Hurst Construction LLC: WSDOT bid record
Hurst Construction LLC submitted 15 bids on Washington State DOT contracts in the data, from 18 JAN 2007 to 01 FEB 2023, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $437,186
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2007 | 1 | 1 | 100% |
| 2009 | 2 | 0 | 0% |
| 2011 | 1 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 2 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2018 | 3 | 1 | 33% |
| 2021 | 2 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 13 | 2 | 15% |
| SCR region | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 15 | 3 (20%) | $93.00 | $100.00 | |
| Paint line | LF | 12 | 3 (25%) | $0.30 | $0.25 | |
| Plastic traffic arrow | EACH | 7 | 3 (43%) | $250.00 | $135.00 | |
| Removing paint line | LF | 5 | 3 (60%) | $0.38 | $0.70 | |
| Flexible guide post | EACH | 12 | 2 (17%) | $42.50 | $33.23 | |
| Painted drainage marking | EACH | 6 | 2 (33%) | $41.00 | $25.00 | |
| Cement concrete traffic curb and gutter | LF | 5 | 2 (40%) | $22.00 | $30.00 | |
| Roadway excavation including haul | CY | 13 | 1 (8%) | $20.00 | $20.00 | |
| Crushed surfacing base course | TON | 11 | 1 (9%) | $37.00 | $26.44 | |
| Embankment compaction | CY | 11 | 1 (9%) | $3.25 | $3.50 | |
| Recessed pavement marker | HUND | 7 | 1 (14%) | $3,500.00 | $1,500.00 | |
| Shoring or extra excavation class B | SF | 6 | 1 (17%) | $1.25 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Selland Construction, Inc. | 9 | 6 of 9 |
| Pipkin Inc., DBA Pipkin Constr | 7 | 3 of 7 |
| Strider Construction Co., Inc. | 6 | 3 of 6 |
| Krci LLC | 5 | 1 of 5 |
| Granite Construction Company | 5 | 2 of 5 |
| Central Washington Asphalt, I | 3 | 1 of 3 |
| North Central Construction, In | 3 | 1 of 3 |
| N.A. Degerstrom, Inc. | 3 | 0 of 3 |
| Granite Northwest, Inc. DBA | 2 | 2 of 2 |
| Apollo, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009921 | NCR region | Us 2 / 97 easy street roundabout | 2 of 4 | $5,489,841 | +1.0% |
| 13 JAN 2021 | 009633 | NCR region | Us 2 ninth street curb ramp upgrades | 3 of 4 | $408,792 | +39% |
| 06 JAN 2021 | 009628 | NCR region | Sr 17 s of rd m se railroad crossing improvements | 2 of 3 | $933,261 | +1.0% |
| 25 APR 2018 | 009261 | NCR region | Us 97 brays landing rd. intersection improvements | 1 of 3 | $214,584 | Low, 25% under the second |
| 11 APR 2018 | 009236 | NCR region | Us 97 n. of blewett pass culvert replacements | 3 of 6 | $1,298,788 | +19% |
| 07 FEB 2018 | 009196 | SCR region | I-182 queensgate dr - interchange improvements | 4 of 6 | $2,543,596 | +6.0% |
| 01 FEB 2017 | 009010 | NCR region | Sr 150 no-see-um road intersection improvements | 5 of 6 | $6,388,333 | +21% |
| 14 JAN 2015 | 008701 | NCR region | Us 97a entiat pedestrian improvements 15b005 | 2 of 6 | $273,724 | +14% |
| 07 MAR 2013 | 008424 | NCR region | Us 97 north of brewster passing lane | 3 of 5 | $1,093,701 | +12% |
| 10 JAN 2013 | 008409 | NCR region | Us 97 n of riverside nb passing lane | 4 of 7 | $874,649 | +5.0% |
| 06 DEC 2012 | 008385 | NCR region | Us 2 e. of coles corner box culvert | 5 of 9 | $844,445 | +31% |
| 06 JAN 2011 | 008058 | NCR region | Ncr major drainage 2011 | 2 of 9 | $530,280 | 0.0% |
| 25 MAR 2009 | 007702 | SCR region | I-182 rd. 100/broadmoor blvd. improvements | 6 of 6 | $1,309,656 | +32% |
| 12 FEB 2009 | 007668 | NCR region | Us 2 e. end odabashian bridge loop trail connection | 5 of 7 | $213,913 | +16% |
| 18 JAN 2007 | 007249 | NCR region | Sr 262 potholes reservoir shoulder widening for pedestrians | 1 of 5 | $222,602 | Low, 6.0% under the second |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.