WisDOT contract 20250909006 bid tabulation

I-94 East West, West Leg; 70th Street to Zablocki Drive (IH 094, Milwaukee County I-94 East-West). Let by Wisconsin DOT on September 9, 2025, Milwaukee. 3 bids received.

Owner
Wisconsin DOT
Letting
09 SEP 2025
Pay items
776
Data through
10 NOV 2026

2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
2Hoffman Construction Company$131,755,605+9.0%
3Lunda Construction Company$152,007,935+26%
WisDOT contract 20250909006: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. Lunda Construction Company
1Clearing (201.0105)STA76$417.52$454.42
2Clearing (201.0120)ID558$30.65$33.36
3Grubbing (201.0205)STA76$158.55$172.56
4Grubbing (201.0220)ID558$5.29$5.76
5Removing structure (structure) 0081. B-40-81 (203.0220)EACH1$350,000$350,000
6Removing structure (structure) 0083. B-40-83 (203.0220)EACH1$350,000$350,000
7Removing structure (structure) 0085. B-40-85 (203.0220)EACH1$350,000$350,000
8Removing structure (structure) 0087. B-40-87 (203.0220)EACH1$350,000$350,000
9Removing structure (structure) 0110. N-40-81 (203.0220)EACH1$30,000$30,000
10Removing structure (structure) 0111. N-40-80 (203.0220)EACH1$50,000$50,000
11Removing structure (structure) 0801. R-40-0026 (203.0220)EACH1$400,000$17,357
12Removing structure (structure) 0802. R-40-0088 (203.0220)EACH1$400,000$34,714
13Removing structure (structure) 1034. B-40-87 (203.0220)EACH1$150,000$150,000
14Removing structure (structure) 1035. B-40-86 (203.0220)EACH1$350,000$350,000
15Removing structure (structure) 1036. B-40-85 (203.0220)EACH1$150,000$150,000
16Removing structure (structure) 1037. B-40-84 (203.0220)EACH1$350,000$350,000
17Removing structure (structure) 1038. B-40-83 (203.0220)EACH1$150,000$150,000
18Removing structure (structure) 1039. B-40-82 (203.0220)EACH1$350,000$350,000
19Removing structure (structure) 1040. B-40-81 (203.0220)EACH1$150,000$150,000
20Removing structure (structure) 1041. B-40-81 (203.0220)EACH1$350,000$350,000
21Debris containment (structure) 0087. B-40-87 (203.0330)EACH1$0.01$0.01
22Debris containment (structure) 1034. B-40-87 (203.0330)EACH1$0.01$0.01
23Debris containment (structure) 1035. B-40-86 (203.0330)EACH1$0.01$0.01
24Removing concrete pavement (204.0100)SY130,599$3.00$17.00
25Removing asphaltic surface butt joints (204.0115)SY300$42.00$42.00
26Removing asphaltic surface milling (204.0120)SY51,442$4.00$4.00
27Removing curb & gutter (204.0150)LF1,833$10.00$8.80
28Removing concrete sidewalk (204.0155)SY5,564$13.00$5.70
29Removing concrete barrier (204.0157)LF15,273$15.00$22.00
30Removing guardrail (204.0165)LF5,003$2.40$3.00
31Removing fence (204.0170)LF8,805$3.50$4.50
32Removing concrete bases (204.0195)EACH177$300.00$500.00
33Removing manholes (204.0210)EACH75$862.00$1,720.00
34Removing inlets (204.0220)EACH245$764.00$1,340.00
35Removing storm sewer (size) 0001. 12-inch (204.0245)LF9,609$15.00$46.50
36Removing storm sewer (size) 0002. 15-inch (204.0245)LF2,021$20.00$46.50
37Removing storm sewer (size) 0003. 18-inch (204.0245)LF1,244$20.00$46.50
38Removing storm sewer (size) 0004. 21-inch (204.0245)LF701$23.00$46.50
39Removing storm sewer (size) 0005. 24-inch (204.0245)LF314$26.00$47.00
40Removing storm sewer (size) 0006. 36-inch (204.0245)LF806$24.00$47.00
41Removing storm sewer (size) 0007. 54-inch (204.0245)LF23$68.00$464.00
42Removing ancillary structure (structure) 4001. S-40-002 (204.0246)EACH1$9,200.00$16,500
43Removing ancillary structure (structure) 4002. S-40-443 (204.0246)EACH1$9,200.00$16,500
44Removing ancillary structure (structure) 4003. S-40-151 (204.0246)EACH1$9,200.00$16,500
45Removing ancillary structure (structure) 4004. S-40-444 (204.0246)EACH1$9,200.00$16,500
46Removing ancillary structure (structure) 4005. S-40-994 (204.0246)EACH1$5,000.00$16,500
47Removing ancillary structure (structure) 4006. S-40-313 (204.0246)EACH1$17,200$16,500
48Abandoning manholes (204.0250)EACH1$1,724.00$6,630.00
49Sealing pipes (204.0280)EACH12$336.00$1,690.00
50Abandoning sewer (204.0291.S)CY71.82$262.00$509.00
51Removing advance flasher assemblies type 1 (204.9001.S)EACH6$277.99$277.99
52Removing (item description) 0001. steps railing (204.9060.S)EACH15$300.00$500.00
53Removing (item description) 0002. sand barrel arrays (204.9060.S)EACH1$2,000.00$15,000
54Removing (item description) 1001. distribution center (204.9060.S)EACH2$1,051.32$1,051.32
55Removing (item description) 1002. lighting units (204.9060.S)EACH118$638.03$638.03
56Removing (item description) 1003. poles wood 60-FT (204.9060.S)EACH10$761.31$761.31
57Removing (item description) 1004. poles wood 60-FT and floodlights (204.9060.S)EACH54$1,105.01$1,105.01
58Removing (item description) 1005. underdeck lighting (204.9060.S)EACH35$434.68$434.68
59Removing (item description) 3001. traffic signals W. O'connor ST & 70TH ST (204.9060.S)EACH1$3,002.31$3,002.31
60Removing (item description) 3002. traffic signals W kearney ST & S 70TH ST (204.9060.S)EACH1$3,002.31$3,002.31
61Removing (item description) 3003. traffic signals W O'connor ST & S 68TH ST (204.9060.S)EACH1$3,002.31$3,002.31
62Removing (item description) 3004. traffic signals W kearney ST & S 68TH ST (204.9060.S)EACH1$3,002.31$3,002.31
63Removing (item description) 3005. traffic signals IH 94 ramps & S hawley RD (204.9060.S)EACH1$3,002.31$3,002.31
64Excavation common (205.0100)CY193,570$35.00$35.50
65Excavation, hauling, and disposal of potential creosote contaminated soil 0001. onsite fill (205.0508.S)TON1,468$45.00$34.50
66Excavation, hauling, and disposal of potential creosote contaminated soil 0002. daily cover (205.0508.S)TON2,438$85.00$73.50
67Excavation, hauling, and disposal of potential creosote contaminated soil 0003. direct bury (205.0508.S)TON987$85.00$92.50
68Excavation for structures bridges (structure) 1034. B-40-1034 (206.1001)EACH1$10,000$5,200.00
69Excavation for structures bridges (structure) 1035. B-40-1035 (206.1001)EACH1$10,000$5,200.00
70Excavation for structures bridges (structure) 1040. B-40-1040 (206.1001)EACH1$10,000$20,000
71Excavation for structures bridges (structure) 1041. B-40-1041 (206.1001)EACH1$10,000$17,300
72Excavation for structures retaining walls (structure) 0735. R-40-735 (206.3001)EACH1$10,000$550,000
73Excavation for structures retaining walls (structure) 0738. R-40-738 (206.3001)EACH1$165,000$111,000
74Excavation for structures retaining walls (structure) 0743. R-40-743 (206.3001)EACH1$20,000$111,000
75Excavation for structures retaining walls (structure) 0801. R-40-801 (206.3001)EACH1$65,000$111,000
76Backfill controlled low strength (209.0200.S)CY500$250.00$275.00
77Backfill structure type A (210.1500)TON11,164$55.00$41.50
78Finishing roadway (project) 0001. 1060-27-71 (213.0100)EACH1$100.00$83,216
79Base aggregate dense 1 1/4-inch (305.0120)TON72,653$0.23$38.50
80Base aggregate open-graded (310.0110)TON2,229$50.36$57.00
81Select crushed material (312.0110)TON158,676$0.01$34.00
82Select crushed material (312.0115)CY305$0.01$90.00
83Removing pavement for base patching (390.0100)CY200$250.00$115.00
84Base patching concrete shes (390.0405)CY200$877.42$877.42
85Coloring concrete custom (405.0200)CY528$145.15$140.00
86Concrete pavement 7-inch (415.0070)SY535$90.94$90.94
87Concrete pavement approach slab (415.0410)SY2,408$202.06$202.06
88Concrete pavement joint filling (415.4100)SY27,506$2.55$2.55
89Drilled tie bars (416.0610)EACH736$10.76$10.76
90Drilled dowel bars (416.0620)EACH573$15.51$15.51
91Concrete pavement repair shes (416.1715)SY100$385.85$385.85
92Asphaltic mixture for extreme conditions (450.1100.S)TON125$55.00$55.00
93HMA cold weather paving (450.4000)TON13,780$1.65$1.65
94Tack coat (455.0605)GAL8,115$2.30$2.30
95Incentive density HMA pavement (460.2000)DOL2,750$1.00$1.00
96HMA pavement 3 HT 58-28 S (460.7223)TON2,927$110.00$110.00
97HMA pavement 4 HT 58-28 H (460.7424)TON6,002$126.95$126.95
98Asphaltic surface (465.0105)TON19$278.00$278.00
99Asphaltic surface driveways and field entrances (465.0120)TON29$180.00$180.00
100Asphaltic surface temporary (465.0125)TON13,780$99.50$99.50
101Cold patch (495.1000.S)TON100$2,000.00$350.00
102Ice hot weather concreting (501.1000.S)LB142,460$0.01$0.01
103Concrete masonry bridges (502.0100)CY1,839$900.00$1,200.00
104Concrete masonry soldier pile footings (502.0110.S)CY325$640.00$640.00
105Protective surface treatment (502.3200)SY11,897$5.00$5.00
106Pigmented surface sealer (502.3210)SY4,125$6.00$6.00
107Adhesive anchors no. 5 bar (502.4205)EACH64$22.00$22.00
108Prestressed girder type I 36W-inch (503.0137)LF7,398$360.00$360.00
109Concrete masonry retaining walls (504.0500)CY5,502$900.00$1,200.00
110Bar steel reinforcement HS structures (505.0400)LB105,710$1.50$1.50
111Bar steel reinforcement HS coated structures (505.0600)LB1,418,960$1.75$1.75
112Bar steel reinforcement HS stainless structures (505.0800.S)LB21,760$5.25$5.25
113Bar couplers no. 5 (505.0905)EACH42$60.00$60.00
114Bar couplers no. 8 (505.0908)EACH180$125.00$125.00
115Structural steel HS (506.0605)LB125,050$1.25$1.25
116Bearing pads elastomeric non- laminated (506.2605)EACH188$75.00$75.00
117Welded stud shear connectors 5/8X4-inch (506.3003)EACH2,974$12.00$12.00
118Welded stud shear connectors 7/8X6-inch (506.3015)EACH670$12.00$12.00
119Steel diaphragms (structure) 1034. B-40-1034 (506.4000)EACH24$1,000.00$1,000.00
120Steel diaphragms (structure) 1035. B-40-1035 (506.4000)EACH24$1,000.00$1,000.00
121Steel diaphragms (structure) 1036. B-40-1036 (506.4000)EACH20$1,000.00$1,000.00
122Steel diaphragms (structure) 1037. B-40-1037 (506.4000)EACH20$1,000.00$1,000.00
123Steel diaphragms (structure) 1038. B-40-1038 (506.4000)EACH8$1,000.00$1,000.00
124Steel diaphragms (structure) 1039. B-40-1039 (506.4000)EACH8$1,000.00$1,000.00
125Steel diaphragms (structure) 1040. B-40-1040 (506.4000)EACH12$1,000.00$1,000.00
126Steel diaphragms (structure) 1041. B-40-1041 (506.4000)EACH12$1,000.00$1,000.00
127Sawing pavement deck preparation areas (509.0310.S)LF314$2.00$2.00
128Cleaning decks (509.0500)SY557$22.50$25.00
129Temporary shoring (511.1100)SF11,213$25.00$25.00
130Temporary shoring (structure) 0735. R-40-735 (511.1200)SF1,530$20.00$20.00
131Temporary shoring (structure) 0741. R-40-741 (511.1200)SF816$150.00$150.00
132Temporary shoring (structure) 0742. R-40-742 (511.1200)SF530$250.00$250.00
133Temporary shoring (structure) 0743. R-40-743 (511.1200)SF250$75.00$75.00
134Temporary shoring (structure) 0762. R-40-762 (511.1200)SF933$75.00$75.00
135Temporary shoring (structure) 0801. R-40-801 (511.1200)SF575$30.00$30.00
136Temporary shoring (structure) 1035. B-40-1035 (511.1200)SF2,800$20.00$20.00
137Temporary shoring (structure) 1037. B-40-1037 (511.1200)SF1,100$35.00$35.00
138Temporary shoring (structure) 1039. B-40-1039 (511.1200)SF3,250$45.00$45.00
139Temporary shoring (location) 0500. 292+05 to 300+00 (511.1300)SF21,280$0.01$22.50
140Temporary shoring (location) 0501. 317+50 to 320+00 (511.1300)SF900$0.01$45.00
141Temporary shoring (location) 0502. 294+00 to 301+50 (511.1300)SF6,330$0.01$30.00
142Piling steel sheet permanent delivered (512.0500)SF19,020$76.25$76.25
143Railing pipe (513.2001)LF836$225.00$225.00
144Rubberized membrane waterproofing (516.0500)SY546$35.00$35.00
145Painting epoxy system (structure) 0738. R-40-738 (517.0601)EACH1$40,000$40,000
146Painting epoxy system (structure) 0801. R-40-801 (517.0601)EACH1$0.01$0.01
147Concrete staining (structure) 0734. R-40-734 (517.1010.S)SF11,415$2.46$1.80
148Concrete staining (structure) 0735. R-40-735 (517.1010.S)SF5,258$2.46$1.80
149Concrete staining (structure) 0736. R-40-736 (517.1010.S)SF21,280$2.46$1.80
150Concrete staining (structure) 0737. R-40-737 (517.1010.S)SF6,432$2.46$1.80
151Concrete staining (structure) 0739. R-40-739 (517.1010.S)SF10,862$2.46$1.80
152Concrete staining (structure) 0740. R-40-740 (517.1010.S)SF4,496$2.46$1.80
153Concrete staining (structure) 0744. R-40-744 (517.1010.S)SF2,557$2.46$1.80
154Concrete staining (structure) 1036. B-40-1036 (517.1010.S)SF149$2.46$1.80
155Concrete staining (structure) 1037. B-40-1037 (517.1010.S)SF284$2.46$1.80
156Concrete staining (structure) 1039. B-40-1039 (517.1010.S)SF282$2.46$1.80
157Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,860.00$1,370.00
158Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH1$3,873.00$3,030.00
159Concrete masonry ancillary structures type NS (531.1100)CY84.20$1,080.17$1,472.77
160Steel reinforcement HS ancillary structures type NS (531.1140)LB3,710$4.00$1.99
161Steel reinforcement HS coated ancillary structures type NS (531.1160)LB13,520$4.45$2.16
162Drilling shaft 24-inch (531.2024)LF60$75.00$150.00
163Drilling shaft 30-inch (531.2030)LF64$175.00$200.00
164Drilling shaft 36-inch (531.2036)LF302$210.00$234.44
165Drilling shaft 42-inch (531.2042)LF529$240.00$225.00
166Foundation camera pole 50-FT (531.4050)EACH2$4,131.55$4,131.55
167Foundation single-shaft type MC- IV (structure) 3115. S-40-3115 (531.5140)EACH1$13,700$10,310
168Foundation single-shaft type MF-II (structure) 3111. S-40-3111 (531.5220)EACH2$6,200.00$4,400.00
169Foundation single-shaft type MF-II (structure) 3114. S-40-3114 (531.5220)EACH2$6,200.00$4,400.00
170Foundation single-shaft type MF-II (structure) 3120. S-40-3120 (531.5220)EACH2$6,200.00$4,400.00
171Foundation single-shaft type TF-I (structure) 3112. S-40-3112 (531.5410)EACH2$5,750.00$4,100.00
172Foundation two-shaft type FC-I (structure) 3118. S-40-3118 (531.6010)EACH1$30,000$16,020
173Foundation two-shaft type FC-I (structure) 3176. S-40-3176 (531.6010)EACH1$30,000$16,020
174Foundation two-shaft type FC-II (structure) 3117. S-40-3117 (531.6020)EACH1$30,000$16,020
175Foundation two-shaft type FC-II (structure) 3121. S-40-3121 (531.6020)EACH1$16,475$16,020
176Foundation two-shaft type FF-II (structure) 0467. S-40-467 (531.6120)EACH1$33,150$26,397
177Foundation two-shaft type FF-III (structure) 0466. S-40-466 (531.6130)EACH2$43,000$34,182
178Foundation two-shaft type FF-III (structure) 0467. S-40-467 (531.6130)EACH1$43,000$34,182
179Foundation two-shaft type FF-III (structure) 3113. S-40-3113 (531.6130)EACH2$39,165$34,182
180Foundation two-shaft type FF-III (structure) 3116. S-40-3116 (531.6130)EACH2$43,000$34,182
181Foundation two-shaft type FF-III (structure) 3122. S-40-3122 (531.6130)EACH2$43,000$34,182
182Foundation two-shaft type FF-IV (structure) 0468. S-40-468 (531.6140)EACH2$45,785$36,572
183Butterfly 2-chord NS (structure) 3123. S-40-3123 (532.5020)EACH1$49,400$52,000
184Monotube cantilever type IV (structure) 3115. S-40-3115 (532.5140)EACH1$42,340$46,500
185Monotube full span type II (structure) 3111. S-40-3111 (532.5220)EACH1$39,410$43,000
186Monotube full span type II (structure) 3114. S-40-3114 (532.5220)EACH1$43,795$47,500
187Monotube full span type II (structure) 3120. S-40-3120 (532.5220)EACH1$43,730$47,500
188Truss full span 2-chord type I (structure) 3112. S-40-3112 (532.5410)EACH1$73,720$78,500
189Truss cantilever 4-chord type I (structure) 3118. S-40-3118 (532.6010)EACH1$40,420$44,500
190Truss cantilever 4-chord type I (structure) 3119. S-40-3119 (532.6010)EACH1$44,500$48,500
191Truss cantilever 4-chord type I (structure) 3176. S-40-3176 (532.6010)EACH1$44,820$49,000
192Truss cantilever 4-chord type II (structure) 3117. S-40-3117 (532.6020)EACH1$54,685$58,500
193Truss cantilever 4-chord type II (structure) 3121. S-40-3121 (532.6020)EACH1$57,580$62,000
194Truss full span 4-chord type NS (structure) 0466. S-40-466 (532.6100)EACH1$172,015$175,000
195Truss full span 4-chord type NS (structure) 3122. S-40-3122 (532.6100)EACH1$134,205$135,000
196Truss full span 4-chord type II (structure) 0467. S-40-467 (532.6120)EACH1$142,475$142,500
197Truss full span 4-chord type III (structure) 3113. S-40-3113 (532.6130)EACH1$120,550$119,000
198Truss full span 4-chord type III (structure) 3116. S-40-3116 (532.6130)EACH1$128,235$126,000
199Truss full span 4-chord type IV (structure) 0468. S-40-468 (532.6140)EACH1$173,755$174,000
200Noise barriers double-sided sound absorptive (structure) 0110. N-40- 110 (541.0300.S)SF10,210$70.00$70.00
201Noise barriers double-sided sound absorptive (structure) 0111. N-40- 111 (541.0300.S)SF10,930$70.00$70.00
202Noise barriers double-sided sound absorptive (structure) 0112. N-40- 112 (541.0300.S)SF7,130$70.00$70.00
203Noise barriers double-sided sound absorptive (structure) 0113. N-40- 113 (541.0300.S)SF3,970$70.00$70.00
204Noise barriers double-sided sound absorptive (structure) 0114. N-40- 114 (541.0300.S)SF2,930$70.00$70.00
205Noise barriers double-sided sound absorptive (structure) 0115. N-40- 115 (541.0300.S)SF7,120$70.00$70.00
206Noise barriers double-sided sound absorptive (structure) 0116. N-40- 116 (541.0300.S)SF22,270$70.00$70.00
207Noise barriers double-sided sound absorptive (structure) 0117. N-40- 117 (541.0300.S)SF26,730$70.00$70.00
208Noise barriers double-sided sound absorptive (structure) 0118. N-40- 118 (541.0300.S)SF27,970$70.00$70.00
209Pile points (550.0500)EACH333$200.00$200.00
210Piling steel HP 12-inch X 53 LB (550.1120)LF9,135$57.00$57.00
211Piling steel HP 14-inch X 73 LB (550.1140)LF3,750$74.00$74.00
212Piling cip concrete 12 3/4 X 0.50- inch (550.2128)LF14,846$75.00$75.00
213Concrete curb & gutter 19-inch (601.0319)LF251$80.05$25.00
214Concrete curb & gutter 22-inch (601.0322)LF119$119.30$25.00
215Concrete curb & gutter 31-inch (601.0331)LF14,444$31.20$23.50
216Concrete curb & gutter 30-inch type D (601.0411)LF644$29.57$25.00
217Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF3,310$29.91$30.00
218Concrete curb pedestrian (601.0600)LF435$122.69$45.00
219Concrete sidewalk 5-inch (602.0410)SF101,391$7.96$7.77
220Curb ramp detectable warning field natural patina (602.0515)SF827$52.26$45.00
221Curb ramp detectable warning field radial natural patina (602.0615)SF101$71.07$50.00
222Concrete driveway 7-inch (602.0815)SY319$85.15$60.00
223Concrete driveway hes 7-inch (602.0865)SY251$88.73$70.00
224Concrete steps (602.1500)SF115$81.82$100.00
225Concrete barrier type S42C (603.1442)LF1,076$157.47$260.00
226Concrete barrier type S56C (603.1456)LF1,254$180.81$270.00
227Concrete barrier transition type S32 to S36 (603.3513)EACH1$10,173$8,000.00
228Concrete barrier transition type S36 to S42 (603.3535)EACH1$10,278$8,000.00
229Concrete barrier transition type S42 to S56 (603.3559)EACH4$11,955$8,000.00
230Concrete barrier temporary precast delivered (603.8000)LF67,344$4.00$4.00
231Concrete barrier temporary precast installed (603.8125)LF103,652$4.00$4.00
232Anchoring concrete barrier temporary precast (603.8500)LF1,632$25.00$25.00
233Slope paving concrete (604.0400)SY477$80.00$80.00
234Riprap light (606.0100)CY154$240.00$299.00
235Riprap heavy (606.0300)CY26$220.00$279.00
236Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF1,602$123.00$264.00
237Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF1,011$99.00$226.00
238Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF6,896$150.00$219.00
239Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF4,881$168.00$262.00
240Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF529$232.00$329.00
241Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF678$260.00$437.00
242Storm sewer pipe reinforced concrete class III 42-inch (608.0342)LF475$310.00$487.00
243Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF460$371.00$305.00
244Storm sewer pipe reinforced concrete class III 54-inch (608.0354)LF790$539.00$688.00
245Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF39$194.00$619.00
246Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF791$104.00$298.00
247Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF1,774$136.00$373.00
248Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF804$154.00$273.00
249Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF92$375.00$352.00
250Storm sewer pipe reinforced concrete class IV 42-inch (608.0442)LF74$348.00$537.00
251Storm sewer pipe reinforced concrete class IV 54-inch (608.0454)LF104$581.00$797.00
252Storm sewer pipe reinforced concrete class V 18-inch (608.0518)LF44$181.00$806.00
253Storm sewer pipe reinforced concrete class V 24-inch (608.0524)LF89$307.00$1,080.00
254Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329)LF396$401.00$603.00
255Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (608.2434)LF379$450.00$491.00
256Reconstructing manholes (611.0420)EACH11$795.00$5,060.00
257Reconstructing inlets (611.0430)EACH31$905.00$936.00
258Manhole covers type J (611.0530)EACH11$876.00$796.00
259Manhole covers type J-special (611.0535)EACH28$966.00$817.00
260Manhole covers type Q- communications (611.0557)EACH2$2,000.00$7,500.00
261Inlet covers type BW (611.0610)EACH77$1,121.00$1,070.00
262Inlet covers type F (611.0615)EACH3$2,058.00$2,250.00
263Inlet covers type HM (611.0627)EACH4$1,263.00$1,230.00
264Inlet covers type MS (611.0642)EACH14$691.00$655.00
265Inlet covers type V-B (611.0655)EACH58$1,392.00$1,450.00
266Inlet covers type VV-B (611.0656)EACH54$2,121.00$2,320.00
267Inlet covers type W (611.0657)EACH25$1,983.00$1,920.00
268Inlet covers type Z (611.0666)EACH2$1,287.00$1,060.00
269Catch basins 3-FT diameter (611.1003)EACH9$2,881.00$2,040.00
270Catch basins 4-FT diameter (611.1004)EACH78$3,107.00$2,890.00
271Catch basins 5-FT diameter (611.1005)EACH5$4,142.00$4,870.00
272Manholes 4-FT diameter (611.2004)EACH51$3,258.00$3,800.00
273Manholes 5-FT diameter (611.2005)EACH99$3,936.00$6,140.00
274Manholes 6-FT diameter (611.2006)EACH25$5,940.00$7,490.00
275Manholes 7-FT diameter (611.2007)EACH8$13,560$12,700
276Manholes 8-FT diameter (611.2008)EACH4$15,354$18,900
277Manholes 9-FT diameter (611.2009)EACH2$28,872$39,800
278Manholes communication 4-FT diameter (611.2104)EACH2$15,795$15,795
279Inlets 3-FT diameter (611.3003)EACH4$1,890.00$1,780.00
280Inlets 4-FT diameter (611.3004)EACH119$2,220.00$2,420.00
281Inlets 2X2.5-FT (611.3225)EACH23$1,908.00$1,910.00
282Inlets 2.5X3-FT (611.3253)EACH3$2,162.00$2,470.00
283Inlets median 1 grate (611.3901)EACH10$2,601.00$3,930.00
284Inlets median 2 grate (611.3902)EACH2$6,016.00$4,860.00
285Adjusting manhole covers (611.8110)EACH6$667.00$1,020.00
286Adjusting inlet covers (611.8115)EACH45$765.00$719.00
287Cover plates temporary (611.8120.S)EACH77$374.00$479.00
288Pipe grates (size) 0001. 18-inch (611.9850.S)EACH1$858.00$1,810.00
289Pipe underdrain 6-inch (612.0106)LF60$35.00$82.00
290Pipe underdrain unperforated 6- inch (612.0206)LF608$25.00$18.00
291Pipe underdrain wrapped 6-inch (612.0406)LF7,375$5.00$3.90
292Crash cushions permanent low maintenance (614.0805)EACH3$36,555$36,555
293Crash cushions temporary (614.0905)EACH30$4,895.00$4,895.00
294MGS guardrail 3 (614.2300)LF2,591$32.95$30.00
295MGS thrie beam transition (614.2500)LF360$95.10$98.00
296MGS guardrail terminal eat (614.2610)EACH3$4,500.00$5,200.00
297MGS guardrail terminal type 2 (614.2620)EACH2$4,500.00$4,000.00
298Fence chain link 4-FT (616.0204)LF84$38.00$35.00
299Fence chain link 6-FT (616.0206)LF2,896$35.50$34.25
300Gates chain link (width) 0001. 12- FT (616.0329)EACH2$3,500.00$3,500.00
301Gates chain link (width) 0002. 30- FT (616.0329)EACH1$6,000.00$6,000.00
302Fence temporary (616.0600.S)LF535$43.50$43.50
303Fence safety (616.0700.S)LF15,000$4.25$3.50
304Mobilization (619.1000)EACH1$9,979,549$17,417,228
305Concrete median sloped nose (620.0300)SF523$14.90$18.00
306Dust control surface treatment (623.0200)SY188,200$0.01$0.01
307Water (624.0100)MGAL831$200.00$78.50
308Topsoil (625.0100)SY61,283$10.00$5.80
309Erosion bales (628.1104)EACH100$12.90$12.00
310Silt fence (628.1504)LF14,394$1.68$3.00
311Silt fence maintenance (628.1520)LF8,636$0.02$0.01
312Mobilizations erosion control (628.1905)EACH15$250.00$500.00
313Mobilizations emergency erosion control (628.1910)EACH8$100.00$250.00
314Erosion mat class I type B (628.2004)SY74,468$1.25$1.25
315Erosion mat urban class I type B (628.2008)SY3,414$1.89$2.25
316Soil stabilizer type B (628.6510)ACRE5$725.00$1,100.00
317Inlet protection type A (628.7005)EACH356$90.00$125.00
318Inlet protection type B (628.7010)EACH389$30.00$75.00
319Inlet protection type C (628.7015)EACH128$38.00$75.00
320Inlet protection type D (628.7020)EACH116$79.10$125.00
321Temporary ditch checks (628.7504)LF450$11.25$8.00
322Culvert pipe checks (628.7555)EACH17$42.50$20.00
323Tracking pads (628.7560)EACH3$5,000.00$3,130.00
324Rock bags (628.7570)EACH100$8.90$20.00
325Fertilizer type B (629.0210)CWT47$79.50$125.00
326Seeding mixture no. 20 (630.0120)LB2,154$9.40$9.00
327Seeding mixture no. 30 (630.0130)LB113$9.50$9.00
328Seeding mixture no. 75 (630.0175)LB42$38.00$200.00
329Seeding temporary (630.0200)LB305$4.75$5.00
330Seeding nurse crop (630.0400)LB47$15.00$20.00
331Seed water (630.0500)MGAL1,489$20.00$10.00
332Sod water (631.0300)MGAL264$55.00$10.00
333Sod lawn (631.1000)SY9,761$11.50$10.00
334Delineators barrier wall (633.1000)EACH92$38.90$100.00
335Posts wood 4X6-inch X 18-FT (634.0618)EACH60$85.00$160.00
336Posts wood 4X6-inch X 22-FT (634.0622)EACH39$88.10$225.00
337Posts tubular steel 2X2-inch X 8-FT (634.0808)EACH4$110.00$300.00
338Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH35$135.00$310.00
339Posts tubular steel 2X2-inch X 8.5- FT (634.0885)EACH4$99.50$700.00
340Sign supports structural steel HS (635.0200)LB4,552$4.50$6.00
341Signs type I reflective SH (637.1220)SF2,934$28.00$30.00
342Signs type I reflective F (637.1230)SF376.88$28.00$30.00
343Signs type II reflective H (637.2210)SF2,366.32$19.50$24.00
344Signs type II reflective H folding (637.2215)SF135.94$26.90$40.00
345Signs type II reflective F (637.2230)SF631.50$20.00$26.00
346Moving signs type I (638.2101)EACH3$800.00$2,500.00
347Moving signs type II (638.2102)EACH21$100.00$150.00
348Removing signs type I (638.2601)EACH21$500.00$500.00
349Removing signs type II (638.2602)EACH288$18.75$50.00
350Removing small sign supports (638.3000)EACH181$18.50$50.00
351Removing structural steel sign supports (638.3100)EACH24$400.00$750.00
352Traffic control drums (643.0300)DAY713,195$0.13$0.13
353Digital speed reduction system (DSRS) (643.0370.S)DAY2,000$10.00$10.00
354Traffic control barricades type III (643.0420)DAY50,890$0.44$0.44
355Traffic control warning lights type A (643.0705)DAY98,440$0.10$0.10
356Traffic control warning lights type C (643.0715)DAY158,035$0.12$0.12
357Connected arrow board (643.0810.S)DAY2,390$7.25$7.25
358Traffic control signs (643.0900)DAY1,241,070$0.10$0.10
359Traffic control covering signs type I (643.0910)EACH36$315.00$315.00
360Traffic control covering signs type II (643.0920)EACH14$120.00$120.00
361Traffic control signs fixed message (643.1000)SF2,625$22.25$22.25
362Traffic control signs PCMS (643.1050)DAY2,350$12.45$12.45
363Traffic control signs PCMS with TMC communications (643.1051)DAY2,320$16.25$16.25
364Truck or trailer mounted attenuator (643.1055.S)DAY100$500.00$500.00
365Connected work zone start and end location markers (643.1220.S)DAY4,940$2.45$2.45
366Temporary marking line epoxy 6- inch (643.3170)LF506,058$0.40$0.40
367Temporary marking line black epoxy 6-inch (643.3175)LF44,858$0.33$0.33
368Temporary marking line epoxy 10- inch (643.3270)LF3,857$1.39$1.39
369Temporary marking raised pavement marker type I (643.3760)EACH1,101$6.30$6.30
370Traffic control interim lane closure (643.4100)EACH500$625.00$625.00
371Traffic control (643.5000)EACH1$983,225$983,225
372Temporary pedestrian surface asphalt (644.1410)SF1,000$9.50$9.50
373Temporary pedestrian surface plate (644.1430)SF100$25.00$25.00
374Temporary pedestrian curb ramp (644.1601)DAY200$25.00$25.00
375Temporary pedestrian barricade (644.1810)LF500$6.50$6.50
376Temporary audible message devices (644.1900.S)DAY8,400$2.25$2.25
377Geotextile type DF schedule B (645.0112)SY1,009$3.00$5.00
378Geotextile type sas (645.0140)SY1,154$3.00$5.00
379Geogrid type SR (645.0220)SY14,281$3.00$5.00
380Marking line epoxy 4-inch (646.1020)LF16,055$0.35$0.35
381Marking line epoxy 6-inch (646.2020)LF8,906$0.50$0.50
382Marking line grooved black epoxy 6-inch (646.2025)LF18,316$0.85$0.85
383Marking line grooved wet ref epoxy 6-inch (646.2040)LF83,273$1.35$1.35
384Marking line epoxy 8-inch (646.3020)LF2,543$0.90$0.90
385Marking line epoxy 10-inch (646.4020)LF3,940$1.05$1.05
386Marking line grooved black epoxy 10-inch (646.4025)LF2,905$1.85$1.85
387Marking line grooved wet ref epoxy 10-inch (646.4040)LF19,715$2.75$2.75
388Marking arrow epoxy (646.5020)EACH117$360.65$360.65
389Marking word epoxy (646.5120)EACH15$365.15$365.15
390Marking symbol epoxy (646.5220)EACH58$349.70$349.70
391Marking stop line epoxy 18-inch (646.6120)LF349$15.15$15.15
392Marking yield line epoxy 18-inch (646.6220)EACH20$36.15$36.15
393Marking diagonal epoxy 12-inch (646.7120)LF6,356$14.75$14.75
394Marking chevron epoxy 24-inch (646.7220)LF1,863$24.85$24.85
395Marking chevron epoxy 12-inch (646.7320)LF170$24.05$24.05
396Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,000$14.35$14.35
397Marking curb epoxy (646.8120)LF168$7.25$7.25
398Marking island nose epoxy (646.8220)EACH5$272.75$272.75
399Marking removal line 4-inch (646.9000)LF64,930$0.18$0.18
400Marking removal line grooved permanent tape 4-inch (646.9050)LF17,293$1.75$1.75
401Conduit rigid metallic 2-inch (652.0125)LF377$44.45$44.45
402Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF33,307$7.76$7.76
403Conduit rigid nonmetallic schedule 40 2 1/2-inch (652.0230)LF742$10.58$10.58
404Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF9,229$9.23$9.23
405Conduit special 2-inch (652.0605)LF170$35.02$35.02
406Conduit special 3-inch (652.0615)LF1,540$39.77$39.77
407Install conduit into existing item (652.0700.S)EACH8$375.60$375.60
408Conduit loop detector (652.0800)LF5,840$8.94$8.94
409Pull boxes steel 24X36-inch (653.0135)EACH24$1,265.14$1,265.14
410Pull boxes steel 24X42-inch (653.0140)EACH138$1,280.33$1,280.33
411Removing pull boxes (653.0905)EACH72$152.70$152.70
412Concrete bases type 1 (654.0101)EACH24$975.10$975.10
413Concrete bases type 2 (654.0102)EACH9$1,219.15$1,219.15
414Concrete bases type 5 (654.0105)EACH67$1,085.41$1,085.41
415Concrete bases type 6 (654.0106)EACH1$1,386.29$1,386.29
416Concrete bases type 7 (654.0107)EACH2$1,483.18$1,483.18
417Concrete bases type 8 (654.0108)EACH3$2,366.77$2,366.77
418Concrete bases type 10 (654.0110)EACH11$6,142.21$6,142.21
419Concrete bases type 10-special (654.0120)EACH5$7,804.67$7,804.67
420Concrete control cabinet bases type 9 special (654.0217)EACH6$2,461.40$2,461.40
421Concrete control cabinet bases type L30 (654.0230)EACH1$2,134.45$2,134.45
