Lane Construction Corporation (the) submitted 14 bids on Florida DOT contracts in the data, from 28 FEB 2018 to 14 AUG 2024, and was the low bidder on 3 of them (21%). When it was not low, its total sat a median +8.0% above the low bid.
- Owner
- Florida DOT
- Low bid volume
- $277,583,268
- Latest bid
- 14 AUG 2024
- Data through
- 28 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 11 | 1 | 9% |
| 2021 | 2 | 1 | 50% |
| 2024 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 7 | 7 | 1 | 14% |
| District 1 | 3 | 1 | 33% |
| District 2 | 2 | 0 | 0% |
| District 5 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Conduit, furnish & install, aboveground | 0630-2-14 | LF | 14 | 9 (64%) | $16.73 | $36.00 |
| Conduit, furnish & install, open trench | 0630-2-11 | LF | 24 | 7 (29%) | $7.71 | $16.54 |
| Disputes review board, meeting- DO not bid | 0999-20-1 | DA | 7 | 7 (100%) | $3,300.00 | $3,900.00 |
| Disputes review board, hearing- DO not bid | 0999-20-2 | EACH | 7 | 7 (100%) | $4,000.00 | $4,500.00 |
| Conduit, furnish & install, directional bore | 0630-2-12 | LF | 23 | 6 (26%) | $24.00 | $30.82 |
| Work zone sign | 0102-60 | ED | 12 | 5 (42%) | $0.22 | $0.25 |
| Fiber optic connection, install, splice | 0633-2-31 | EACH | 10 | 5 (50%) | $39.05 | $52.75 |
| Type B stabilization | 0160-4 | SY | 9 | 5 (56%) | $5.50 | $15.00 |
| Channelizing device- types I, II, VP, drum, or LCD | 0102-74-1 | ED | 12 | 4 (33%) | $0.12 | $0.13 |
| Removal of existing concrete | 0110-4-10 | SY | 12 | 4 (33%) | $23.59 | $33.96 |
| Thermoplastic, standard, arrow | 0711-11170 | EACH | 12 | 4 (33%) | $58.98 | $80.00 |
| Pull & splice box, F&I, 24" X 36" cover size | 0635-2-12 | EACH | 12 | 4 (33%) | $1,245.38 | $2,231.27 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hubbard Construction Company | 8 | 4 of 8 |
| Ajax Paving Industries of Florida LLC | 8 | 4 of 8 |
| Preferred Materials Inc. | 8 | 4 of 8 |
| Prince Contracting, LLC. | 6 | 1 of 6 |
| Superior Construction Company Southeast, LLC | 4 | 2 of 4 |
| Sacyr Construccion Sa | 3 | 3 of 3 |
| Vecellio & Grogan, Inc. | 3 | 1 of 3 |
| Johnson Bros. Corporation, A Southland Company | 3 | 1 of 3 |
| Coastal Bridge Company, L.L.C. | 3 | 1 of 3 |
| Anderson Columbia Co., Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 AUG 2024 | T1899 | District 1 | SR 400 (I-4) AND SR 33 AT SR 33 AND FROM OLD COMBEE RD TO... | 1 of 4 | $189,420,553 | Low, 4.0% under the second |
| 25 AUG 2021 | T5735 | District 5 | NASA CAUSEWAY | 3 of 9 | $143,143,878 | +15% |
| 26 MAY 2021 | T7472 | District 7 | SR 93 (I-275) | 1 of 6 | $85,239,705 | Low, 2.0% under the second |
| 05 DEC 2018 | T2724 | District 2 | SR 23 (FIRST COAST EXPRESSWAY) | 5 of 8 | $196,134,052 | +9.0% |
| 31 OCT 2018 | T2717 | District 2 | SR 23 (FIRST COAST EXPRESSWAY) | 5 of 6 | $269,388,050 | +17% |
| 31 OCT 2018 | T5635 | District 5 | SR 527/SR 426/ORANGE AVE | 1 of 5 | $2,923,010 | Low, 6.0% under the second |
| 29 AUG 2018 | T7418 | District 7 | SR 586 (CURLEW RD) | 2 of 5 | $950,862 | +2.0% |
| 13 JUN 2018 | T1706 | District 1 | SR 35 AND SR 64 | 2 of 4 | $8,437,308 | +8.0% |
| 13 JUN 2018 | T7413 | District 7 | SR 400 (I-4) | 3 of 4 | $27,939,446 | +4.0% |
| 23 MAY 2018 | T1709 | District 1 | SR 93 (I-75) | 2 of 4 | $85,113,995 | +5.0% |
| 25 APR 2018 | T7398 | District 7 | SR 685 (USB 41) | 2 of 4 | $3,079,756 | +3.0% |
| 28 MAR 2018 | T7401 | District 7 | SR 693 (S PASADENA AVE) | 5 of 5 | $3,135,305 | +7.0% |
| 28 MAR 2018 | T7405 | District 7 | SR 52 | 5 of 7 | $2,547,144 | +14% |
| 28 FEB 2018 | T7404 | District 7 | SR 600 (SR 39)(US 92) | 4 of 7 | $1,204,590 | +11% |
How this record was read
FDOT Tabulation of Bids PDFs from its central office lettings, January 2018 to October 2026, all pay items. On A+B contracts the cost part is kept (the total the pay items add up to). Bidders listed without a rank or total are left out.
- Every bid counted here matched its published total to within one dollar; FDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.