Hurst Construction LLC: WSDOT bid record

Hurst Construction LLC submitted 15 bids on Washington State DOT contracts in the data, from 18 JAN 2007 to 01 FEB 2023, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +14% above the low bid.

Owner
Washington State DOT
Low bid volume
$437,186
Latest bid
01 FEB 2023
Data through
07 OCT 2026
15Bids
2Low bids
13Win rate, percent
+14%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
200711100%
2009200%
2011100%
2012100%
2013200%
2015100%
2017100%
20183133%
2021200%
2023100%
Hurst Construction LLC, WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NCR region13215%
SCR region200%
Hurst Construction LLC, WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion and sediment control leadDAY153 (20%)$93.00$100.00
Paint lineLF123 (25%)$0.30$0.25
Plastic traffic arrowEACH73 (43%)$250.00$135.00
Removing paint lineLF53 (60%)$0.38$0.70
Flexible guide postEACH122 (17%)$42.50$33.23
Painted drainage markingEACH62 (33%)$41.00$25.00
Cement concrete traffic curb and gutterLF52 (40%)$22.00$30.00
Roadway excavation including haulCY131 (8%)$20.00$20.00
Crushed surfacing base courseTON111 (9%)$37.00$26.44
Embankment compactionCY111 (9%)$3.25$3.50
Recessed pavement markerHUND71 (14%)$3,500.00$1,500.00
Shoring or extra excavation class BSF61 (17%)$1.25$1.00
Hurst Construction LLC, WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Selland Construction, Inc.96 of 9
Pipkin Inc., DBA Pipkin Constr73 of 7
Strider Construction Co., Inc.63 of 6
Krci LLC51 of 5
Granite Construction Company52 of 5
Central Washington Asphalt, I31 of 3
North Central Construction, In31 of 3
N.A. Degerstrom, Inc.30 of 3
Granite Northwest, Inc. DBA22 of 2
Apollo, Inc.22 of 2
Hurst Construction LLC, WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
01 FEB 2023009921NCR regionUs 2 / 97 easy street roundabout2 of 4$5,489,841+1.0%
13 JAN 2021009633NCR regionUs 2 ninth street curb ramp upgrades3 of 4$408,792+39%
06 JAN 2021009628NCR regionSr 17 s of rd m se railroad crossing improvements2 of 3$933,261+1.0%
25 APR 2018009261NCR regionUs 97 brays landing rd. intersection improvements1 of 3$214,584Low, 25% under the second
11 APR 2018009236NCR regionUs 97 n. of blewett pass culvert replacements3 of 6$1,298,788+19%
07 FEB 2018009196SCR regionI-182 queensgate dr - interchange improvements4 of 6$2,543,596+6.0%
01 FEB 2017009010NCR regionSr 150 no-see-um road intersection improvements5 of 6$6,388,333+21%
14 JAN 2015008701NCR regionUs 97a entiat pedestrian improvements 15b0052 of 6$273,724+14%
07 MAR 2013008424NCR regionUs 97 north of brewster passing lane3 of 5$1,093,701+12%
10 JAN 2013008409NCR regionUs 97 n of riverside nb passing lane4 of 7$874,649+5.0%
06 DEC 2012008385NCR regionUs 2 e. of coles corner box culvert5 of 9$844,445+31%
06 JAN 2011008058NCR regionNcr major drainage 20112 of 9$530,2800.0%
25 MAR 2009007702SCR regionI-182 rd. 100/broadmoor blvd. improvements6 of 6$1,309,656+32%
12 FEB 2009007668NCR regionUs 2 e. end odabashian bridge loop trail connection5 of 7$213,913+16%
18 JAN 2007007249NCR regionSr 262 potholes reservoir shoulder widening for pedestrians1 of 5$222,602Low, 6.0% under the second
Hurst Construction LLC: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy