WisDOT contract 20251014029 bid tabulation
C Brookfield, Capitol Dr; Brookfield Rd to 124th St (STH 190, Waukesha County C Brookfield, Capitol Dr). Let by Wisconsin DOT on October 14, 2025, Waukesha. 6 bids received; low bid $11,523,972 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 283
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $11,523,972 | Low |
| 2 | Lalonde Contractors Incorporated | $11,888,807 | +3.0% |
| 3 | Zignego Company, Inc. | $11,942,200 | +4.0% |
| 4 | Stark Pavement Corporation | $12,466,886 | +8.0% |
| 5 | Vinton Construction Company | $12,487,472 | +8.0% |
| 6 | Rock Road Companies, Inc. | $13,588,160 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Lalonde Contractors Incorporated | 3. Zignego Company, Inc. | 4. Stark Pavement Corporation | 5. Vinton Construction Company | 6. Rock Road Companies, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 45 | $75.76 | $65.00 | $75.00 | $75.75 | $75.00 | $75.00 |
| 2 | Grubbing (201.0220) | ID | 45 | $27.78 | $5.00 | $27.50 | $27.78 | $27.50 | $27.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 4 | $4,115.00 | $500.00 | $1,000.00 | $1,350.00 | $995.00 | $4,115.00 |
| 4 | Removing structure (structure) 01. C-67-0035 (203.0220) | EACH | 1 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 |
| 5 | Removing concrete pavement (204.0100) | SY | 241 | $12.00 | $23.87 | $30.00 | $15.00 | $21.00 | $12.00 |
| 6 | Removing asphaltic surface (204.0110) | SY | 816 | $15.00 | $14.54 | $30.00 | $15.00 | $12.68 | $15.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 151 | $15.00 | $16.95 | $16.95 | $21.00 | $16.95 | $13.14 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 274,109 | $2.65 | $2.61 | $2.61 | $2.55 | $2.61 | $4.59 |
| 9 | Removing curb & gutter (204.0150) | LF | 7,828 | $7.16 | $15.95 | $8.00 | $15.00 | $12.50 | $7.16 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 3,368 | $8.40 | $12.26 | $8.00 | $12.00 | $13.68 | $8.40 |
| 11 | Removing guardrail (204.0165) | LF | 370 | $5.00 | $2.95 | $5.00 | $3.10 | $3.10 | $5.00 |
| 12 | Removing masonry (204.0185) | CY | 2 | $345.00 | $2,026.00 | $1,000.00 | $500.00 | $600.00 | $345.00 |
| 13 | Removing concrete bases (204.0195) | EACH | 13 | $475.00 | $445.77 | $500.00 | $500.00 | $475.00 | $475.00 |
| 14 | Removing manholes (204.0210) | EACH | 1 | $1,665.00 | $500.00 | $1,000.00 | $1,250.00 | $865.00 | $1,665.00 |
| 15 | Removing catch basins (204.0215) | EACH | 2 | $805.00 | $500.00 | $1,000.00 | $815.00 | $518.25 | $805.00 |
| 16 | Removing inlets (204.0220) | EACH | 32 | $890.00 | $500.00 | $650.00 | $375.00 | $449.72 | $890.00 |
| 17 | Removing storm sewer (size) 01. 60-inch (204.0245) | LF | 56 | $45.00 | $500.00 | $100.00 | $150.00 | $61.70 | $45.00 |
| 18 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 105 | $25.00 | $40.00 | $100.00 | $20.00 | $20.29 | $25.00 |
| 19 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 16 | $90.00 | $40.00 | $200.00 | $20.00 | $25.94 | $90.00 |
| 20 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 104 | $25.00 | $40.00 | $100.00 | $25.00 | $20.75 | $25.00 |
| 21 | Removing storm sewer (size) 05. 24-inch (204.0245) | LF | 16 | $90.00 | $40.00 | $200.00 | $35.00 | $36.58 | $90.00 |
| 22 | Removing storm sewer (size) 06. 30-inch (204.0245) | LF | 8 | $100.00 | $50.00 | $200.00 | $50.00 | $59.13 | $100.00 |
| 23 | Removing storm sewer (size) 07. 54-inch (204.0245) | LF | 8 | $100.00 | $50.00 | $200.00 | $150.00 | $60.94 | $100.00 |
| 24 | Removing (item description) 01. traffic signals, STH 190 & brookfield RD (204.9060.S) | EACH | 1 | $897.35 | $897.35 | $898.03 | $898.03 | $897.35 | $897.35 |
| 25 | Removing (item description) 02. traffic signals, STH 190 & imperial DR (204.9060.S) | EACH | 1 | $897.35 | $897.35 | $898.03 | $898.03 | $897.35 | $897.35 |
| 26 | Removing (item description) 03. traffic signals, STH 190 & calhoun RD (204.9060.S) | EACH | 1 | $897.35 | $897.35 | $898.03 | $898.03 | $897.35 | $897.35 |
| 27 | Removing (item description) 04. traffic signals, STH 190 & lilly RD (204.9060.S) | EACH | 1 | $897.00 | $897.00 | $898.00 | $898.03 | $897.00 | $897.00 |
| 28 | Removing (item description) 05. traffic signals, STH 190 & 128TH ST (204.9060.S) | EACH | 1 | $897.00 | $897.00 | $898.00 | $898.03 | $897.00 | $897.00 |
| 29 | Removing (item description) 06. traffic signals, STH 190 & 124TH ST (204.9060.S) | EACH | 1 | $897.00 | $897.00 | $898.00 | $898.03 | $897.00 | $897.00 |
| 30 | Removing (item description) 10. apron endwalls (204.9060.S) | EACH | 11 | $560.00 | $500.00 | $650.00 | $250.00 | $749.55 | $560.00 |
| 31 | Excavation for structures culverts (structure) 01. C-67-0035 (206.2001) | EACH | 1 | $3,120.00 | $3,120.00 | $3,120.00 | $3,120.00 | $3,120.00 | $3,120.00 |
| 32 | Backfill granular grade 2 (209.2500) | TON | 10 | $280.00 | $123.90 | $100.00 | $60.00 | $99.16 | $100.00 |
| 33 | Backfill structure type B (210.2500) | TON | 15 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 34 | Finishing roadway (project) 01. ID 2025-03-73 (213.0100) | EACH | 1 | $2,250.00 | $3,280.00 | $1,000.00 | $14,800 | $7,500.00 | $12,387 |
| 35 | Base aggregate dense 3/4-inch (305.0110) | TON | 533 | $9.38 | $25.89 | $30.00 | $45.00 | $45.00 | $39.02 |
| 36 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,851 | $20.00 | $22.94 | $24.00 | $25.00 | $0.01 | $20.00 |
| 37 | Shaping shoulders (305.0500) | STA | 131 | $190.00 | $57.73 | $200.00 | $185.00 | $50.00 | $22.13 |
| 38 | Removing pavement for base patching (390.0100) | CY | 3,386 | $69.69 | $70.44 | $1.00 | $144.00 | $0.01 | $69.69 |
| 39 | Base patching asphaltic (390.0201) | TON | 743 | $175.00 | $145.00 | $245.00 | $225.00 | $145.00 | $152.67 |
| 40 | Base patching concrete shes (390.0405) | CY | 2,132 | $365.00 | $433.96 | $445.00 | $417.60 | $680.00 | $365.00 |
| 41 | Drilled tie bars (416.0610) | EACH | 3,397 | $10.00 | $16.99 | $15.00 | $9.50 | $10.00 | $10.00 |
| 42 | Drilled dowel bars (416.0620) | EACH | 6,836 | $15.00 | $20.24 | $30.00 | $15.00 | $18.50 | $15.00 |
| 43 | HMA cold weather paving (450.4000) | TON | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $5.00 |
| 44 | Tack coat (455.0605) | GAL | 32,954 | $2.25 | $2.25 | $2.25 | $3.00 | $2.25 | $3.45 |
| 45 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $400.00 | $400.00 | $400.00 | $3,850.00 | $400.00 | $3,500.00 |
| 46 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $3,850.00 | $1,000.00 | $3,500.00 |
| 47 | Incentive density PWL HMA pavement (460.2005) | DOL | 41,162 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 48 | Incentive air voids HMA pavement (460.2010) | DOL | 67,049 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 39,461 | $68.50 | $69.40 | $69.40 | $68.80 | $69.40 | $90.58 |
| 50 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 27,620 | $79.05 | $79.95 | $79.95 | $74.30 | $79.95 | $92.48 |
| 51 | Asphaltic surface (465.0105) | TON | 30 | $245.00 | $245.00 | $245.00 | $250.00 | $245.00 | $233.62 |
| 52 | Asphaltic surface patching (465.0110) | TON | 25 | $245.00 | $245.00 | $245.00 | $250.00 | $245.00 | $233.62 |
| 53 | Asphaltic surface driveways and field entrances (465.0120) | TON | 89 | $245.00 | $245.00 | $245.00 | $250.00 | $245.00 | $174.82 |
| 54 | Asphaltic surface temporary (465.0125) | TON | 50 | $245.00 | $245.00 | $245.00 | $250.00 | $245.00 | $153.99 |
| 55 | Asphaltic surface safety islands (465.0305) | TON | 25 | $245.00 | $245.00 | $245.00 | $250.00 | $245.00 | $232.04 |
| 56 | Asphaltic curb (465.0310) | LF | 45 | $12.00 | $12.25 | $12.25 | $112.00 | $12.25 | $14.39 |
| 57 | Asphaltic flumes (465.0315) | SY | 64 | $60.00 | $60.00 | $60.00 | $62.50 | $60.00 | $59.73 |
| 58 | Adhesive anchors no. 5 bar (502.4205) | EACH | 46 | $26.00 | $26.00 | $26.00 | $26.00 | $26.00 | $26.00 |
| 59 | Concrete masonry culverts (504.0100) | CY | 2 | $3,603.00 | $3,603.00 | $3,603.00 | $3,603.00 | $3,603.00 | $3,603.00 |
| 60 | Concrete masonry endwalls (504.0900) | CY | 6 | $2,293.00 | $2,293.00 | $2,293.00 | $2,293.00 | $2,293.00 | $2,293.00 |
| 61 | Bar steel reinforcement HS structures (505.0400) | LB | 500 | $1.76 | $1.76 | $1.76 | $1.76 | $1.76 | $1.76 |
| 62 | Concrete surface repair (509.1500) | SF | 30 | $290.00 | $290.00 | $290.00 | $290.00 | $290.00 | $290.00 |
| 63 | Sheet membrane waterproofing for buried structures (516.0610.S) | SY | 10 | $87.00 | $87.00 | $87.00 | $87.00 | $87.00 | $87.00 |
| 64 | Culvert pipe temporary 12-inch (520.2012) | LF | 54 | $80.00 | $80.00 | $75.00 | $40.00 | $101.95 | $80.00 |
| 65 | Concrete collars for pipe (520.8000) | EACH | 65 | $845.00 | $600.00 | $850.00 | $750.00 | $1,089.23 | $845.00 |
| 66 | Cleaning culvert pipes (520.8700) | EACH | 96 | $900.00 | $1,300.00 | $400.00 | $850.00 | $1,029.69 | $800.00 |
| 67 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 3 | $575.00 | $500.00 | $900.00 | $500.00 | $362.89 | $575.00 |
