Titan Earthwork LLC: WSDOT bid record
Titan Earthwork LLC submitted 20 bids on Washington State DOT contracts in the data, from 16 DEC 2009 to 26 AUG 2026, and was the low bidder on 2 of them (10%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $11,470,985
- Latest bid
- 26 AUG 2026
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2009 | 1 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 3 | 0 | 0% |
| 2012 | 2 | 1 | 50% |
| 2013 | 1 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2019 | 2 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2021 | 3 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 10 | 2 | 20% |
| OR region | 8 | 0 | 0% |
| SCR region | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Roadway excavation including haul | CY | 8 | 4 (50%) | $25.88 | $20.00 | |
| Crushed surfacing base course | TON | 12 | 3 (25%) | $42.50 | $26.44 | |
| Structure excavation class B including haul | CY | 7 | 3 (43%) | $16.00 | $15.00 | |
| Embankment compaction | CY | 6 | 3 (50%) | $5.50 | $3.50 | |
| Inlet protection | EACH | 9 | 2 (22%) | $85.00 | $95.00 | |
| High visibility fence | LF | 9 | 2 (22%) | $3.50 | $3.09 | |
| Street cleaning | HR | 7 | 1 (14%) | $125.00 | $115.00 | |
| No trespassing sign | EACH | 7 | 1 (14%) | $400.00 | $200.00 | |
| Flexible guide post | EACH | 6 | 1 (17%) | $87.50 | $33.23 | |
| Plastic stop line | LF | 6 | 1 (17%) | $19.75 | $10.00 | |
| Other traffic control labor | HR | 6 | 1 (17%) | $60.25 | $49.00 | |
| Shoring or extra excavation class B | SF | 6 | 1 (17%) | $2.55 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Scarsella Bros., Inc. | 5 | 5 of 5 |
| Northeast Electric, LLC | 5 | 5 of 5 |
| Granite Construction Company | 4 | 1 of 4 |
| Johansen Excavating, Inc. | 4 | 2 of 4 |
| Gary Merlino Construction Co., | 4 | 2 of 4 |
| 3 Kings Environmental, Inc. | 4 | 2 of 4 |
| Interwest Construction, Inc. | 3 | 3 of 3 |
| C.A. Carey Corporation | 3 | 1 of 3 |
| Midmountain Contractors, Inc. | 3 | 2 of 3 |
| Ceccanti, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 AUG 2026 | XE3764 | SCR region | Us 12 Locust Ln Vicinity Emergency Washout Repair | 6 of 7 | $543,933 | +65% |
| 19 JAN 2023 | 009911 | OR region | Sr 167 sr 167 completion demo 9 | 3 of 7 | $299,777 | +50% |
| 14 APR 2021 | 009673 | OR region | Sr 509 sr 167 completion demo 7 | 4 of 4 | $149,854 | +43% |
| 17 MAR 2021 | 009657 | NWR region | I-5 et al nw regionwide camera replacement | 4 of 4 | $2,568,053 | +63% |
| 24 FEB 2021 | 009644 | OR region | I-5 56th st nb on ramp meter congestion management | 4 of 4 | $664,007 | +78% |
| 05 FEB 2020 | 009501 | NWR region | Sr 522 i-5 to 61st ave ne paving & ada compliance | 1 of 5 | $11,140,445 | Low, 6.0% under the second |
| 05 FEB 2020 | 009515 | OR region | Sr 512 i-5 to sr 7 eb congestion management | 3 of 7 | $492,736 | +21% |
| 05 FEB 2020 | 009517 | OR region | Sr 509 sr 167 completion demo #5 | 4 of 4 | $280,288 | +87% |
| 18 DEC 2019 | 009504 | OR region | Sr16 snake lake and union ave vms replacement | 3 of 5 | $461,204 | +7.0% |
| 02 APR 2019 | 009420 | OR region | I-5 olympia area southbound congestion management | 2 of 2 | $1,175,284 | +27% |
| 20 APR 2016 | 008883 | NWR region | I-5 s 200th st / military rd intersection improvements 15a011 | 5 of 6 | $2,789,834 | +27% |
| 14 JAN 2015 | 008698 | NWR region | Sr 99 w fork hylebos creek fish passage 14a020 | 7 of 10 | $1,629,552 | +22% |
| 24 JAN 2013 | 008403 | NWR region | I-405 nb sr 167 ramp to nb i-405 major drainage repair | 6 of 9 | $564,417 | +15% |
| 11 JAN 2012 | 008236 | NWR region | Sr 99 yesler way to spring street nb alaskan way widening | 1 of 5 | $330,540 | Low, 5.0% under the second |
| 05 JAN 2012 | 008234 | OR region | Us 101 s of beacon point dr culvert replacement | 3 of 9 | $275,798 | +6.0% |
| 23 MAR 2011 | 008101 | NWR region | Sr 519 i-90 to sr 519 pedestrian trail | 3 of 6 | $1,144,042 | +3.0% |
| 24 FEB 2011 | 008087 | NWR region | Sr 410 white river bridge bridge scour | 3 of 6 | $263,173 | +21% |
| 12 JAN 2011 | 008060 | NWR region | Sr 530 skaglund hill slide permanent repair | 13 of 14 | $3,946,150 | +22% |
| 06 JAN 2010 | 007864 | SCR region | Sr 241 dry creek - construct box culvert | 13 of 20 | $414,261 | +38% |
| 16 DEC 2009 | 007856 | NWR region | Sr 203 corridor safety improvement king & snohomish counties | 5 of 6 | $3,631,871 | +22% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.