work pad (700SD20-0174) | EACH | 2 | $2,310.00 | $2,500.00 |
| 0001-0930 | Junction box JB-S2 (700SD20-0178) | EACH | 14 | $2,108.00 | $1,500.00 |
| 0001-0940 | Junction box JB-S3 (700SD20-0179) | EACH | 2 | $2,570.00 | $2,000.00 |
| 0001-0950 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 10 | $316.00 | $350.00 |
| 0001-0960 | Conduit PVC 1" (700SD20-0182) | LF | 160 | $28.75 | $10.00 |
| 0001-0970 | Bored conduit 4" (700SD20-0193) | LF | 2,000 | $64.40 | $30.00 |
| 0001-0980 | Conduit PVC 2" (700SD20-0194) | LF | 2,000 | $11.80 | $12.00 |
| 0001-0990 | Conduit PVC 3" (700SD20-0195) | LF | 2,000 | $15.24 | $14.00 |
| 0001-1000 | Conduit PVC 4" (700SD20-0196) | LF | 90 | $28.75 | $16.00 |
| 0001-1010 | Trench excavation eci-1 (700SD20-0197) | LF | 2,200 | $28.80 | $15.00 |
| 0001-1020 | Test bore (700SD20-0199) | EACH | 6 | $3,373.00 | $4,500.00 |
| 0001-1030 | Traf. sig. head sect. 12" sel. view (700SX20-0005) | EACH | 12 | $1,024.00 | $950.00 |
| 0001-1040 | NS traffic signalization APS pedestrian actuation PA-2 (700SX20-0010) | EACH | 8 | $1,725.00 | $1,500.00 |
| 0001-1050 | NS traffic signalization atc cabinet type 2 (4 door configuration) (700SX20-0010) | EACH | 2 | $45,216 | $65,000 |
| 0001-1060 | NS traffic signalization concrete foundation CF- 5 (700SX20-0010) | EACH | 2 | $5,727.00 | $2,500.00 |
| 0001-1070 | NS traffic signalization mccain atc 2070 controller with D-4 firmware (700SX20-0010) | EACH | 2 | $9,004.00 | $10,000 |
| 0001-1080 | NS traffic signalization multi-sensor detection system MSDS (hybrid sensor) (700SX20-0010) | EACH | 2 | $11,860 | $5,000.00 |
| 0001-1090 | NS traffic signalization multi-sensor detection system MSDS central control unit (rack mount) (700SX20-0010) | EACH | 2 | $8,616.00 | $5,000.00 |
| 0001-1100 | NS traffic signalization multi-sensor detection system (MSDS) MSDS detection processor (700SX20-0010) | EACH | 2 | $9,375.00 | $5,000.00 |
| 0001-1110 | NS traffic signalization multi-sensor detection system MSDS (hybrid/radar detection camera) (700SX20-0010) | EACH | 4 | $5,121.00 | $3,500.00 |
| 0001-1120 | Sign panel (701SD20-0001) | SF | 853.50 | $34.70 | $55.00 |
| 0001-1130 | Flexible post delineator (702SD20-0002) | EACH | 19 | $275.00 | $50.00 |
| 0001-1140 | Traf. sig. head sect. 12" HVS backplate (703SD20-0007) | EACH | 96 | $500.00 | $550.00 |
| 0001-1150 | Evp detection system 2- way (703SD20-0021) | EACH | 1 | $8,665.00 | $16,000 |
| 0001-1160 | Evp detection system 4- way (703SD20-0023) | EACH | 1 | $12,850 | $18,000 |
| 0001-1170 | Evp detector cable (703SD20-0024) | LF | 1,200 | $10.90 | $0.50 |
| 0001-1180 | Loop detector amplifier (703SD20-0026) | EACH | 13 | $420.00 | $750.00 |
| 0001-1190 | Hanger assembly SM-3, one way (703SD20-0034) | EACH | 23 | $593.00 | $700.00 |
| 0001-1200 | Hanger assembly SMB-3, one way (703SD20-0039) | EACH | 4 | $369.00 | $650.00 |
| 0001-1210 | Loop saw cut 3/8" (703SD20-0042) | LF | 1,735 | $37.90 | $15.00 |
| 0001-1220 | Loop saw cut 5/8" (703SD20-0043) | LF | 450 | $38.00 | $20.00 |
| 0001-1230 | Uninterrupt. PWR supply type 2 (703SD20-0053) | EACH | 2 | $9,970.00 | $10,000 |
| 0001-1240 | Uninterrupt. PWR supply battery pac (703SD20-0054) | EACH | 2 | $4,324.00 | $5,500.00 |
| 0001-1250 | Pedestrian signal head SP-9 (703SD20-0061) | EACH | 14 | $1,093.00 | $900.00 |
| 0001-1260 | Type B class I PVMT line MRKG 4" (704SD20-0006) | LF | 7,094 | $1.99 | $0.82 |
| 0001-1270 | Type B class I PVMT line MRKG 6" (704SD20-0007) | LF | 440 | $5.60 | $2.50 |
| 0001-1280 | Type B class II PVMT line MRKG 8" (704SD20-0013) | LF | 560 | $7.40 | $4.60 |
| 0001-1290 | Type B class II PVMT line MRKG 24" (704SD20-0015) | LF | 475 | $22.05 | $17.00 |
| 0001-1300 | PVMT symb MRKG thru arrow TY B, CL II (704SD20-0045) | EACH | 4 | $349.00 | $240.00 |
| 0001-1310 | PVMT symb MRKG SGL turn arr. TY B CL II (704SD20-0048) | EACH | 24 | $447.00 | $277.00 |
| 0001-1320 | DBL turn arr.thru/LT or RT TY B, CL II (704SD20-0051) | EACH | 1 | $548.50 | $477.00 |
| 0001-1330 | Cellular/PCS wireless modem (807SD20-0001) | EACH | 2 | $6,726.00 | $6,000.00 |
| 0001-1340 | NS traffic signalization APS pedestrian actuation PA-3 (700SX20-0010) | EACH | 6 | $4,880.00 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of July 22, 2026. Compiled by Mirage Metrics.