422Concrete control cabinet bases ITS (654.1239)EACH1$3,012.01$3,012.01
423Cable traffic signal 5-14 AWG (655.0230)LF3,716$1.64$1.64
424Cable traffic signal 7-14 AWG (655.0240)LF3,290$2.08$2.08
425Cable traffic signal 9-14 AWG (655.0250)LF385$2.85$2.85
426Cable traffic signal 12-14 AWG (655.0260)LF5,217$2.85$2.85
427Cable traffic signal 15-14 AWG (655.0270)LF1,004$3.92$3.92
428Cable type UF 2-10 AWG grounded (655.0320)LF3,195$1.84$1.84
429Electrical wire traffic signals 12 AWG (655.0510)LF995$1.73$1.73
430Electrical wire traffic signals 10 AWG (655.0515)LF19,333$1.76$1.76
431Electrical wire lighting 12 AWG (655.0610)LF16,569$0.87$0.87
432Electrical wire lighting 10 AWG (655.0615)LF1,322$0.99$0.99
433Electrical wire lighting 6 AWG (655.0625)LF46,300$1.57$1.57
434Electrical wire lighting 4 AWG (655.0630)LF10,435$2.40$2.40
435Electrical wire lighting 2 AWG (655.0635)LF2,620$3.78$3.78
436Electrical wire lighting 1 AWG (655.0640)LF18$6.21$6.21
437Loop detector lead in cable (655.0700)LF20,661$1.33$1.33
438Loop detector wire (655.0800)LF20,844$1.09$1.09
439Traffic signal evp detector cable (655.0900)LF3,788$1.34$1.34
440Electrical service meter breaker pedestal (location) 2001. (MBDMS4000190) (656.0201)EACH1$1,588.09$1,588.09
441Electrical service meter breaker pedestal (location) 2002. (MBDMS400132) (656.0201)EACH1$1,588.09$1,588.09
442Electrical service meter breaker pedestal (location) 2003. (MBDMS400042) (656.0201)EACH1$1,588.09$1,588.09
443Electrical service meter breaker pedestal (location) 3001. W O'connor ST & S 70TH ST (656.0201)EACH1$1,295.95$1,295.95
444Electrical service meter breaker pedestal (location) 3002. W kearney ST & S 70TH ST (656.0201)EACH1$1,295.95$1,295.95
445Electrical service meter breaker pedestal (location) 3003. W O'connor SR & S 68TH ST (656.0201)EACH1$1,295.95$1,295.95
446Electrical service meter breaker pedestal (location) 3004. W kearney ST & S 68TH ST (656.0201)EACH1$1,295.95$1,295.95
447Electrical service meter breaker pedestal (location) 3005. IH 94 WB on ramp & N hawley RD (656.0201)EACH1$1,295.95$1,295.95
448Electrical service meter breaker pedestal (location) 3006. IH 94 EB off ramp & S hawley RD (656.0201)EACH1$1,295.95$1,295.95
449Electrical service main lugs only meter pedestal (location) 1001. HL- 40-HY (656.0401)EACH1$1,126.73$1,126.73
450Electrical service breaker disconnect box (location) 2001. (DMS400019) (656.0501)EACH1$1,130.16$1,130.16
451Electrical service breaker disconnect box (location) 2002. (DMS400132) (656.0501)EACH1$1,130.16$1,130.16
452Electrical service breaker disconnect box (location) 2003. (RM40007) (656.0501)EACH1$1,130.16$1,130.16
453Electrical service breaker disconnect box (location) 2004. (DMS400042) (656.0501)EACH1$1,130.16$1,130.16
454Electrical service breaker disconnect box (location) 2005. (CCTV400010) (656.0501)EACH1$1,130.16$1,130.16
455Pedestal bases (657.0100)EACH22$376.35$376.35
456Transformer bases breakaway 15- 17 inch bolt circle (657.0210)EACH32$843.98$843.98
457Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH80$688.57$688.57
458Poles type 3 (657.0310)EACH9$3,775.82$3,775.82
459Poles type 5-aluminum (657.0322)EACH15$2,068.53$2,068.53
460Poles type 6-aluminum (657.0327)EACH1$2,406.25$2,406.25
461Poles type A (657.0375)EACH25$4,233.78$4,233.78
462Poles type E (657.0380)EACH3$5,109.66$5,109.60
463Poles type F (657.0381)EACH5$8,852.68$8,852.68
464Traffic signal standards aluminum 3.5-FT (657.0405)EACH1$455.26$455.26
465Traffic signal standards aluminum 13-FT (657.0420)EACH11$880.07$880.07
466Traffic signal standards aluminum 15-FT (657.0425)EACH6$922.15$922.15
467Traffic signal standards aluminum 10-FT (657.0430)EACH4$822.82$822.82
468Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH9$347.68$347.68
469Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH68$340.68$340.68
470Luminaire arms single member 6- inch clamp 4-FT (657.0620)EACH50$332.50$332.50
471Luminaire arms single member 6- inch clamp 6-FT (657.0625)EACH3$347.68$347.68
472Traffic signal face 1S 12-inch (658.0171)EACH2$519.53$519.53
473Traffic signal face 3S 12-inch (658.0173)EACH51$889.29$889.29
474Traffic signal face 4S 12-inch (658.0174)EACH12$1,265.70$1,265.70
475Traffic signal face 5S 12-inch (658.0175)EACH6$1,230.37$1,230.37
476Pedestrian signal face 16-inch (658.0416)EACH28$551.64$551.64
477Pedestrian push buttons (658.0500)EACH4$341.29$341.29
478Signal mounting hardware (location) 3001. W O'connor ST & S 70TH ST (658.5070)EACH1$3,283.84$3,283.84
479Signal mounting hardware (location) 3002.W kearney ST & S 70TH ST (658.5070)EACH1$3,022.08$3,022.08
480Signal mounting hardware (location) 3003. W O'connor ST & S 68TH ST (658.5070)EACH1$3,151.79$3,151.79
481Signal mounting hardware (location) 3004. W kearney ST & S 68TH ST (658.5070)EACH1$3,591.17$3,591.17
482Signal mounting hardware (location) 3005. IH 94 WB on ramp & N hawley RD (658.5070)EACH1$1,971.53$1,971.53
483Signal mounting hardware (location) 3006. IH 94 EB off ramp & S hawley RD (658.5070)EACH1$2,495.05$2,495.05
484Signal mounting hardware (location) 3007. wisconsin and hawley RD (658.5070)EACH1$738.68$738.68
485Signal mounting hardware (location) 3008. W bluemound and hawley RD (658.5070)EACH1$869.56$869.56
486Underdeck lighting (structure) 1001. underdeck lighting (B-40- 1034) (659.0601)EACH1$2,287.02$2,287.02
487Underdeck lighting (structure) 1002. underdeck lighting (B-40- 1035) (659.0601)EACH1$2,287.02$2,287.02
488Underdeck lighting (structure) 1003. underdeck lighting (B-40- 1036) (659.0601)EACH1$2,287.02$2,287.02
489Underdeck lighting (structure) 1004. underdeck lighting (B-40- 1037) (659.0601)EACH1$2,287.02$2,287.02
490Underdeck lighting (structure) 1005. underdeck lighting (B-40- 1038) (659.0601)EACH1$1,143.51$1,143.51
491Underdeck lighting (structure) 1006. underdeck lighting (B-40- 1039) (659.0601)EACH1$1,143.51$1,143.51
492Underdeck lighting (structure) 1007. underdeck lighting (B-40- 1040) (659.0601)EACH1$3,430.52$3,430.52
493Underdeck lighting (structure) 1008. underdeck lighting (B-40- 1041) (659.0601)EACH1$3,430.52$3,430.52
494Luminaires utility LED C (659.1125)EACH44$616.12$616.12
495Luminaires utility LED D (659.1130)EACH63$664.03$664.03
496Luminaires underdeck LED C (659.1215)EACH32$601.89$601.89
497Lighting control cabinets 240/480 30-inch (659.2230)EACH1$10,637$10,637
498Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH84$22.34$22.34
499Temporary traffic signals for intersections (location) 3001. W. kearney ST. & S. 70TH ST. (661.0201)EACH1$53,541$53,541
500Ramp closure gates 24-FT (662.1024.S)EACH1$28,635$28,635
501Ramp closure gates 30-FT (662.1030.S)EACH2$29,161$29,161
502Ramp closure gates 37-FT (662.1037.S)EACH1$31,089$31,089
503Field system integrator (670.0101)EACH1$62,474$62,474
504ITS documentation (670.0201)EACH1$12,313$12,313
505Conduit HDPE 4-duct 2-inch (671.0142)LF3,155$22.86$22.86
506Conduit HDPE directional bore 2- duct 2-inch (671.0222)LF215$22.74$22.74
507Conduit HDPE directional bore 4- duct 2-inch (671.0242)LF1,585$29.73$29.73
508Communication vault type 1 (673.0105)EACH8$2,799.48$2,799.48
509Tracer wire marker posts (673.0200)EACH5$262.18$262.18
510Install ITS field cabinet (673.1200.S)EACH1$3,591.46$3,591.46
511Install pole mounted cabinet (673.1225.S)EACH1$2,897.18$2,897.18
512Remove cable (674.0300)LF10,390$1.22$1.22
513Install controller ramp meter processor assembly (675.0100)EACH1$1,953.53$1,953.53
514Install mounted controller microwave detector assembly (675.0300)EACH4$2,479.59$2,479.59
515Install camera pole 50-FT (677.0150)EACH2$3,186.80$3,186.80
516Install camera assembly (677.0200)EACH2$2,789.02$2,789.02
517Removing 50-FT camera pole (677.9051.S)EACH2$2,097.58$2,097.58
518Removing CCTV camera (677.9200.S)EACH2$1,423.93$1,423.93
519Install fiber optic cable outdoor plant 6-CT (678.0006)LF5,175$1.86$1.86
520Install fiber optic cable outdoor plant 24-CT (678.0024)LF763$1.86$1.86
521Install fiber optic cable outdoor plant 72-CT (678.0072)LF6,864$1.86$1.86
522Install overhead freeway DMS full matrix (678.0100.S)EACH3$21,609$21,609
523Fiber optic splice (678.0300)EACH172$67.02$67.02
524Fiber optic termination (678.0400)EACH54$113.42$113.42
525Communication system testing (678.0501)EACH1$12,442$12,442
526Install ethernet switches (678.0600)EACH11$1,223.57$1,223.57
527Install cellular modems (678.0800)EACH3$1,223.57$1,223.57
528Sawing asphalt (690.0150)LF1,081$1.39$1.75
529Sawing concrete (690.0250)LF29,492$2.25$2.75
530Incentive strength concrete structures (715.0502)DOL61,494$1.00$1.00
531Incentive flexural strength concrete pavement (715.0715)DOL36,623$1.00$1.00
532Incentive iri ride (740.0440)DOL16,600$1.00$1.00
533On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS36,000$5.00$5.00
534On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS72,000$5.00$5.00
535Special 0001. roadway embankment (SPV.0035)CY42,676$10.00$21.00
536Special 4000. HPC masonry structures (SPV.0035)CY3,847$900.00$1,200.00
537Special 0504. truck entering warning system (SPV.0045)DAY2,000$10.85$10.85
538Special 0505. flashing beacon sign (SWZ) (SPV.0045)DAY18,170$9.55$9.55
539Special 0506. PCMS with cellular communications (SWZ) (SPV.0045)DAY30,309$10.15$10.15
540Special 0507. portable traffic sensor (SWZ) (SPV.0045)DAY25,899$3.50$3.50
541Special 0001. baseline CPM project schedule (SPV.0060)EACH1$100.00$1,000.00
542Special 0002. monthly CPM project schedule updates (SPV.0060)EACH37$100.00$100.00
543Special 0101. concrete barrier transition type G1 (SPV.0060)EACH1$21,853$17,000
544Special 0102. concrete barrier transition type G2 (SPV.0060)EACH1$11,739$19,000
545Special 0106. concrete barrier transition type S42 to S56 special (SPV.0060)EACH32$9,351.93$16,000
546Special 0107. concrete barrier transition type S32C reverse footing to S56C reverse foot (SPV.0060)EACH1$12,452$16,000
547Special 0110. concrete barrier transition type M1 (SPV.0060)EACH1$21,718$22,000
548Special 0111. concrete barrier transition type M2 (SPV.0060)EACH1$23,765$23,000
549Special 0112. concrete barrier type S42 end anchor (SPV.0060)EACH4$7,540.91$230.00
550Special 0113. concrete barrier type S56 end anchor (SPV.0060)EACH5$7,325.36$260.00
551Special 0114. concrete barrier type S42 special end anchor (SPV.0060)EACH12$7,622.29$225.00
552Special 0115. concrete barrier type S56 special end anchor (SPV.0060)EACH10$7,726.20$240.00
553Special 0116. concrete barrier type S56 special 34-inch end anchor (SPV.0060)EACH8$11,156$10,000
554Special 0117. concrete barrier type S32 special end anchor (SPV.0060)EACH1$6,948.22$10,000
555Special 0123. salvage ramp gate (SPV.0060)EACH2$1,483.77$1,483.77
556Special 0124. salvage wrong way driver detection equipment (SPV.0060)EACH5$1,381.27$1,381.27
557Special 0125. section corner monuments special (SPV.0060)EACH2$1,500.00$1,000.00
558Special 0126. survey project 1060- 27-71 (SPV.0060)EACH1$950,000$950,000
559Special 0140. drilled high performance dowel bars (SPV.0060)EACH140$20.16$20.16
560Special 0151. round aluminum sign post system in soft surface 10-foot (SPV.0060)EACH33$210.00$315.00
561Special 0152. round aluminum sign post system in soft surface 11-foot (SPV.0060)EACH4$220.00$320.00
562Special 0153. round aluminum sign post system in soft surface 12-foot (SPV.0060)EACH1$390.00$325.00
563Special 0159. round aluminum sign post in concrete surface 10- foot (SPV.0060)EACH14$220.00$300.00
564Special 0170. exposing existing infrastructure paved area (SPV.0060)EACH15$1,916.00$1,421.48
565Special 0171. exposing existing infrastructure unpaved area (SPV.0060)EACH15$1,916.00$1,350.00
566Special 0177. fire hydrant sign mounting (SPV.0060)EACH62$200.00$225.00
567Special 0180. tree trimming (SPV.0060)EACH5$2,000.00$1,725.62
568Special 0554. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH20$2,845.00$3,472.92
569Special 0555. emergency response to traffic involving crash cushion temporary (SPV.0060)EACH20$345.00$345.00
570Special 0556. emergency response to pavement repair (SPV.0060)EACH20$4,400.00$2,400.00
571Special 0557. fixed message sign portable support (SPV.0060)EACH39$750.00$750.00
572Special 0564. traffic control close- open freeway to freeway system ramp (SPV.0060)EACH500$340.00$340.00
573Special 0565. traffic control close - open freeway entrance ramp (SPV.0060)EACH1,000$225.00$225.00
574Special 0566. traffic control full freeway closure (SPV.0060)EACH400$1,455.00$1,455.00
575Special 0571. traffic control local road lane closure (SPV.0060)EACH300$225.00$225.00
576Special 0572. thrie beam connection to concrete barrier temporary precast (SPV.0060)EACH5$1,500.00$1,800.00
577Special 0573. moving FBS (SWZ) (SPV.0060)EACH160$85.00$85.00
578Special 0574. moving PCMS (SWZ) (SPV.0060)EACH278$85.00$85.00
579Special 0575. moving PTS (SWZ) (SPV.0060)EACH232$85.00$85.00
580Special 0576. mobilizations emergency traffic control (SPV.0060)EACH60$345.00$3,179.80
581Special 0600. emergency response to incident involving utility (SPV.0060)EACH3$845.00$6,345.00
582Special 0955. install state furnished sign (SPV.0060)EACH4$250.00$500.00
583Special 1001. poles wood 60-FT (SPV.0060)EACH12$2,441.92$2,441.92
584Special 1002. wood pole lighting 60-FT (SPV.0060)EACH54$3,755.84$3,755.84
585Special 1003. concrete bases type B (SPV.0060)EACH25$2,673.85$2,673.85
586Special 1004. luminaires utility floodlight (SPV.0060)EACH54$2,191.91$2,191.91
587Special 1005. poles type 30-AL-BD (SPV.0060)EACH24$1,946.21$1,946.21
588Special 1006. poles type 25-AL-BD (SPV.0060)EACH19$1,676.82$1,676.82
589Special 1013. inline 5A fast acting fuse with holder (SPV.0060)EACH24$159.82$159.82
590Special 1017. luminaire utility 2LED (SPV.0060)EACH40$711.18$711.18
591Special 1018. luminaire utility 3LED (SPV.0060)EACH9$711.18$711.18
592Special 1020. pull boxes 17X30X24- inch (SPV.0060)EACH86$1,181.39$1,181.39
593Special 1025. lighting units relocated (SPV.0060)EACH4$2,204.33$2,204.33
594Special 1026. luminaire arms single member 4-inch clamp 4-FT (SPV.0060)EACH10$261.21$261.21
595Special 1027. poles type 5- aluminum 20-FT (SPV.0060)EACH3$2,303.80$2,303.80
596Special 1028. hydro excavation (SPV.0060)EACH16$654.85$654.85
597Special 1031. maintenance of lighting systems (SPV.0060)EACH1$42,962$42,962
598Special 1041. lighting system integrator 1060-27-71 (SPV.0060)EACH1$13,748$13,748
599Special 1051. lighting system survey 1060-27-71 (SPV.0060)EACH1$20,000$20,000
600Special 2000. removing electrical service meter breaker pedestal (SPV.0060)EACH3$238.02$238.02
601Special 2001. removing controller cabinet (SPV.0060)EACH5$712.67$712.67
602Special 2002. removing controller cabinet base (SPV.0060)EACH5$1,119.85$1,119.85
603Special 2003. removing microwave detector (SPV.0060)EACH8$898.27$898.27
604Special 2004. removing ramp control signal assembly sidemount (SPV.0060)EACH5$540.82$540.82
605Special 2005. removing ramp control signal assembly overhead (SPV.0060)EACH2$454.90$454.90
606Special 2006. removing overhead freeway DMS (SPV.0060)EACH2$6,468.83$6,468.83
607Special 2007. removing pole (SPV.0060)EACH4$1,278.93$1,278.93
608Special 2008. salvaging pole mounted cabinet (SPV.0060)EACH2$1,056.53$1,056.53
609Special 2009. temporary vehicle detector assembly (SPV.0060)EACH1$5,443.79$5,443.79
610Special 2010. relocating temporary vehicle detector assembly (SPV.0060)EACH5$3,491.58$3,491.58
611Special 2011. removing temporary vehicle detector assembly (SPV.0060)EACH1$2,783.56$2,783.56
612Special 2012. temporary traffic camera assembly (SPV.0060)EACH2$4,031.19$4,031.19
613Special 2013. relocating temporary traffic camera assembly (SPV.0060)EACH10$4,031.19$4,031.19
614Special 2014. removing temporary traffic camera assembly (SPV.0060)EACH2$2,783.56$2,783.56
615Special 2050. enter existing splice enclosure (SPV.0060)EACH1$1,570.71$1,570.71
616Special 2051. loop detector protection (SPV.0060)EACH6$144.35$144.35
617Special 2052. refocus vehicle detector assembly (SPV.0060)EACH63$2,101.62$2,101.62
618Special 2053. signal assembly advance flasher type 1 (SPV.0060)EACH5$2,880.14$2,880.14
619Special 2054. signal assembly ramp control overhead (SPV.0060)EACH3$2,616.18$2,616.18
620Special 2055. ground rod (SPV.0060)EACH4$132.67$132.67
621Special 2056. install structure mounted cabinet (SPV.0060)EACH3$1,555.14$1,555.14
622Special 3002. install poles type 10 (SPV.0060)EACH11$1,454.56$1,454.56
623Special 3003. install poles type 9- special (SPV.0060)EACH3$1,626.41$1,626.41
624Special 3004. install poles type 10- special (SPV.0060)EACH2$1,626.41$1,626.41
625Special 3007. install monotube arms 15-FT (SPV.0060)EACH1$1,488.44$1,488.44
626Special 3008. install monotube arms 20-FT (SPV.0060)EACH1$1,488.44$1,488.44
627Special 3009. install monotube arms 25-FT (SPV.0060)EACH4$1,488.44$1,488.44
628Special 3010. install monotube arms 30-FT (SPV.0060)EACH5$1,488.44$1,488.44
629Special 3011. install monotube arms 35-FT-special (SPV.0060)EACH2$2,003.99$2,003.99
630Special 3013. install monotube arms 45-FT-special (SPV.0060)EACH3$2,003.99$2,003.99
631Special 3017. install luminaire arms steel 15-FT (SPV.0060)EACH17$372.91$372.91
632Special 3029. TRNSPT traffic signal & inter lighting materials W O'connor ST & S 70TH ST (SPV.0060)EACH1$515.55$515.55
633Special 3030. TRNSPT traffic signal & inter lighting materials W kearney ST & S 70TH ST (SPV.0060)EACH1$515.55$515.55
634Special 3031. TRNSPT traffic signal & inter lighting materials O'connor ST & S 68TH ST (SPV.0060)EACH1$515.55$515.55
635Special 3032. TRNSPT traffic signal & inter lighting materials W kearney ST & S 68TH ST (SPV.0060)EACH1$515.55$515.55
636Special 3033. TRNSPT signal & inter lighting materials IH 94 WB on ramp & N hawley RD (SPV.0060)EACH1$515.55$515.55
637Special 3034. TRNSPT signal & inter lighting materials IH 94 EB off ramp & S hawley RD. (SPV.0060)EACH1$515.55$515.55
638Special 3043. backplates with reflective border 3 section 12-inch (SPV.0060)EACH12$148.13$148.13
639Special 3046. TRNSPT & install state furn traffic signal cabinet W O'connor ST & S 70TH (SPV.0060)EACH1$6,396.23$6,396.23
640Special 3047. TRNSPT & install state furn traffic signal cabinet W kearney ST & S 70TH (SPV.0060)EACH1$6,416.11$6,416.11
641Special 3048. TRNSPT & install state furn traffic signal cabinet W O'connor ST & S 68TH (SPV.0060)EACH1$6,975.69$6,975.69
642Special 3049. TRNSPT & install state furn traffic signal cabinet W kearney ST & S 68TH (SPV.0060)EACH1$6,783.96$6,783.96
643Special 3050. TRNSPT & install state furn traffic signal cabinet IH 94 WB on ramp & N HA (SPV.0060)EACH1$5,144.98$5,144.98
644Special 3051. TRNSPT & install state furn traffic signal cabinet IH 94 EB off ramp & S H (SPV.0060)EACH1$6,200.22$6,200.22
645Special 3052. TRNSPT & install state furn APS push button system W O'connor ST & S 70TH (SPV.0060)EACH1$2,997.06$2,997.06
646Special 3053. TRNSPT & install state furn APS push button system W kearney ST & S 70TH (SPV.0060)EACH1$2,997.06$2,997.06
647Special 3054. TRNSPT & install state furn APS push button system W O'connor ST & S 68TH (SPV.0060)EACH1$3,340.76$3,340.76
648Special 3055. TRNSPT & install state furn APS push button system W kearney ST & S 68TH (SPV.0060)EACH1$2,997.06$2,997.06
649Special 3056. TRNSPT & install state furn APS push button sys IH94 WB on ramp & N hawley (SPV.0060)EACH1$1,278.56$1,278.56
650Special 3057. TRNSPT & install state furn APS push button sys IH94 EB off ramp &S hawley (SPV.0060)EACH1$1,622.26$1,622.26
651Special 3058. TRNSPT & instl state furn evp heads with confirm lights W O'connor & 70TH (SPV.0060)EACH1$3,563.15$3,563.15
652Special 3059. TRNSPT & install state furn evp heads with confirm lights W kearney & 70TH (SPV.0060)EACH1$2,628.29$2,628.29
653Special 3060. TRNSPT & instl state furn evp heads with confirm lights W O'connor & 68TH (SPV.0060)EACH1$2,628.29$2,628.29
654Special 3061. TRNSPT & install state furn evp heads with confirm lights W kearney & 68TH (SPV.0060)EACH1$2,628.29$2,628.29
655Special 3062. TRNSPT & install state furn evp heads with confirmation lights IH 94 WB on (SPV.0060)EACH1$1,769.04$1,769.04
656Special 3063. TRNSPT & install state furn evp heads with confirmation lights IH 94 EB of (SPV.0060)EACH1$1,769.04$1,769.04
657Special 3064. temporary evp system W kearney ST & S 70TH ST (SPV.0060)EACH1$3,504.72$3,504.72
658Special 3065. remove traffic signal equipment (SPV.0060)EACH3$564.98$564.98
659Special 3066. relocate pedestrian push button (APS) (SPV.0060)EACH3$527.23$527.23
660Special 3067. relocate pedestrian head (SPV.0060)EACH3$537.34$537.34
661Special 3068. temporary overhead cable W wisconsin ave & N hawley RD (SPV.0060)EACH1$1,287.25$1,287.25
662Special 3069. TRNSPRT and install S-F FO cable pigtail 8-CT W O'connor ST & S 68TH ST (SPV.0060)EACH1$687.40$687.40
663Special 3070. TRNSPRT and install S-F FO cable pigtail 8-CT W kearney ST & S 68TH ST (SPV.0060)EACH1$687.40$687.40
664Special 3071. TRNSPRT and install S-F FO cable pigtail 8-CT IH 94 WB on ramp & N hawley (SPV.0060)EACH1$687.40$687.40
665Special 3072. TRNSPRT and install S-F FO cable pigtail 8-CT IH 94 EB off ramp & S hawley (SPV.0060)EACH1$687.40$687.40
666Special 4083. temporary bridge widening B-40-83 (SPV.0060)EACH1$1,000,000$1,000,000
667Special 4085. temporary bridge widening B-40-85 (SPV.0060)EACH1$1,000,000$1,000,000
668Special 4087. temporary bridge widening B-40-87 (SPV.0060)EACH1$1,000,000$1,000,000
669Special 4200. anchor assemblies noise barrier structures (SPV.0060)EACH386$100.00$100.00
670Special 4383. temporary pier support B-40-83 (SPV.0060)EACH2$75,000$75,000
671Special 4385. temporary pier support B-40-85 (SPV.0060)EACH6$25,000$25,000
672Special 4400. cored holes 4-inch (SPV.0060)EACH8$200.00$200.00
673Special 5001. permanent connection to existing 36-inch water main (SPV.0060)EACH2$12,280$69,000
674Special 5002. permanent connection to existing 48-inch water main (SPV.0060)EACH1$24,123$97,000
675Special 5003. adjusting water valve boxes (SPV.0060)EACH26$324.00$375.00
676Special 5004. adjusting water manhole (SPV.0060)EACH8$680.00$724.00
677Special 5005. installing hydrant- alteration (SPV.0060)EACH6$2,704.00$12,900
678Special 5006. blowoff manhole (SPV.0060)EACH4$60,470$67,000
679Special 5007. inspection manhole (SPV.0060)EACH1$39,018$76,000
680Special 5008. removing hydrant/minor (SPV.0060)EACH1$2,201.00$2,310.00
681Special 5009. installing hydrant (SPV.0060)EACH1$10,747$16,000
682Special 5100. adjusting sanitary manhole (SPV.0060)EACH12$604.00$1,150.00
683Special 5101. internal sanitary manhole seals (SPV.0060)EACH12$794.00$843.00
684Special 5200. manholes type tes 4-FT diameter (SPV.0060)EACH7$13,181$13,181
685Special 5201. manholes type tes doghouse 4-FT diameter (SPV.0060)EACH2$13,868$13,868
686Special 5203. manholes type tes doghouse 4-FT diameter installed over conduit (SPV.0060)EACH2$13,868$13,868
687Special 5204. removing cuc manhole (SPV.0060)EACH2$3,068.02$3,068.02