| 68 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $735.00 | $600.00 | $1,000.00 | $600.00 | $511.19 | $735.00 |
| 69 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 1 | $1,180.00 | $800.00 | $1,155.00 | $1,200.00 | $963.15 | $1,180.00 |
| 70 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 1 | $1,510.00 | $1,200.00 | $1,350.00 | $1,350.00 | $1,396.90 | $1,510.00 |
| 71 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 36 | $75.00 | $100.00 | $100.00 | $75.00 | $138.06 | $75.00 |
| 72 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,605.00 | $1,300.00 | $1,300.00 | $1,250.00 | $1,000.93 | $1,605.00 |
| 73 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,740.00 | $1,500.00 | $1,300.00 | $1,500.00 | $1,219.53 | $1,740.00 |
| 74 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,785.00 | $1,800.00 | $1,300.00 | $1,700.00 | $1,457.23 | $1,785.00 |
| 75 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $2,035.00 | $1,900.00 | $1,700.00 | $1,750.00 | $1,884.83 | $2,035.00 |
| 76 | Apron endwalls for culvert pipe reinforced concrete 27-inch (522.1027) | EACH | 1 | $2,100.00 | $2,000.00 | $2,000.00 | $2,100.00 | $2,034.85 | $2,100.00 |
| 77 | Apron endwalls for culvert pipe salvaged 12-inch (524.0612) | EACH | 1 | $1,650.00 | $500.00 | $550.00 | $450.00 | $739.50 | $1,650.00 |
| 78 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 2 | $1,905.00 | $700.00 | $550.00 | $550.00 | $935.00 | $1,905.00 |
| 79 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 1 | $1,650.00 | $1,130.00 | $550.00 | $600.00 | $1,889.50 | $1,650.00 |
| 80 | Apron endwalls for culvert pipe salvaged 30-inch (524.0630) | EACH | 1 | $1,650.00 | $1,500.00 | $550.00 | $700.00 | $2,085.00 | $1,650.00 |
| 81 | Concrete curb & gutter 31-inch (601.0331) | LF | 179 | $71.26 | $55.21 | $60.00 | $65.00 | $40.00 | $71.26 |
| 82 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 114 | $66.95 | $49.63 | $60.00 | $40.50 | $35.00 | $66.95 |
| 83 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 107 | $64.61 | $47.57 | $60.00 | $40.50 | $35.00 | $64.61 |
| 84 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,941 | $51.49 | $54.64 | $55.00 | $50.25 | $40.00 | $51.49 |
| 85 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,985 | $61.00 | $51.93 | $55.00 | $50.25 | $38.00 | $61.00 |
| 86 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 1,116 | $57.00 | $57.55 | $60.00 | $50.25 | $33.00 | $57.00 |
| 87 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 1,272 | $55.11 | $54.47 | $60.00 | $50.25 | $33.00 | $55.11 |
| 88 | Concrete curb pedestrian (601.0600) | LF | 237 | $30.28 | $55.19 | $100.00 | $55.00 | $44.00 | $30.28 |
| 89 | Concrete sidewalk 5-inch (602.0410) | SF | 27,783 | $9.05 | $8.46 | $10.79 | $9.75 | $11.50 | $9.05 |
| 90 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,558 | $36.00 | $39.66 | $50.00 | $50.00 | $44.00 | $36.00 |
| 91 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 523 | $48.00 | $55.94 | $75.00 | $60.00 | $54.00 | $48.00 |
| 92 | Concrete driveway 7-inch (602.0815) | SY | 191 | $108.11 | $87.22 | $120.00 | $80.00 | $67.00 | $108.11 |
| 93 | Concrete driveway hes 7-inch (602.0865) | SY | 149 | $116.35 | $90.88 | $150.00 | $90.00 | $77.00 | $116.35 |
| 94 | Concrete barrier temporary precast delivered (603.8000) | LF | 100 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 |
| 95 | Concrete barrier temporary precast installed (603.8125) | LF | 100 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 96 | Riprap medium (606.0200) | CY | 8 | $330.00 | $353.40 | $300.00 | $40.00 | $160.00 | $197.97 |
| 97 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 105 | $545.00 | $160.00 | $130.00 | $150.00 | $261.66 | $545.00 |
| 98 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 63 | $185.00 | $145.00 | $155.00 | $95.00 | $265.99 | $185.00 |
| 99 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 104 | $535.00 | $180.00 | $140.00 | $150.00 | $274.98 | $535.00 |
| 100 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 16 | $510.00 | $200.00 | $200.00 | $215.00 | $300.63 | $510.00 |
| 101 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 8 | $680.00 | $220.00 | $200.00 | $250.00 | $372.64 | $680.00 |
| 102 | Storm sewer pipe reinforced concrete class III 54-inch (608.0354) | LF | 8 | $1,360.00 | $470.00 | $200.00 | $725.00 | $568.82 | $1,360.00 |
| 103 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 194 | $215.00 | $195.00 | $200.00 | $225.00 | $269.04 | $215.00 |
| 104 | Storm sewer pipe reinforced concrete class IV 60-inch (608.0460) | LF | 56 | $715.00 | $425.00 | $900.00 | $650.00 | $585.01 | $715.00 |
| 105 | Reconstructing inlets (611.0430) | EACH | 7 | $930.00 | $2,150.00 | $1,000.00 | $1,250.00 | $1,606.43 | $930.00 |
| 106 | Manhole covers type J (611.0530) | EACH | 1 | $1,465.00 | $900.00 | $850.00 | $550.00 | $1,017.78 | $1,465.00 |
| 107 | Inlet covers type A (611.0600) | EACH | 3 | $1,020.00 | $980.00 | $1,200.00 | $750.00 | $890.17 | $1,020.00 |
| 108 | Inlet covers type A-S (611.0603) | EACH | 1 | $1,420.00 | $900.00 | $1,200.00 | $750.00 | $1,219.29 | $1,420.00 |
| 109 | Inlet covers type H (611.0624) | EACH | 18 | $1,305.00 | $1,090.00 | $1,100.00 | $775.00 | $1,241.44 | $1,305.00 |
| 110 | Inlet covers type HM (611.0627) | EACH | 2 | $1,195.00 | $1,090.00 | $1,200.00 | $775.00 | $991.44 | $1,195.00 |
| 111 | Inlet covers type MS (611.0642) | EACH | 4 | $775.00 | $875.00 | $900.00 | $550.00 | $627.28 | $775.00 |
| 112 | Inlet covers type S (611.0651) | EACH | 2 | $1,210.00 | $950.00 | $1,100.00 | $750.00 | $1,237.22 | $1,210.00 |
| 113 | Inlet covers type W (611.0657) | EACH | 3 | $1,945.00 | $2,100.00 | $2,000.00 | $1,600.00 | $2,081.22 | $1,945.00 |
| 114 | Inlet covers type WM (611.0660) | EACH | 8 | $1,900.00 | $2,100.00 | $1,850.00 | $1,500.00 | $1,988.38 | $1,900.00 |
| 115 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,605.00 | $5,100.00 | $5,500.00 | $4,150.00 | $4,767.75 | $4,605.00 |
| 116 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,590.00 | $6,500.00 | $6,500.00 | $5,200.00 | $5,828.65 | $5,590.00 |
| 117 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $18,120 | $17,500 | $14,000 | $15,550 | $18,917 | $18,120 |
| 118 | Inlets 4-FT diameter (611.3004) | EACH | 10 | $2,515.00 | $3,850.00 | $3,950.00 | $3,625.00 | $4,438.59 | $2,515.00 |
| 119 | Inlets 2X2.5-FT (611.3225) | EACH | 10 | $1,700.00 | $3,000.00 | $3,550.00 | $2,525.00 | $3,148.09 | $1,700.00 |
| 120 | Inlets 2X3-FT (611.3230) | EACH | 10 | $1,860.00 | $3,500.00 | $3,550.00 | $2,650.00 | $3,277.86 | $1,860.00 |
| 121 | Inlets median 1 grate (611.3901) | EACH | 3 | $3,050.00 | $4,500.00 | $3,550.00 | $2,785.00 | $3,777.31 | $3,050.00 |
| 122 | Adjusting inlet covers (611.8115) | EACH | 40 | $780.00 | $943.67 | $800.00 | $925.00 | $750.00 | $780.00 |
| 123 | Cover plates temporary (611.8120.S) | EACH | 10 | $330.00 | $400.00 | $500.00 | $400.00 | $313.75 | $330.00 |
| 124 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 100 | $20.00 | $50.00 | $30.00 | $35.00 | $32.05 | $20.00 |
| 125 | Barrier system grading shaping finishing (614.0010) | EACH | 1 | $5,500.00 | $29,916 | $15,500 | $21,500 | $10,000 | $4,821.61 |
| 126 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $11,500 | $15,995 | $15,000 | $14,900 | $14,900 | $15,000 |
| 127 | Steel thrie beam (614.0230) | LF | 150 | $36.00 | $46.00 | $48.10 | $42.10 | $42.10 | $48.10 |
| 128 | Fence safety (616.0700.S) | LF | 247 | $3.50 | $4.75 | $8.75 | $4.00 | $4.00 | $8.75 |
| 129 | Mobilization (619.1000) | EACH | 1 | $306,200 | $267,168 | $119,000 | $747,000 | $834,000 | $541,687 |
| 130 | Concrete corrugated median (620.0100) | SF | 72 | $21.16 | $18.46 | $20.00 | $95.00 | $15.00 | $21.16 |
| 131 | Concrete median sloped nose (620.0300) | SF | 410 | $18.40 | $18.46 | $20.00 | $28.50 | $15.00 | $18.40 |
| 132 | Topsoil (625.0100) | SY | 8,049 | $10.00 | $4.95 | $10.00 | $6.10 | $6.10 | $10.00 |
| 133 | Mulching (627.0200) | SY | 643 | $0.50 | $0.55 | $0.75 | $0.40 | $0.40 | $0.75 |
| 134 | Erosion bales (628.1104) | EACH | 440 | $15.00 | $12.00 | $14.10 | $1.00 | $1.00 | $14.10 |
| 135 | Silt fence (628.1504) | LF | 100 | $3.00 | $3.00 | $5.95 | $4.00 | $4.00 | $5.95 |
| 136 | Silt fence maintenance (628.1520) | LF | 100 | $0.05 | $0.01 | $0.05 | $0.01 | $0.01 | $0.05 |
| 137 | Silt fence heavy duty (628.1530.S) | LF | 1,548 | $13.50 | $14.00 | $11.50 | $12.70 | $12.70 | $11.50 |
| 138 | Silt fence heavy duty maintenance (628.1535.S) | LF | 1,548 | $5.00 | $2.45 | $0.25 | $0.01 | $0.01 | $0.25 |
| 139 | Mobilizations erosion control (628.1905) | EACH | 4 | $250.00 | $100.00 | $200.00 | $100.00 | $100.00 | $200.00 |
| 140 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $100.00 | $100.00 | $50.00 | $50.00 | $100.00 |
| 141 | Erosion mat urban class I type B (628.2008) | SY | 7,860 | $1.80 | $1.85 | $2.45 | $2.10 | $2.10 | $2.45 |
| 142 | Inlet protection type A (628.7005) | EACH | 110 | $140.00 | $100.00 | $79.00 | $50.00 | $50.00 | $79.00 |
| 143 | Inlet protection type B (628.7010) | EACH | 146 | $50.00 | $50.00 | $40.00 | $50.00 | $50.00 | $40.00 |
| 144 | Inlet protection type C (628.7015) | EACH | 116 | $60.00 | $55.00 | $31.00 | $60.00 | $60.00 | $31.00 |
| 145 | Inlet protection type D (628.7020) | EACH | 12 | $125.00 | $105.00 | $84.10 | $150.00 | $150.00 | $84.10 |
| 146 | Temporary ditch checks (628.7504) | LF | 380 | $8.95 | $6.50 | $12.50 | $8.00 | $8.00 | $12.50 |
| 147 | Culvert pipe checks (628.7555) | EACH | 118 | $17.50 | $18.00 | $43.00 | $20.00 | $20.00 | $43.00 |
| 148 | Rock bags (628.7570) | EACH | 22 | $17.50 | $12.00 | $20.50 | $20.00 | $20.00 | $20.50 |
| 149 | Fertilizer type B (629.0210) | CWT | 4 | $75.00 | $85.00 | $90.00 | $80.00 | $80.00 | $90.00 |
| 150 | Seeding mixture no. 30 (630.0130) | LB | 1,521 | $7.95 | $8.50 | $8.95 | $1.00 | $1.00 | $8.95 |
| 151 | Seeding mixture no. 40 (630.0140) | LB | 1,662 | $8.95 | $12.50 | $9.05 | $2.00 | $2.00 | $9.05 |
| 152 | Seeding mixture no. 60 (630.0160) | LB | 262 | $18.00 | $22.00 | $10.90 | $8.00 | $8.00 | $10.90 |
| 153 | Seeding temporary (630.0200) | LB | 17 | $10.00 | $10.00 | $20.00 | $3.00 | $3.00 | $20.00 |
| 154 | Seed water (630.0500) | MGAL | 224 | $75.00 | $12.00 | $45.00 | $30.00 | $30.00 | $45.00 |
| 155 | Sod water (631.0300) | MGAL | 2.10 | $75.00 | $75.00 | $100.00 | $30.00 | $30.00 | $100.00 |
| 156 | Sod lawn (631.1000) | SY | 189 | $20.00 | $12.00 | $20.75 | $10.80 | $10.80 | $20.75 |
| 157 | Markers permanent flexible (633.5350) | EACH | 7 | $60.00 | $85.00 | $58.00 | $67.00 | $67.00 | $58.00 |
| 158 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 110 | $100.00 | $120.00 | $88.10 | $149.00 | $149.00 | $88.10 |
| 159 | Signs type II reflective H (637.2210) | SF | 779.92 | $19.50 | $22.00 | $22.00 | $21.00 | $21.00 | $22.00 |
| 160 | Signs type II reflective F (637.2230) | SF | 25 | $22.50 | $24.00 | $35.00 | $30.00 | $30.00 | $35.00 |
| 161 | Moving signs type II (638.2102) | EACH | 96 | $75.00 | $110.00 | $110.00 | $88.00 | $88.00 | $110.00 |
| 162 | Removing signs type II (638.2602) | EACH | 48 | $35.00 | $28.00 | $15.00 | $10.00 | $10.00 | $15.00 |
| 163 | Removing small sign supports (638.3000) | EACH | 89 | $35.00 | $28.00 | $18.00 | $10.00 | $10.00 | $18.00 |
| 164 | Moving small sign supports (638.4000) | EACH | 10 | $75.00 | $80.00 | $100.00 | $40.00 | $40.00 | $100.00 |
| 165 | Traffic control drums (643.0300) | DAY | 107,728 | $0.16 | $0.16 | $0.15 | $0.16 | $0.15 | $0.15 |
| 166 | Traffic control barricades type III (643.0420) | DAY | 16,813 | $0.40 | $0.40 | $0.42 | $0.40 | $0.42 | $0.42 |
| 167 | Traffic control warning lights type A (643.0705) | DAY | 33,626 | $0.13 | $0.13 | $0.10 | $0.13 | $0.10 | $0.10 |
| 168 | Traffic control warning lights type C (643.0715) | DAY | 6,685 | $0.24 | $0.24 | $0.12 | $0.24 | $0.12 | $0.12 |
| 169 | Traffic control arrow boards (643.0800) | DAY | 276 | $14.78 | $14.78 | $7.85 | $14.78 | $7.85 | $7.85 |
| 170 | Traffic control signs (643.0900) | DAY | 37,487 | $0.37 | $0.37 | $0.22 | $0.37 | $0.22 | $0.22 |
| 171 | Traffic control covering signs type I (643.0910) | EACH | 2 | $76.12 | $76.12 | $275.00 | $76.12 | $275.00 | $275.00 |
| 172 | Traffic control covering signs type II (643.0920) | EACH | 25 | $91.32 | $91.32 | $55.00 | $91.32 | $55.00 | $55.00 |
| 173 | Traffic control signs PCMS (643.1050) | DAY | 48 | $61.81 | $61.81 | $54.50 | $61.81 | $54.50 | $54.50 |
| 174 | Traffic control cones 42-inch (643.1070) | DAY | 195,648 | $0.11 | $0.11 | $0.15 | $0.11 | $0.15 | $0.15 |
| 175 | Temporary marking line paint 6- inch (643.3165) | LF | 52,954 | $0.35 | $0.35 | $0.15 | $0.35 | $0.15 | $0.15 |
| 176 | Temporary marking line removable tape 6-inch (643.3180) | LF | 98,073 | $1.82 | $1.82 | $1.75 | $1.82 | $1.75 | $1.75 |
| 177 | Temporary marking line paint 10- inch (643.3265) | LF | 201 | $0.69 | $0.69 | $0.30 | $0.69 | $0.30 | $0.30 |
| 178 | Temporary marking line removable tape 10-inch (643.3280) | LF | 16,435 | $3.50 | $3.50 | $3.25 | $3.50 | $3.25 | $3.25 |
| 179 | Traffic control interim lane closure (643.4100) | EACH | 70 | $1.82 | $1,157.31 | $725.00 | $1,157.31 | $725.00 | $725.00 |
| 180 | Traffic control (643.5000) | EACH | 1 | $25,438 | $25,438 | $120,450 | $25,438 | $120,450 | $120,450 |
| 181 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,620 | $8.00 | $16.00 | $5.00 | $12.00 | $10.00 | $12.78 |
| 182 | Temporary pedestrian surface plate (644.1430) | SF | 460 | $8.77 | $8.77 | $5.00 | $8.77 | $12.00 | $12.00 |
| 183 | Temporary pedestrian surface matting (644.1440) | SF | 8,740 | $1.61 | $1.61 | $5.00 | $1.61 | $1.85 | $1.85 |
| 184 | Temporary pedestrian curb ramp (644.1601) | DAY | 2,110 | $5.22 | $5.22 | $10.00 | $5.22 | $7.80 | $7.80 |
| 185 | Temporary pedestrian detectable warning field (644.1605) | SF | 1,360 | $8.49 | $8.49 | $30.00 | $8.49 | $3.40 | $3.40 |
| 186 | Temporary pedestrian barricade (644.1810) | LF | 15,488 | $6.85 | $6.85 | $4.00 | $6.85 | $4.00 | $4.00 |
| 187 | Geotextile type HR (645.0120) | SY | 1,004 | $35.00 | $4.92 | $6.00 | $7.50 | $3.50 | $5.00 |
| 188 | Marking line epoxy 4-inch (646.1020) | LF | 543 | $0.65 | $0.65 | $0.33 | $0.66 | $0.33 | $0.33 |
| 189 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 1,267 | $1.15 | $1.15 | $1.09 | $1.17 | $1.09 | $1.09 |
| 190 | Marking line epoxy 6-inch (646.2020) | LF | 47,564 | $0.80 | $0.80 | $0.46 | $0.81 | $0.46 | $0.46 |
| 191 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 23,757 | $1.05 | $1.05 | $0.83 | $1.07 | $0.83 | $0.83 |
| 192 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 70,527 | $1.47 | $1.47 | $1.36 | $1.50 | $1.36 | $1.36 |
| 193 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 1,032 | $2.00 | $2.00 | $1.77 | $2.02 | $1.77 | $1.77 |
| 194 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 33,372 | $2.45 | $2.45 | $2.72 | $2.48 | $2.72 | $2.72 |
| 195 | Marking arrow epoxy (646.5020) | EACH | 119 | $220.00 | $220.00 | $247.00 | $222.20 | $247.00 | $247.00 |
| 196 | Marking word epoxy (646.5120) | EACH | 63 | $240.00 | $240.00 | $298.00 | $242.40 | $298.00 | $298.00 |
| 197 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,440 | $13.00 | $13.00 | $13.00 | $13.13 | $13.00 | $13.00 |
| 198 | Marking yield line epoxy 18-inch (646.6220) | EACH | 65 | $65.00 | $65.00 | $36.47 | $65.65 | $36.47 | $36.47 |
| 199 | Cold weather marking epoxy 4-inch (646.6464) | LF | 500 | $0.60 | $0.60 | $0.24 | $0.61 | $0.24 | $0.24 |
| 200 | Cold weather marking epoxy 6-inch (646.6466) | LF | 35,600 | $0.75 | $0.75 | $0.34 | $0.76 | $0.34 | $0.34 |
| 201 | Cold weather marking epoxy 8-inch (646.6468) | LF | 300 | $1.40 | $1.40 | $0.66 | $1.42 | $0.66 | $0.66 |
| 202 | Cold weather marking epoxy 10- inch (646.6470) | LF | 8,300 | $1.60 | $1.60 | $0.75 | $1.62 | $0.75 | $0.75 |
| 203 | Marking diagonal epoxy 12-inch (646.7120) | LF | 473 | $9.75 | $9.75 | $15.00 | $9.85 | $15.00 | $15.00 |
| 204 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 4,942 | $10.25 | $10.25 | $12.50 | $10.36 | $12.50 | $12.50 |
| 205 | Marking curb epoxy (646.8120) | LF | 3,403 | $8.00 | $8.00 | $7.30 | $8.08 | $7.30 | $7.30 |
| 206 | Marking island nose epoxy (646.8220) | EACH | 56 | $270.00 | $270.00 | $274.50 | $272.70 | $274.50 | $274.50 |
| 207 | Marking removal line 4-inch (646.9000) | LF | 11,396 | $0.45 | $0.45 | $0.25 | $0.45 | $0.25 | $0.25 |
| 208 | Marking removal line 8-inch (646.9100) | LF | 408 | $0.95 | $0.95 | $1.00 | $0.95 | $1.00 | $1.00 |
| 209 | Marking removal line wide (646.9200) | LF | 159 | $1.50 | $1.50 | $3.25 | $1.50 | $3.25 | $3.25 |
| 210 | Construction staking storm sewer (650.4000) | EACH | 41 | $120.00 | $150.00 | $120.00 | $150.00 | $120.00 | $150.00 |
| 211 | Construction staking subgrade (650.4500) | LF | 100 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 212 | Construction staking base (650.5000) | LF | 100 | $4.00 | $0.01 | $4.00 | $0.01 | $4.00 | $0.01 |
| 213 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 7,075 | $3.00 | $1.25 | $3.00 | $1.25 | $3.00 | $1.25 |
| 214 | Construction staking pipe culverts (650.6000) | EACH | 3 | $150.00 | $125.00 | $150.00 | $125.00 | $150.00 | $125.00 |
| 215 | Construction staking resurfacing reference (650.8000) | LF | 46,010 | $0.20 | $0.25 | $0.20 | $0.25 | $0.20 | $0.25 |
| 216 | Construction staking electrical installations (project) 01. ID 2025- 03-73 (650.8501) | EACH | 1 | $3,840.00 | $5,000.00 | $3,840.00 | $5,000.00 | $3,840.00 | $5,000.00 |
| 217 | Construction staking curb ramps (650.9000) | EACH | 128 | $220.00 | $150.00 | $220.00 | $150.00 | $220.00 | $150.00 |
| 218 | Construction staking supplemental control (project) 01. ID 2025-03-73 (650.9911) | EACH | 1 | $3,800.00 | $10,000 | $3,800.00 | $10,000 | $3,800.00 | $10,000 |
| 219 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,405 | $8.58 | $8.58 | $8.59 | $8.59 | $8.58 | $8.58 |
| 220 | Conduit special 2-inch (652.0605) | LF | 1,563 | $17.16 | $17.16 | $17.16 | $17.16 | $17.16 | $17.16 |
| 221 | Conduit loop detector (652.0800) | LF | 16,134 | $6.96 | $6.96 | $6.96 | $6.96 | $6.96 | $6.96 |
| 222 | Pull boxes steel 24X36-inch (653.0135) | EACH | 17 | $1,235.00 | $1,235.00 | $1,235.00 | $1,235.00 | $1,235.00 | $1,235.00 |
| 223 | Pull boxes steel 24X42-inch (653.0140) | EACH | 11 | $1,288.00 | $1,288.00 | $1,288.00 | $1,288.00 | $1,288.00 | $1,288.00 |
| 224 | Adjusting pull boxes (653.0900) | EACH | 3 | $208.00 | $208.00 | $208.00 | $208.00 | $208.00 | $208.00 |
| 225 | Removing pull boxes (653.0905) | EACH | 5 | $165.00 | $165.00 | $166.00 | $166.00 | $165.00 | $165.00 |
| 226 | Concrete bases type 1 (654.0101) | EACH | 17 | $860.00 | $860.00 | $861.00 | $861.00 | $860.00 | $860.00 |
| 227 | Concrete bases type 2 (654.0102) | EACH | 3 | $1,331.00 | $1,331.00 | $1,332.00 | $1,322.00 | $1,331.00 | $1,331.00 |
| 228 | Cable traffic signal 5-14 AWG (655.0230) | LF | 611 | $1.74 | $1.74 | $1.74 | $1.74 | $1.74 | $1.74 |
| 229 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,347 | $2.06 | $2.06 | $2.06 | $2.06 | $2.06 | $2.06 |
| 230 | Cable traffic signal 12-14 AWG (655.0260) | LF | 399 | $3.30 | $3.30 | $3.30 | $3.30 | $3.30 | $3.30 |
| 231 | Cable traffic signal 15-14 AWG (655.0270) | LF | 1,037 | $4.13 | $4.13 | $4.13 | $4.13 | $4.13 | $4.13 |
| 232 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,336 | $1.16 | $1.16 | $1.16 | $1.16 | $1.16 | $1.16 |
| 233 | Loop detector lead in cable (655.0700) | LF | 63,947 | $1.66 | $1.66 | $1.66 | $1.66 | $1.66 | $1.66 |
| 234 | Loop detector wire (655.0800) | LF | 65,368 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 |
| 235 | Pedestal bases (657.0100) | EACH | 4 | $331.00 | $331.00 | $331.00 | $331.00 | $331.00 | $331.00 |
| 236 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 3 | $667.00 | $667.00 | $667.00 | $667.00 | $667.00 | $667.00 |
| 237 | Poles type 3 (657.0310) | EACH | 3 | $3,745.00 | $3,745.00 | $3,745.00 | $3,745.00 | $3,745.00 | $3,745.00 |
| 238 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $339.00 | $339.00 | $339.00 | $339.00 | $339.00 | $339.00 |
| 239 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 2 | $657.00 | $657.00 | $657.00 | $657.00 | $657.00 | $657.00 |
| 240 | Pedestrian push buttons (658.0500) | EACH | 3 | $420.00 | $420.00 | $420.00 | $420.00 | $420.00 | $420.00 |
| 241 | Signal mounting hardware (location) 01. STH 190 & brookfield RD (658.5070) | EACH | 1 | $1,675.00 | $1,675.00 | $1,676.00 | $1,676.00 | $1,675.00 | $1,675.00 |
| 242 | Signal mounting hardware (location) 02. STH 190 & imperial DR (658.5070) | EACH | 1 | $2,391.00 | $2,391.00 | $2,392.00 | $2,392.00 | $2,391.00 | $2,391.00 |
| 243 | Signal mounting hardware (location) 03. STH 190 & 128TH ST (658.5070) | EACH | 1 | $1,813.00 | $1,813.00 | $1,814.00 | $1,814.00 | $1,813.00 | $1,813.00 |
| 244 | Signal mounting hardware (location) 04. STH 190 & 124TH ST (658.5070) | EACH | 1 | $1,675.00 | $1,675.00 | $1,676.00 | $1,676.00 | $1,675.00 | $1,675.00 |
| 245 | Install camera assembly (677.0200) | EACH | 4 | $1,602.00 | $1,602.00 | $1,603.00 | $1,603.00 | $1,602.00 | $1,602.00 |
| 246 | Sawing asphalt (690.0150) | LF | 3,207 | $1.20 | $1.20 | $2.39 | $1.52 | $1.75 | $1.20 |
| 247 | Sawing concrete (690.0250) | LF | 31,062 | $2.10 | $2.10 | $3.25 | $2.47 | $2.75 | $2.10 |
| 248 | Incentive iri ride (740.0440) | DOL | 51,978 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 249 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 4,800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 250 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 11,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 251 | Special 01. grading and shaping curb ramps (SPV.0060) | EACH | 128 | $146.58 | $320.45 | $900.00 | $900.00 | $750.00 | $146.58 |
| 252 | Special 02. cleaning storm sewer structures (SPV.0060) | EACH | 228 | $300.00 | $300.00 | $500.00 | $400.00 | $200.00 | $300.00 |
| 253 | Special 03. utility line opening (ulo) (SPV.0060) | EACH | 10 | $2,105.00 | $1,603.03 | $2,000.00 | $1,500.00 | $894.64 | $600.00 |
| 254 | Special 04. field facilities office space (SPV.0060) | EACH | 1 | $30,000 | $28,180 | $60,000 | $31,500 | $20,000 | $28,000 |
| 255 | Special 05. tuckpointing storm sewer structures (SPV.0060) | EACH | 15 | $555.00 | $557.00 | $500.00 | $500.00 | $233.33 | $555.00 |
| 256 | Special 06. section corner monuments (SPV.0060) | EACH | 6 | $300.00 | $1,710.00 | $1,000.00 | $1,250.00 | $300.00 | $1,250.00 |
| 257 | Special 20. remove & salvage video detection equipment, STH 190 & brookfield RD (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 258 | Special 21. remove & salvage video detection equipment, STH 190 & imperial DR (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 259 | Special 22. remove & salvage video detection equipment, STH 190 & calhoun RD (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 260 | Special 23. remove & salvage video detection equipment, STH 190 & lilly RD (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 261 | Special 24. remove & salvage video detection equipment, STH 190 & 128TH ST (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 262 | Special 25. remove & salvage video detection equipment, STH 190 & 124TH ST (SPV.0060) | EACH | 1 | $1,496.00 | $1,496.00 | $1,497.00 | $1,497.00 | $1,496.00 | $1,496.00 |
| 263 | Special 26. removing, salvaging, & reinstalling traffic signal equip, STH 190 & brookfie (SPV.0060) | EACH | 1 | $801.00 | $801.00 | $801.00 | $801.00 | $801.00 | $801.00 |
| 264 | Special 27. removing, salvaging, & reinstalling traffic signal equip, STH 190 & imperial (SPV.0060) | EACH | 1 | $1,549.00 | $1,549.00 | $1,550.00 | $1,550.00 | $1,549.00 | $1,549.00 |
| 265 | Special 28. removing, salvaging, & reinstalling traffic signal equip, STH 190 & 128TH ST (SPV.0060) | EACH | 1 | $1,549.00 | $1,549.00 | $1,550.00 | $1,550.00 | $1,549.00 | $1,549.00 |
| 266 | Special 29. removing, salvaging, & reinstalling traffic signal equip, STH 190 & 124TH ST (SPV.0060) | EACH | 1 | $1,549.00 | $1,549.00 | $1,550.00 | $1,550.00 | $1,549.00 | $1,549.00 |
| 267 | Special 30. modify existing traffic signal during construction, STH 190 & brookfield RD (SPV.0060) | EACH | 1 | $1,575.00 | $1,575.00 | $1,576.00 | $1,576.00 | $1,575.00 | $1,575.00 |
| 268 | Special 31. modify existing traffic signal during construction, STH 190 & imperial DR (SPV.0060) | EACH | 1 | $1,575.00 | $1,575.00 | $1,576.00 | $1,576.00 | $1,575.00 | $1,575.00 |
| 269 | Special 32. modify existing traffic signal during construction, STH 190 & calhoun RD (SPV.0060) | EACH | 1 | $1,602.00 | $1,602.00 | $1,603.00 | $1,603.00 | $1,602.00 | $1,602.00 |
| 270 | Special 33. modify existing traffic signal during construction, STH 190 & lilly RD (SPV.0060) | EACH | 1 | $1,575.00 | $1,575.00 | $1,576.00 | $1,576.00 | $1,575.00 | $1,575.00 |
| 271 | Special 34. modify existing traffic signal during construction, STH 190 & 128TH ST (SPV.0060) | EACH | 1 | $2,349.00 | $2,349.00 | $2,351.00 | $2,351.00 | $2,349.00 | $2,349.00 |
| 272 | Special 35. modify existing traffic signal during construction, STH 190 & 124TH ST (SPV.0060) | EACH | 1 | $3,097.00 | $3,097.00 | $3,100.00 | $3,100.00 | $3,097.00 | $3,097.00 |
| 273 | Special 40. debris rack galvanized (SPV.0060) | EACH | 1 | $8,265.00 | $8,265.00 | $8,265.00 | $8,265.00 | $8,265.00 | $8,265.00 |
| 274 | Special 41. dewatering/bypass pumping unnamed tributary (SPV.0060) | EACH | 1 | $20,500 | $20,500 | $20,500 | $20,500 | $20,500 | $20,500 |
| 275 | Special 42. sealing concrete pipe joints (SPV.0060) | EACH | 5 | $790.00 | $8,500.00 | $3,000.00 | $3,850.00 | $4,000.00 | $790.00 |
| 276 | Special 43. tuckpointing junction chamber (SPV.0060) | EACH | 1 | $980.00 | $26,000 | $7,500.00 | $3,000.00 | $12,500 | $980.00 |
| 277 | Special 50. adjust sanitary sewer manhole (SPV.0060) | EACH | 12 | $680.00 | $1,710.00 | $1,200.00 | $900.00 | $600.00 | $1,480.00 |
| 278 | Special 51. sanitary manhole seal (SPV.0060) | EACH | 12 | $760.00 | $888.00 | $800.00 | $650.00 | $558.33 | $760.00 |
| 279 | Special 52. adjust water valve box (SPV.0060) | EACH | 30 | $325.00 | $445.00 | $850.00 | $300.00 | $441.67 | $325.00 |
| 280 | Special 01. concrete joint and crack cleaning and repair (SPV.0090) | LF | 1,002 | $15.00 | $15.00 | $15.00 | $22.00 | $15.00 | $45.87 |
| 281 | Special 02. ditching and shaping (SPV.0090) | LF | 1,323 | $10.00 | $25.04 | $45.00 | $67.00 | $23.50 | $10.00 |
| 282 | Special 03. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 18 | $70.00 | $53.85 | $60.00 | $140.00 | $75.00 | $70.00 |
| 283 | Special 01. excavation, hauling, and disposal of pah and arsenic contaminated soil (SPV.0195) | TON | 74 | $150.00 | $117.57 | $300.00 | $114.00 | $100.00 | $63.08 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.