IDOT contract 93773 bid tabulation

Springfield, section 20-00492-00-BR. Let by Illinois DOT on January 17, 2025, Sangamon, District 06. 2 bids received; low bid $99,697,564 by Freesen, a div of UCM, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
372
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Freesen, a div of UCM, Inc.$99,697,564Low
2William Charles Construction Company, LLC$102,600,000+3.0%
IDOT contract 93773: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Freesen, a div of UCM, Inc.2. William Charles Construction Company, LLC
1T-cercis can (E R) 8' (B2001167)EACH20$1,302.00$1,240.00
2T-syring ret CL 8' (B2006270)EACH15$1,302.00$1,240.00
3Ornament metal fence (XX004101)LF38,791$115.50$140.00
4Fence (special) (XX006653)LF2,242$134.40$175.00
5Gate special (XX008811)EACH20$5,300.40$5,750.00
6F&E struct steel BR 1 (XX008948)LS1$2,116,876$3,900,000
7F&E struct steel BR 2 (XX008949)LS1$4,771,906$5,900,000
8Lum dec light tape (XX008952)LF160$166.95$472.70
9PP conc fascia beam 1 (XX009193)LS1$657,029$500,000
10Sewer metal liner 12 (XX009197)LF106$1,077.30$1,026.00
11Sewer metal liner 54 (XX009426)LF115$2,867.55$2,731.00
12Sunshelter (XX009460)EACH1$43,360$40,000
13Sewer metal liner 24 (XX009505)LF315$1,370.25$1,305.00
14Gate SPL 3 (16 DSG) (XX009672)EACH18$4,284.00$8,137.75
15Gate SPL 6 (16 DSG) (XX009673)EACH18$5,967.15$8,795.18
16Gate SPL 6 (24 DSG) (XX009674)EACH4$9,194.85$10,695
17Prec conc RR crossing (XX009675)LF680$548.10$525.00
18Railroad TRK conc SPL (XX009676)TRK FT3,947$180.60$170.00
19Railroad tie concrete (XX009677)EACH328$159.60$165.00
20RR turnout #11 SPL (XX009678)EACH1$228,215$250,000
21Railroad turnout #24 (XX009679)EACH2$417,286$400,000
22RR turnout #24 SPL (XX009680)EACH4$391,039$400,000
23RR crossing diamond (XX009681)EACH2$480,547$475,000
24Railroad derail SPL (XX009682)EACH2$53,144$50,000
25Railroad signals (XX009683)LS1$2,576,848$2,000,000
26San sewer eqrs 18 (XX009684)LF50$394.80$376.00
27Sewer metal liner 15 (XX009685)LF112$1,276.80$1,216.00
28Sewer metal liner 18 (XX009686)LF111$1,294.65$1,233.00
29Ornamental fence SPL (XX009687)LF2,854$87.15$120.36
30Rem EX parking blocks (X0301339)EACH42$82.34$60.00
31Prec conc park block (X0301430)EACH20$247.48$275.00
32Cros sonic log A duct (X0320051)LF502$81.79$150.00
33Bollard quick release (X0322135)EACH6$2,205.00$1,200.00
34TV inspect of sewer (X0325207)LF75$39.90$38.00
35Railroad track (X0325346)TRK FT40,435$338.10$325.00
36Directional boring (X0325379)LF82$3,001.82$1,800.00
37Conc surf color TRMNT (X0326671)SF3,301$14.49$11.80
38Transverse drains com (X0326911)EACH6$3,150.00$1,750.00
39Bollard removal (X0350810)EACH8$845.62$350.00
40P.S. electrical work (X0783300)LS1$64,575$35,000
41P.S. mechanical work (X0783500)LS1$113,753$110,000
42Luminaire LED special (X1400238)EACH59$2,520.00$956.39
43Delineator (special) (X2200005)EACH207$201.75$80.00
44Maintenance mowing (X2503000)ACRE152.25$337.99$110.00
45Minor sign complete (X2600016)EACH65$147.00$200.00
46PC conc sidewalk 4 SP (X4240420)SF1,894$18.83$20.00
47Pavt removal SPL (X4404400)SY20,631$19.15$23.00
48Pavt replace special (X4420207)SY1,269$394.14$300.00
49Concrete slab removal (X5012504)SY3,086$17.40$20.00
50Agg column GRND imprv (X5020100)LS1$1,743,774$1,769,412
51HLMRB disc fixed 800K (X5211440)EACH4$13,229$14,000
52HLMRB disc N-G exp 400K (X5211520)EACH2$12,990$15,000
53HLMRB disc G exp 200K (X5211610)EACH8$8,496.74$8,000.00
54HLMRB disc G exp 300K (X5211615)EACH6$12,809$12,500
55HLMRB disc G exp 900K (X5211645)EACH4$18,496$20,000
56Drain structures N1 (X5230301)EACH2$345,138$375,000
57Drain structures N2 (X5230302)EACH1$335,227$400,000
58Cur-in-PL pipe LNR 18 (X5430218)LF150$210.00$350.00
59Storm sew connection (X5510010)EACH2$45,650$16,000
60Water main removal (X5610700)LF1,676$15.34$25.00
61Sanitary sewer conn (X5630212)EACH2$37,046$36,000
62Membrane waterprf SPL (X5800110)SF3,439$32.39$30.00
63Pipe drains 18 SPL (X6012108)LF482$183.75$900.00
64Pipe drains 24 SPL (X6012114)LF64$236.25$750.00
65Man TA 10 dia T8G (X6022111)EACH1$36,225$40,000
66Inlets TA W/SPL F&G (X6023508)EACH5$1,942.50$3,000.00
67VV removed (X6026622)EACH2$1,526.90$500.00
68Fill EX storm sewers (X6050205)CY860$450.63$593.00
69Fence removal (X6640104)LF37,144$6.83$10.00
70Temp CH LK fence port (X6640210)LF756$20.48$19.42
71CH LK gates SPL (X6640308)EACH1$2,520.00$6,106.45
72CH LK gate assmbly SP (X6640500)EACH1$2,520.00$20,776
73CH LK fence 6 SPL (X6640560)LF959$37.80$39.01
74CH LK fence 8 SPL (X6640570)LF130$39.90$83.56
75Ornamental fence (X6640618)LF143$152.25$465.00
76Traf cont & prot SPL (X7010216)LS1$54,937$50,000
77Sign removal (X7240300)EACH5$1,056.08$786.00
78Elect serv install SP (X8040102)EACH11$120,015$88,418
79Handhole SPL (X8140105)EACH2$2,331.00$5,041.55
80Handhole C conc SPL (X8140230)EACH8$2,520.00$4,441.52
81Light controller SPL (X8250505)EACH2$26,460$17,214
82Fac in exist cab (X8570215)EACH4$6,930.00$7,877.13
83Accessible ped signal (X8760200)EACH12$2,299.50$919.55
84Ped pushbutton post (X8760201)EACH4$2,835.00$1,493.23
85Ballast (Z0002400)TON7,853$68.25$67.00
86Bollards (Z0004002)EACH12$971.25$900.00
87Steel railing SPL (Z0007124)LF2,761$513.56$325.00
88Construction layout (Z0013798)LS1$610,085$650,000
89Detour signing (Z0016702)LS1$63,834$34,000
90Drainage scuppr DS-11 (Z0018002)EACH6$2,807.03$4,000.00
91Communications vault (Z0033052)EACH21$10,500$7,950.26
92Modular expan JT 6 (Z0034390)LF130$2,483.68$3,500.00
93Pumping station (Z0047700)LS1$779,496$1,000,000
94Railroad crossing rem (Z0048400)EACH1$8,839.95$10,000
95RR prot liability ins (Z0048665)LS1$202,923$150,000
96Railroad ties (Z0048700)EACH135$94.50$100.00
97San sew 6 (Z0056800)LF200$177.45$169.00
98San sew 8 (Z0056900)LF548$248.85$237.00