688Special 8000. hawley road pond outlet storm sewer structure (SPV.0060)EACH1$16,271$20,900
689Special 8001. temporary storm sewer plug (SPV.0060)EACH37$563.00$269.00
690Special 8002. detention pond anti- seep collar (SPV.0060)EACH1$1,589.00$2,900.00
691Special 8003. reconnect storm sewer (SPV.0060)EACH127$1,000.00$1,610.00
692Special 8004. fastening sewer access covers (SPV.0060)EACH25$394.00$137.00
693Special 8005. sealing storm structure (SPV.0060)EACH5$706.00$547.00
694Special 8006. control of water storm sewer (SPV.0060)EACH1$10,000$25,000
695Special 8007. cover plates left in place (SPV.0060)EACH20$426.00$296.00
696Special 8008. inlet covers type beehive A (SPV.0060)EACH3$1,275.00$1,770.00
697Special 8009. manhole covers type 58-A (SPV.0060)EACH32$1,226.00$1,720.00
698Special 8010. inlet covers type MS 57 (SPV.0060)EACH87$940.00$1,160.00
699Special 8012. inlet cover type 55 (SPV.0060)EACH6$1,175.00$1,630.00
700Special 0200. pavement cleanup project 1060-27-71 (SPV.0075)HRS2,000$300.00$175.00
701Special 4010. obstructions foundation drilling (SPV.0075)HRS40$1,200.00$1,200.00
702Special 4020. obstructions piling steel sheet permanent installed (SPV.0075)HRS17$1,500.00$2,055.52
703Special 0250. concrete curb & gutter 55-inch (SPV.0090)LF188$114.36$42.00
704Special 0251. concrete curb & gutter 4-inch sloped 60-inch type A (SPV.0090)LF1,038$52.22$40.00
705Special 0252. concrete barrier type S56 special 34-inch (SPV.0090)LF503$143.08$125.00
706Special 0253. concrete barrier type S56 special light pole base (SPV.0090)LF24$1,770.20$1,628.53
707Special 0254. concrete barrier type S56 special vertical back (SPV.0090)LF657$128.31$210.00
708Special 0255. concrete barrier type S42 special (SPV.0090)LF8,360$63.85$110.00
709Special 0256. concrete barrier type S56 special (SPV.0090)LF3,384$75.84$129.00
710Special 0257. concrete barrier type S42C special (SPV.0090)LF1,378$177.63$260.00
711Special 0258. concrete barrier type S56C special (SPV.0090)LF1,350$205.43$275.00
712Special 0259. concrete barrier type S32 special (SPV.0090)LF90$339.84$120.00
713Special 0261. pipe underdrain 6- inch special (SPV.0090)LF27,179$17.00$13.00
714Special 0265. concrete barrier type S32C reverse footing (SPV.0090)LF557$218.68$265.00
715Special 0266. concrete barrier type S56C reverse footing (SPV.0090)LF579$157.50$270.00
716Special 0270. marking stop line epoxy 24-inch (SPV.0090)LF410$24.80$24.80
717Special 0271. marking crosswalk epoxy transverse line 12-inch (SPV.0090)LF862$19.40$19.40
718Special 0272. marking crosswalk epoxy block style 12-inch (SPV.0090)LF3,006$19.40$19.40
719Special 0274. marking epoxy 6-inch black non grooved (SPV.0090)LF1,637$1.00$1.00
720Special 0275. marking epoxy 10- inch black non grooved (SPV.0090)LF426$1.50$1.50
721Special 0702. concrete barrier temporary precast left in place (SPV.0090)LF1,071$40.00$40.00
722Special 0703. fence temporary 6- FT (SPV.0090)LF2,000$25.00$25.00
723Special 0704. glare screens temporary (SPV.0090)LF4,418$5.25$5.25
724Special 0705. glare screen temporary left in place (SPV.0090)LF1,952$17.45$17.45
725Special 0711. removing concrete barrier precast (SPV.0090)LF512$10.00$10.00
726Special 1001. cable aerial aluminum 6 AWG triplex (SPV.0090)LF23,805$1.71$1.71
727Special 1002. cable aerial aluminum 4 AWG triplex (SPV.0090)LF1,365$1.96$1.96
728Special 1004. conduit 3-inch HDPE schedule 40 (SPV.0090)LF1,170$29.63$29.63
729Special 1008. electrical cable type 3#12 UF with ground (SPV.0090)LF6,381$1.90$1.90
730Special 1009. electrical cable type 4#8/1#1 XLP (SPV.0090)LF2,880$7.57$7.57
731Special 1010. electrical cable type 4#6/1#8 XLP (SPV.0090)LF60$7.89$7.89
732Special 1011. electrical cable type 4#4/1#8 XLP (SPV.0090)LF37,320$9.84$9.84
733Special 2000. outdoor rated network cable (SPV.0090)LF5,360$1.64$1.64
734Special 4000. removing existing timber piling (SPV.0090)LF1,205$25.00$25.00
735Special 4020. foundation drilling 36-inch diameter (SPV.0090)LF1,240$148.00$148.00
736Special 5001. steel casing W/ ductile iron 36-inch carrier (SPV.0090)LF25$3,638.00$3,312.00
737Special 5002. ductile iron water main 36-inch (SPV.0090)LF200$1,966.00$3,800.00
738Special 5003. ductile iron water main 48-inch (SPV.0090)LF762$2,478.00$2,475.00
739Special 5004. abandon existing 36- inch water main (SPV.0090)LF120$66.00$102.00
740Special 5005. abandon existing 48- inch water main (SPV.0090)LF720$127.00$110.00
741Special 5006. removing water main (SPV.0090)LF30$57.00$160.00
742Special 5007. ductile iron water main 12-inch (SPV.0090)LF21$1,889.00$1,500.00
743Special 5008. ductile iron hydrant branch 6-inch (SPV.0090)LF23$709.00$432.00
744Special 5120. sewer exams by CCTV post construction (SPV.0090)LF7,037$4.00$5.00
745Special 5201. 4-duct conduit cement encased 4-inch conduit (SPV.0090)LF2,576$157.63$157.63
746Special 5210. conduit subduct 1- inch (SPV.0090)LF1,207$3.57$3.57
747Special 5211. furnish municipal fiber optic cable 72 count (SPV.0090)LF1,387$2.49$2.49
748Special 8000. drain slotted vane temporary (SPV.0090)LF1,437$364.00$803.00
749Special 8001. pipe underdrain exploration (SPV.0090)LF500$32.00$9.50
750Special 8002. drain slotted vane permanent (SPV.0090)LF1,787$369.00$716.00
751Special 4000. timber lagging (SPV.0110)MBM15$6,000.00$6,000.00
752Special 0301. vibration monitoring (SPV.0135)MON40$1,000.00$12,477
753Special 0400. tactile directional indicators (SPV.0165)SF4,631$56.36$45.00
754Special 0401. high friction traffic marking green bike lane panel (SPV.0165)SF2,222$9.00$9.00
755Special 4000. longitudinal grooving bridge deck (SPV.0165)SF82,584$1.12$1.12
756Special 4100. geocomposite drain board (SPV.0165)SF4,970$2.50$2.50
757Special 4500. piling steel sheet permanent installed R-40-801 (SPV.0165)SF19,020$55.00$55.87
758Special 4600. screening fence structure mounted (SPV.0165)SF6,280$70.00$70.00
759Special 4610. screening fence ground mounted (SPV.0165)SF10,150$90.00$90.00
760Special 4700. temporary wall wire faced mechanically stabilized earth (SPV.0165)SF10,283$200.00$90.50
761Special 4734. wall concrete panel mechanically stabilized earth R-40- 734 (SPV.0165)SF10,700$250.00$144.00
762Special 4735. wall concrete panel mechanically stabilized earth R-40- 735 (SPV.0165)SF11,600$250.00$187.00
763Special 4736. wall concrete panel mechanically stabilized earth R-40- 736 (SPV.0165)SF18,526$250.00$159.00
764Special 4737. wall concrete panel mechanically stabilized earth R-40- 737 (SPV.0165)SF15,087$250.00$181.00
765Special 4739. wall concrete panel mechanically stabilized earth R-40- 739 (SPV.0165)SF10,135$250.00$174.00
766Special 4740. wall concrete panel mechanically stabilized earth R-40- 740 (SPV.0165)SF5,987$250.00$193.00
767Special 4741. wall concrete panel mechanically stabilized earth R-40- 741 (SPV.0165)SF7,720$250.00$178.00
768Special 4742. wall concrete panel mechanically stabilized earth R-40- 742 (SPV.0165)SF3,620$250.00$193.00
769Special 4744. wall concrete panel mechanically stabilized earth R-40- 744 (SPV.0165)SF1,486$250.00$170.00
770Special 4762. wall concrete panel mechanically stabilized earth R-40- 762 (SPV.0165)SF2,830$250.00$158.00
771Special 0420. asphaltic material binder (SPV.0180)SY1,091$16.00$16.00
772Special 0421. HPC pavement 9- inch (SPV.0180)SY35,541$84.10$84.10
773Special 0422. HPC pavement hes 9-inch (SPV.0180)SY758$151.71$151.71
774Special 0423. HPC pavement 12- inch (SPV.0180)SY82,658$89.17$89.17
775Special 0443. HMA longitudinal joint repair (SPV.0195)TON100$325.00$325.00
776Special 0444. HMA transverse joint repair (SPV.0195)TON100$325.00$325.00
WisDOT contract 20250909006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy