Everett Link Extension
- Location
- Everett, WA, United States. Location shown at city level. See it on the map
- Stage
- Planning, as of November 2026 (Sound Transit).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Sound Transit | |
| Category | Urban transit | |
| Route length | 16 mi | Sound Transit |
| New stations | 6 | Sound Transit |
| Amount | US$6.538 billion (US dollars), as of September 2025 | Sound Transit |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$6.54 bn | Capital estimate | Whole project | Sep 2025 | Sound Transit |
| US$6.8 bn | Capital estimate, approx. | Whole project | Sep 2025 | Sound Transit |
| US$7.7 bn | Capital estimate, approx. | Whole project | Sep 2025 | Sound Transit |
| US$9.9 bn | Capital estimate, approx. | Whole project | Sep 2025 | Sound Transit |
| US$11.2 bn | Capital estimate, approx. | Whole project | Sep 2025 | Sound Transit |
Contracts and teams
Contracts and teams: No construction contract awarded yet Sound Transit.
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| September 18, 2026 | environmental | Whole project | Sound Transit |
| 2037 | planned opening | Whole project | Sound Transit |
| 2041 | planned opening | Whole project | Sound Transit |
About the project
A 16-mile light rail extension from Lynnwood to Everett Station with six funded stations and one provisional station. Sound Transit's September 2025 cost memo put the updated estimate at $6.8 to $7.7 billion in 2025 dollars ($9.9 to $11.2 billion year of expenditure) against a finance-plan value of $6,538 million, at the conceptual engineering stage. The Draft EIS was published on September 18, 2026; the Board expects to confirm a preferred alternative in early 2027, with opening in two phases between 2037 and 2041.
Sources
- Memo: Updated ST3 Capital Project Cost Estimates (to the System Expansion Committee), Sound Transit, 11 Sep 2025. Table on page 2: Everett Link Extension $6,538 / $6,800-$7,700 (2025$ millions); $9,169 / $9,900-$11,200 (YOE$ millions); conceptual engineering. Consulted 12 Nov 2026.
- Everett Link Extension project page, Sound Transit. Page: 16 miles, six funded plus one provisional station, Draft EIS September 18, 2026, opening 2037-2041. Consulted 12 Nov 2026.