99San sew 12 (Z0057100)LF992$291.90$278.00
100San sew 15 (Z0057200)LF128$337.05$321.00
101San sew 18 (Z0057300)LF167$378.00$360.00
102San sew 24 (Z0057500)LF1,057$464.10$442.00
103San sew 30 (Z0057700)LF53$670.95$639.00
104San sew 54 (Z0057962)LF56$3,350.55$3,191.00
105Sub-ballast (Z0069700)CY24,461$99.56$80.00
106Temp TR signal timing (Z0073510)EACH4$4,410.00$2,711.73
107Track removal (Z0076100)LF4,688$38.85$40.00
108Trainees (Z0076600)HR5,000$0.80$0.80
109Trainees TPG (Z0076604)HR5,000$15.00$15.00
110Tree remov acres (20100500)ACRE35.75$4,095.00$5,500.00
111Temporary fence (20101000)LF620$39.90$45.00
112Earth excavation (20200100)CY60,770$25.84$30.00
113Rem & disp uns matl (20201200)CY1,253$47.66$52.00
114Furnished excavation (20400800)CY64,590$28.84$50.00
115Porous gran embank (20700220)CY79$135.60$175.00
116Trench backfill (20800150)CY4,518$88.96$90.00
117Geotech fab F/GR stab (21001000)SY9,312$2.54$2.50
118Seeding CL 1A (25000110)ACRE21.50$3,906.00$3,720.00
119Nitrogen fert nutr (25000400)LB1,905$3.15$3.00
120Phosphorus fert nutr (25000500)LB1,905$2.10$3.00
121Potassium fert nutr (25000600)LB1,905$3.15$3.00
122Agr ground limestone (25000700)TON42.40$52.50$50.00
123Mulch method 2 (25100115)ACRE7.75$2,625.00$2,500.00
124Mulch method 3 (25100125)ACRE13.75$3,675.00$3,200.00
125Erosion contr blanket (25100630)SY1,812$2.10$2.00
126HD eros contr blanket (25100635)SY18,756$2.10$2.00
127Temp eros contr seed (28000250)LB1,100$7.17$6.00
128Temp ditch checks (28000305)LF1,510$21.31$35.00
129Perimeter eros bar (28000400)LF24,816$8.41$7.00
130Inlet & pipe protect (28000500)EACH207$352.64$300.00
131Temp HD eros contr BL (28001200)SY2,322$2.10$2.00
132Agg subgrade improve (30300001)CY8,591$120.97$80.00
133Stab subbase 4 (31200100)SY5,482$38.41$35.00
134Agg base cse A 8 (35100700)SY8,315$36.36$20.25
135Agg surf cse B (40200900)CY8$396.09$250.00
136Aggregate-temp access (40201000)TON1,012$72.35$50.00
137Bit matls PR CT (40600275)LB50,365$0.98$2.31
138Bit matls tack CT (40600290)LB10,022$2.18$2.29
139Long joint sealant (40600370)LF5,176$13.07$8.00
140Matl transfer device (40600405)TON2,180$11.74$21.66
141HMA BC IL-19.0 N50 (40603080)TON1,015$217.52$185.65
142HMA SC IL-9.5 C N50 (40604050)TON622$278.47$191.62
143P HMA SC IL-9.5 C N50 (40604150)TON470$381.26$196.85
144HMA pavt FD 6 (40701801)SY301$129.54$85.92
145HMA pavt FD 7 (40701821)SY1,057$121.94$93.57
146HMA pavt FD 9 (40701861)SY2,284$119.38$120.35
147HMA pavt FD 10 (40701881)SY280$354.83$137.02
148HMA pavt FD 11 1/2 (40701911)SY10,378$131.15$144.24
149PVT con PCC BR app SL (42000080)SY349$401.68$285.00
150PCC PVT 8 (42000300)SY535$101.83$100.00
151PCC PVT 8 jointed (42000301)SY6,635$117.95$110.00
152Protective coat (42001300)SY7,824$0.01$2.00
153PCC driveway pavt 6 (42300200)SY445$96.53$125.00
154PCC driveway pavt 8 (42300400)SY1,776$119.68$125.00
155PC conc sidewalk 4 (42400100)SF38,141$13.15$15.00
156Detectable warnings (42400800)SF594$59.02$40.00
157Pavement rem (44000100)SY10,549$22.52$20.00
158HMA surf rem 1/2 (44000151)SY2,635$6.60$8.25
159HMA surf rem 1 1/2 (44000155)SY2,829$19.48$8.66
160HMA surf rem 2 (44000157)SY178$21.78$26.85
161Drive pavement rem (44000200)SY20,721$9.10$20.00
162Curb rem (44000300)LF1,659$11.57$12.25
163Comb curb gutter rem (44000500)LF3,565$15.98$12.25
164Sidewalk rem (44000600)SF45,221$2.62$1.25
165Conc barrier remov (44001980)LF312$24.72$20.00
166Pipe culvert remov (50105220)LF328$55.65$30.00
167Structure excavation (50200100)CY4,010$38.05$50.00
168Rock exc struct (50200400)CY22$179.56$200.00
169Conc struct (50300225)CY1,701.30$1,342.02$1,200.00
170Conc sup-STR (50300255)CY970.60$2,384.25$1,800.00
171BR deck grooving (50300260)SY2,390$10.57$8.50
172Seal coat conc (50300265)CY15$454.87$700.00
173Form liner tex surf (50300285)SF7,560$16.91$50.00
174Protective coat (50300300)SY2,887$4.43$3.25
175Conc supstr app slab (50301350)CY181.90$950.25$900.00
176Stud shear connectors (50500505)EACH12,661$5.00$7.25
177Reinforcement bars (50800105)LB51,470$1.93$2.00
178Reinf bars, epoxy CTD (50800205)LB629,660$1.66$2.25
179Bar splicers (50800515)EACH227$51.52$70.00
180Bicycle railing, curved (50901735)LF317$370.76$425.00
181Parapet railing (50901750)LF705$158.66$210.00
182Fur STL pile HP14X73 (51201800)LF1,247$113.44$65.00
183Fur STL pile HP14X89 (51201900)LF1,081$96.28$70.00
184Fur STL pile HP14X117 (51202100)LF570$120.89$70.00
185Driving piles (51202305)LF2,898$0.01$60.00
186Test pile ST HP14X73 (51203800)EACH1$14,798$9,000.00
187Test pile ST HP14X89 (51203900)EACH1$18,599$10,000
188Test pile ST HP14X117 (51204100)EACH1$21,251$12,500
189Name plates (51500100)EACH2$677.38$1,250.00
190Drilled shaft in soil (51603000)CY178$1,644.34$1,500.00
191Drilled shaft in rock (51604000)CY74.40$3,413.21$3,250.00
192Pref JT strip seal (52000110)LF64$345.47$400.00
193Anchor bolts 1 (52100520)EACH40$238.49$250.00
194Anchor bolts 1 1/2 (52100540)EACH40$336.77$250.00
195Anchor bolts 2 (52100560)EACH16$494.81$300.00
196Temp soil reten systm (52200020)SF781$65.26$150.00
197Fur soldier piles WS (52200105)LF3,228$194.89$200.00
198Drill set SLD PI soil (52200200)CF23,733.80$19.15$20.00
199Drill set SLD PI rock (52200205)CF8,098.40$72.72$70.00
200Untreated timber lag (52200250)SF9,839$14.08$22.00
201Secant lag (52200265)CF2,147$25.08$26.00
202Mech ST earth ret WL (52200500)SF41,892$153.31$150.00
203Conc STR retain wall (52200900)CY282$2,763.63$2,500.00
204Drainage system for structures (52318802)LS1$112,238$60,000
205PRC flar end sec 12 (54213657)EACH8$1,296.75$2,000.00
206PRC flar end sec 15 (54213660)EACH1$1,522.50$2,300.00
207PRC flar end sec 18 (54213663)EACH12$2,356.55$3,500.00
208PRC flar end sec 24 (54213669)EACH8$2,100.00$3,300.00
209PRC flar end sec 36 (54213681)EACH4$3,150.00$4,000.00
210PRC FL end S EQ RS 18 (54214503)EACH1$5,827.50$3,650.00
211PRC FL end S EQ RS 24 (54214509)EACH4$2,572.50$3,500.00
212Storm sew CL A 1 10 (550A0040)LF28$84.53$115.00
213Storm sew CL A 1 12 (550A0050)LF3,834$73.50$80.00
214Storm sew CL A 1 15 (550A0070)LF1,658$80.33$90.00
215Storm sew CL A 1 18 (550A0090)LF1,064$92.66$100.00
216Storm sew CL A 1 24 (550A0120)LF600$123.38$170.00
217Storm sew CL A 1 36 (550A0160)LF541$212.10$200.00
218Storm sew CL A 1 48 (550A0190)LF1,692$252.00$275.00
219SS CL A 1 eqrs 24 (550A4100)LF1,398$189.26$275.00
220Storm sewer rem 15 (55100700)LF2,401$37.38$45.00
221Storm sewer rem 27 (55101300)LF940$64.04$75.00
222Storm sewer rem 54 (55102000)LF50$152.25$200.00
223Storm sewers JKD 18 (55200600)LF41$2,462.70$2,800.00
224Water main 10 (56100800)LF460$184.80$176.00
225Adj san sewer 8 less (56300100)LF150$427.35$407.00
226Granular backfill STR (58600101)CY190$138.30$150.00
227Concrete sealer (58700300)SF29,643$1.61$1.50
228Geocomposite wall DR (59100100)SY645$34.02$60.00
229Contr low-streng matl (59300100)CY40$404.25$550.00
230Pipe underdr T 1 4 (60108104)LF1,370$16.28$50.00
231Pipe underdr T 2 8 (60108208)LF539$87.15$50.00
232Pipe underdr T 2 12 (60108212)LF2,610$69.30$60.00
233Pipe underdr T 2 15 (60108215)LF370$72.45$80.00
234P undr for struct 4 (60146304)LF2,115$59.30$45.00
235P undr for struct 6 (60146306)LF102$113.93$65.00
236P undr for struct SPL 6 (60146307)LF37$92.55$95.00
237Man TA 4 dia T1F CL (60218400)EACH33$12,397$11,000
238Man TA 4 dia T3F&G (60218500)EACH13$10,477$9,500.00
239Man TA 4 dia T8G (60219000)EACH10$9,133.11$8,000.00
240Man TA 4 dia T10F&G (60219200)EACH2$7,946.24$5,800.00
241Man TA 4 dia T3V F&G (60219570)EACH1$6,930.00$5,800.00
242Man TA 5 dia T1F CL (60221100)EACH9$29,282$28,000
243Man TA 5 dia T3F&G (60221200)EACH4$8,400.00$7,000.00
244Man TA 5 dia T8G (60221700)EACH3$17,959$17,000
245Man TA 5 dia T3V F&G (60222270)EACH4$8,400.00$7,500.00
246Man TA 6 dia T1F CL (60223800)EACH3$9,660.00$10,000
247Man TA 6 dia T3F&G (60223810)EACH1$9,922.50$10,000
248Man TA 6 dia T8G (60224005)EACH1$9,450.00$10,000
249Man TA 7 dia T1F CL (60224446)EACH2$74,507$54,559
250Man TA 7 dia T3F&G (60224447)EACH1$17,483$17,500
251Man TA 9 dia T8G (60224468)EACH4$19,110$5,000.00
252Man TA 9 dia T1F CL (60224469)EACH4$21,263$5,000.00
253Man TA 9 dia T3V F&G (60224490)EACH1$21,525$11,000
254Inlets TA T3F&G (60235700)EACH19$3,867.65$3,800.00
255Inlets TA T3V F&G (60235705)EACH24$2,100.00$2,500.00
256Inlets TA T4F&G (60235800)EACH2$3,753.75$3,850.00
257Inlets TA T8G (60236200)EACH21$2,276.90$2,500.00
258Inlets TA T10F&G (60236700)EACH2$2,152.50$2,500.00
259Inlets TA T20F&G (60237420)EACH5$2,073.75$2,500.00
260Inlets TA T24F&G (60237470)EACH2$1,942.50$2,500.00
261Inlets TB T3F&G (60240220)EACH28$4,239.60$4,500.00
262Inlets TB T3V F&G (60240222)EACH4$3,097.50$3,500.00
263Inlets TB T8G (60240301)EACH4$2,677.50$3,200.00
264Inlets TB T23F&G (60240327)EACH3$2,913.75$3,500.00
265Man adjust (60255500)EACH8$1,811.25$1,500.00
266Man adj new T8G (60256400)EACH1$1,995.00$3,000.00
267Man reconst (60257900)EACH3$24,483$25,000
268Inlets adjust (60260100)EACH2$1,706.25$2,200.00
269Inlets adj new T8G (60261000)EACH1$1,995.00$2,500.00
270Remov manholes (60500040)EACH8$2,021.25$2,500.00
271Remov inlets (60500060)EACH49$919.07$750.00
272Fill manholes (60500105)EACH2$4,974.38$3,200.00
273CB fill to main flow (60500705)EACH2$1,863.75$5,000.00
274Conc curb TB (60600605)LF264$108.97$60.00
275Concrete gutter TY B (60602800)LF460$86.94$45.00
276Comb CC&G TB6.12 (60603800)LF532$62.43$70.00
277Comb CC&G TB6.18 (60604400)LF8,210$79.80$49.00
278Comb CC&G TB9.18 (60606800)LF1,175$97.68$40.00
279Conc median surf 4 (60618300)SF2,127$11.52$12.00
280Conc med TSB9.06 (60620400)SF2,352$44.41$30.00
281SPBGR TY A 6FT posts (63000001)LF287.50$231.37$52.44
282Traf bar term T6 (63100085)EACH1$7,985.25$4,006.44
283TR bar TRM T1 SPL tan (63100167)EACH1$6,515.25$5,000.00
284Guardrail remov (63200310)LF103$29.85$25.00
285CH LK gate 4X6 singl (66400905)EACH1$1,575.00$2,404.23
286CH LK gates 6X24 DBL (66408200)EACH1$2,520.00$7,779.55
287Non SPL waste disposl (66900200)CY24,640$111.79$65.00
288Soil disposal analy (66900530)EACH12$1,417.50$1,350.00
289Backfill plugs (66901000)CY30$222.08$500.00
290Reg sub P-const plan (66901001)LS1$2,310.00$2,200.00
291Reg sub F con report (66901003)LS1$2,310.00$2,200.00
292Reg sub mon (66901006)CAL DAY148$987.00$940.00
293Engr field office A (67000400)CAL MO36$4,102.15$3,000.00
294Mobilization (67100100)LS1$4,053,850$6,180,000
295Traf cont-prot 701326 (70100500)LS1$1,522.50$15,000
296TR cont & prot 701501 (70102620)LS1$31,075$50,000
297TR cont & prot 701606 (70102625)LS1$13,502$25,000
298TR cont & prot 701601 (70102630)LS1$5,775.00$20,000
299TR cont & prot 701701 (70102635)LS1$20,691$30,000
300TR cont & prot 701801 (70102640)LS1$13,292$25,000
301TR cont surveillance (70103815)CAL DAY1,205$0.01$0.01
302Changeable message SN (70107025)CAL DAY730$42.00$40.00
303Temp PVT MK LTR & sym MU (70303100)SF291$6.30$6.00
304Temp PVT MK L4 MU (70303120)LF13,738$0.95$0.90
305Temp PVT MK L24 MU (70303210)LF98$6.30$6.00
306Temp conc barrier (70400100)LF1,350$33.50$70.00
307Sign panel T1 (72000100)SF864$29.40$29.00
308Sign panel T2 (72000200)SF200$21.00$36.00
309Remov sin pan assy TA (72400100)EACH46$138.93$101.00
310Reloc sin pan assy TA (72400500)EACH24$131.25$300.00
311Terminal marker - DA (72501000)EACH1$63.00$53.68
312Metal post TY B (72900200)LF1,815$25.20$17.00
313Mod ureth PM LTR-sym (78009000)SF964$8.40$8.00
314Mod ureth PM line 4 (78009004)LF5,560$1.26$1.20
315Mod ureth PM line 5 (78009005)LF11,852$1.58$1.50
316Mod ureth PM line 6 (78009006)LF4,705$2.10$2.00
317Mod ureth PM line 8 (78009008)LF101$3.15$3.00
318Mod ureth PM line 12 (78009012)LF302$4.20$4.00
319Mod ureth PM line 24 (78009024)LF462$8.40$8.00
320Barr wall ref type C (78200011)EACH109$32.04$12.00
321PVT MKG rem WTR blast (78300202)SF7,751$2.63$2.50
322Elect serv install (80400100)EACH2$25,200$15,983
323Undrgrd C PVC 1 (81028320)LF6,975$19.72$25.79
324Undrgrd C PVC 1 1/2 (81028340)LF563$34.34$29.66
325Undrgrd C PVC 2 (81028350)LF1,435$48.76$32.46
326Undrgrd C PVC 3 (81028370)LF49$50.02$56.25
327Undrgrd C PVC 4 (81028390)LF319$51.35$70.75
328Undrgrd C CNC 4 (81028790)LF40,782$139.13$127.18
329Con at ST 1 PVC GS (81100320)LF120$102.06$102.45
330Con at ST 1.5 PVC GS (81100510)LF75$103.95$111.36
331Con emb STR 1 PVC (81200210)LF199$79.57$18.52
332Con emb STR 2 PVC (81200230)LF2,420$56.64$29.92
333Jun BX SS as 4X4X3 (81300100)EACH11$2,520.00$1,132.83
334Handhole (81400100)EACH7$3,654.00$3,088.18
335HD handhole (81400200)EACH29$7,875.00$8,464.82
336UD 4#2#8GXLPUSE 2 (81603098)LF15$87.57$85.61
337EC C XLP use 1C 10 (81702110)LF512$8.38$1.87
338EC C XLP use 3-1C 10 (81702450)LF7,654$6.30$2.75
339Lum LED UP WM C (82110020)EACH6$5,796.00$4,507.61
340Lum LED UP sus B (82110033)EACH4$3,276.00$5,254.92
341LT P A 30MH 10DA (83000400)EACH51$6,426.00$4,555.40
342LT P A 30MH 10DA twin (83000410)EACH1$7,119.00$5,597.54
343Light pole FDN 24D (83600200)LF255$693.00$297.97
344Light pole FDN 30D (83600300)LF6$705.60$342.57
345Bkwy dev cou SS SCRN (83800650)EACH208$378.00$206.44
346Fac T4 cab (85700200)EACH1$32,130$27,368
347Uninter power sup STD (86200200)EACH2$11,340$9,892.05
348FO cab C 62.5/125 8F (87100120)LF3,582$4.50$6.00
349Elcbl C signal 14 5C (87301245)LF4,590$5.20$3.11
350Elcbl C signal 14 7C (87301255)LF135$5.39$3.60
351Elcbl C egrdc 6 1C (87301900)LF975$5.51$2.62
352TS post galvs 10 (87502440)EACH1$4,725.00$3,370.23
353TS post galvs 15 (87502490)EACH3$4,347.00$3,031.27
354TS post galvs 17 (87502510)EACH1$4,977.00$3,596.21
355S maa & P 34 (87700210)EACH1$20,979$18,313
356STL comb maa&P 28 (87702870)EACH1$26,712$23,454
357STL comb maa&P 34 (87702900)EACH1$29,163$25,651
358STL comb maa&P 46 (87702960)EACH1$31,941$28,143
359Conc FDN TY A (87800100)LF15$626.85$472.95
360Conc FDN TY D (87800200)LF6$1,417.50$1,751.50
361Conc FDN TY E 30D (87800400)LF25$1,165.50$355.54
362Conc FDN TY E 36D (87800415)LF24$1,197.00$420.12
363Drill EX foundation (87900100)EACH2$630.00$705.14
364Drill EX handhole (87900200)EACH18$1,386.00$411.23
365SH P LED 1F 3S BM (88040070)EACH5$1,827.00$1,236.55
366SH P LED 1F 3S mam (88040090)EACH10$1,890.00$1,138.95
367SH P LED 1F 5S BM (88040150)EACH1$2,205.00$1,541.62
368Ped SH LED 1F BM CDT (88102717)EACH8$1,789.20$1,183.44
369TS backplate ret-refl (88200510)EACH17$409.50$235.62
370Reloc EX TS equip (89501250)EACH1$15,750$5,879.90
371Remov EX TS equip (89502375)EACH2$1,260.00$14,502
372Remov EX conc FDN (89502385)EACH3$1,260.00$800.00
IDOT contract 93773: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy