INDOT contract B-43941-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on November 13, 2025, Shelby, Greenfield. 8 bids received; low bid $3,089,675 by His Constructors Inc.
- Owner
- Indiana DOT
- Letting
- 13 NOV 2025
- Pay items
- 135
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | His Constructors Inc | $3,089,675 | Low |
| 2 | Beaty Construction Inc | $3,513,759 | +14% |
| 3 | Rieth-Riley Construction Co., Inc. | $3,667,402 | +19% |
| 4 | E & B Paving LLC | $3,742,000 | +21% |
| 5 | Milestone Contractors LP | $3,830,000 | +24% |
| 6 | Superior Construction Co Inc | $3,932,542 | +27% |
| 7 | Force Construction Co Inc | $4,281,541 | +39% |
| 8 | Pontem Contractors Inc | $4,322,860 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. His Constructors Inc | 2. Beaty Construction Inc | 3. Rieth-Riley Construction Co., Inc. | 4. E & B Paving LLC | 5. Milestone Contractors LP | 6. Superior Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $25,000 | $13,800 | $13,800 | $50,000 | $30,000 | $50,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $154,614 | $183,695 | $183,370 | $187,000 | $202,000 | $195,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $30,923 | $36,830 | $36,674 | $36,000 | $44,000 | $39,000 |
| 0011 | Pavement removal (202-02240) | SYS | 384 | $30.00 | $41.00 | $10.00 | $10.00 | $12.21 | $30.00 |
| 0012 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $134,659 | $292,900 | $344,718 | $300,000 | $162,960 | $844,619 |
| 0013 | Pipe, remove (202-96133) | LFT | 209 | $5.00 | $6.50 | $20.76 | $0.01 | $29.35 | $15.00 |
| 0014 | Excavation, common (203-02000) | CYS | 3,530 | $23.00 | $28.00 | $44.47 | $35.00 | $20.59 | $25.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 19,149 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $6,750.00 | $11,000 | $4,631.21 | $25,000 | $6,831.26 | $12,000 |
| 0017 | SWQCP preparation (205-12618) | LS | 1 | $1,700.00 | $2,600.00 | $14,550 | $10,000 | $1,684.21 | $1,600.00 |
| 0018 | Excavation, dry (206-51225) | CYS | 160 | $24.00 | $42.00 | $157.64 | $75.00 | $52.58 | $33.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 450 | $33.00 | $37.00 | $57.16 | $50.00 | $46.63 | $47.00 |
| 0020 | B borrow (211-02050) | CYS | 1,750 | $62.00 | $65.00 | $53.69 | $75.00 | $53.94 | $67.00 |
| 0021 | Structure backfill, type 2 (211-09265) | CYS | 44 | $190.00 | $58.50 | $59.41 | $120.00 | $75.88 | $115.00 |
| 0022 | Structure backfill, type 3 (211-09266) | CYS | 2,655 | $64.00 | $60.00 | $53.47 | $75.00 | $90.11 | $67.00 |
| 0023 | Geotextile for pavement, type 1A (214-12236) | SYS | 450 | $4.00 | $1.75 | $0.80 | $5.00 | $1.98 | $3.50 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 46 | $75.00 | $65.00 | $167.92 | $120.00 | $80.15 | $101.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 34.20 | $130.00 | $166.00 | $169.87 | $120.00 | $312.32 | $121.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 47 | $74.00 | $70.00 | $183.17 | $120.00 | $99.31 | $114.00 |
| 0027 | HMA patching, partial depth, type B (304-12624) | TON | 100 | $225.00 | $225.00 | $168.62 | $500.00 | $491.00 | $225.00 |
| 0028 | Milling, transition (306-08043) | SYS | 644 | $7.00 | $13.00 | $13.33 | $10.00 | $11.74 | $5.50 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 71 | $180.00 | $180.00 | $180.37 | $260.00 | $175.55 | $180.00 |
| 0030 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 30 | $237.00 | $237.00 | $294.10 | $300.00 | $257.13 | $237.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 158 | $116.00 | $116.00 | $158.32 | $204.00 | $181.50 | $116.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 830 | $1.20 | $1.20 | $0.77 | $1.00 | $0.61 | $1.20 |
| 0033 | Asphalt for tack coat (406-05520) | TON | 1 | $2,900.00 | $2,900.00 | $0.01 | $0.01 | $720.00 | $2,900.00 |
| 0034 | Terminal joint, type HMA (503-12477) | LFT | 67 | $370.00 | $385.00 | $351.65 | $200.00 | $377.35 | $290.00 |
| 0035 | Guardrail connector system, W-beam, curved, type 1 (601-01625) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,105.26 | $2,000.00 |
| 0036 | Guardrail connector system, W-beam, curved, type 2 (601-01626) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,105.26 | $2,000.00 |
| 0037 | Guardrail, remove (601-02241) | LFT | 852 | $5.00 | $5.00 | $5.00 | $5.00 | $5.26 | $5.00 |
| 0038 | Impact attenuator, ED-W1, TL-3 (601-06233) | EACH | 2 | $13,900 | $13,900 | $13,900 | $13,900 | $14,632 | $13,900 |
| 0039 | Guardrail, W-beam, cable terminal anchor (601-06855) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,052.63 | $1,000.00 |
| 0040 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 138 | $19.00 | $19.00 | $19.00 | $19.00 | $20.00 | $19.00 |
| 0041 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $800.00 | $800.00 | $800.00 | $800.00 | $842.11 | $800.00 |
| 0042 | Guardrail transition, MGS with curb (601-12291) | EACH | 4 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,157.89 | $3,000.00 |
| 0043 | Guardrail, MGS W-beam, cable terminal anchor (601-12294) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 | $1,105.26 | $1,050.00 |
| 0044 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,842.11 | $2,700.00 |
| 0045 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 50 | $20.00 | $20.00 | $20.00 | $20.00 | $21.05 | $20.00 |
| 0046 | Guardrail height transition, VH, 6 FT 3 in. spacing (601-99132) | EACH | 1 | $165.00 | $165.00 | $165.00 | $165.00 | $173.68 | $165.00 |
| 0047 | Barrier delineator (602-06729) | EACH | 14 | $12.00 | $30.00 | $37.00 | $20.00 | $30.23 | $22.00 |
| 0048 | Curb, concrete , modified (605-06120) | LFT | 19.40 | $53.00 | $66.00 | $183.51 | $100.00 | $107.77 | $125.00 |
| 0049 | Curb and gutter, concrete, type B (605-06145) | LFT | 158 | $54.00 | $91.50 | $61.93 | $102.00 | $58.17 | $74.00 |
| 0050 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 178 | $150.00 | $153.00 | $175.05 | $150.00 | $153.90 | $117.00 |
| 0051 | Monument, type B (615-06505) | EACH | 2 | $1,400.00 | $1,000.00 | $1,400.00 | $1,400.00 | $1,473.68 | $1,400.00 |
| 0052 | Borrow, cohesive (616-06025) | CYS | 17 | $132.00 | $162.00 | $161.10 | $80.00 | $725.41 | $267.00 |
| 0053 | Riprap, revetment (616-06405) | TON | 273 | $59.00 | $63.00 | $111.00 | $65.00 | $105.34 | $65.00 |
| 0054 | Geomembrane (616-09395) | SYS | 166 | $84.00 | $87.00 | $79.28 | $30.00 | $14.31 | $87.00 |
| 0055 | Geotextile for riprap, type 1A (616-12246) | SYS | 446 | $4.00 | $2.25 | $1.29 | $5.00 | $2.18 | $2.00 |
| 0056 | Geotextile for riprap, type 2A (616-12248) | SYS | 350 | $3.00 | $3.00 | $2.27 | $5.00 | $2.81 | $4.00 |
| 0057 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $650.00 | $650.00 | $800.00 | $650.00 | $645.49 | $800.00 |
| 0058 | Erosion control blanket (621-02770) | SYS | 8,150 | $1.27 | $1.27 | $1.35 | $1.27 | $1.27 | $1.35 |
| 0059 | Mulched seeding, type U (621-06560) | SYS | 8,150 | $0.63 | $0.63 | $0.65 | $0.63 | $0.62 | $0.65 |
| 0060 | Sodding (621-06574) | SYS | 241 | $22.25 | $22.25 | $10.00 | $22.25 | $22.10 | $10.00 |
| 0061 | Safety terminal, type TL-3 (627-09330) | EACH | 2 | $6,200.00 | $6,200.00 | $6,200.00 | $6,200.00 | $6,156.92 | $6,200.00 |
| 0062 | Cable barrier system, type TL-4, reset (627-11647) | LFT | 320 | $29.00 | $29.00 | $29.00 | $29.00 | $28.80 | $29.00 |
| 0063 | Field office, type C (628-09403) | MOS | 15 | $300.00 | $3,350.00 | $3,593.98 | $3,000.00 | $3,535.72 | $2,700.00 |
| 0064 | Computer system equipment (628-11976) | EACH | 1 | $675.00 | $500.00 | $1,057.05 | $400.00 | $589.29 | $500.00 |
| 0065 | Computer system (628-11977) | EACH | 1 | $2,900.00 | $1,000.00 | $1,585.57 | $3,200.00 | $589.29 | $500.00 |
| 0066 | Topsoil processing and distribution (629-000149) | SYS | 8,150 | $2.13 | $4.00 | $1.62 | $2.13 | $4.80 | $0.90 |
| 0067 | Topsoil amendment budget (629-000150) | DOL | 16,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0068 | Dynamic pile load test (701-06011) | EACH | 2 | $1,300.00 | $3,000.00 | $4,795.56 | $15,000 | $4,663.92 | $5,000.00 |
| 0069 | Pile, steel pipe, 0.375 in., diameter 14 in. (701-08122) | LFT | 510 | $73.00 | $40.00 | $110.94 | $100.00 | $123.17 | $80.00 |
| 0070 | Test pile, dynamic, production (701-09557) | LFT | 122 | $125.00 | $50.00 | $44.26 | $120.00 | $62.09 | $140.00 |
| 0071 | Test pile, dynamic, restrike (701-09559) | EACH | 5 | $1,250.00 | $3,400.00 | $3,023.76 | $1,500.00 | $4,663.91 | $2,000.00 |
| 0072 | Conical pile tip, 14 in. (701-09679) | EACH | 12 | $410.00 | $480.00 | $401.68 | $750.00 | $425.65 | $400.00 |
| 0073 | Prebored hole, diameter 12 in. (701-11714) | LFT | 84 | $238.00 | $80.00 | $176.95 | $100.00 | $277.57 | $130.00 |
| 0074 | Pile sleeves (701-12494) | LFT | 192 | $78.00 | $60.50 | $94.97 | $75.00 | $117.34 | $60.00 |
| 0075 | Concrete, A, substructure (702-51005) | CYS | 69.90 | $850.00 | $1,325.00 | $1,248.93 | $1,200.00 | $1,341.01 | $1,300.00 |
| 0076 | Concrete, B, footings (702-51015) | CYS | 59.20 | $375.00 | $490.00 | $631.31 | $450.00 | $791.71 | $750.00 |
| 0077 | Concrete, C, substructure (702-92857) | CYS | 43.90 | $875.00 | $905.00 | $1,446.14 | $850.00 | $1,476.28 | $775.00 |
| 0078 | Reinforcing bars (703-06028) | LBS | 19,579 | $1.30 | $1.50 | $1.30 | $1.75 | $1.42 | $1.25 |
| 0079 | Reinforcing bars, epoxy coated (703-06029) | LBS | 104,997 | $1.35 | $1.40 | $1.35 | $1.75 | $1.53 | $1.30 |
| 0080 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 40 | $46.00 | $50.00 | $65.41 | $40.00 | $38.63 | $50.00 |
| 0081 | Concrete, C, superstructure (704-51002) | CYS | 256.60 | $875.00 | $1,045.00 | $1,029.13 | $850.00 | $1,376.77 | $850.00 |
| 0082 | Railing, concrete type FC (706-11600) | CYS | 35 | $670.00 | $575.00 | $670.00 | $670.00 | $705.26 | $670.00 |
| 0083 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $1,250.00 | $2,500.00 | $2,500.00 | $2,631.58 | $2,500.00 |
| 0084 | Structural member, concrete, bulb-T beam, 36 in. X 49 in. (707-09865) | LFT | 728 | $551.00 | $618.00 | $582.49 | $600.00 | $607.70 | $500.00 |
| 0085 | Surface seal (709-51821) | LS | 1 | $2,150.00 | $1.00 | $6,000.00 | $1.00 | $0.01 | $0.01 |
| 0086 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 376 | $8.00 | $15.00 | $21.39 | $5.00 | $21.52 | $8.00 |
| 0087 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 132 | $84.00 | $120.00 | $115.76 | $120.00 | $111.16 | $85.00 |
| 0088 | Pipe end section, diameter 30 in. (715-46030) | EACH | 2 | $1,275.00 | $1,275.00 | $1,867.13 | $2,000.00 | $1,204.04 | $800.00 |
| 0089 | Geotextile for underdrains, type 2B (718-12308) | SYS | 293 | $11.00 | $2.50 | $2.86 | $5.00 | $4.33 | $14.00 |
| 0090 | Aggregate for underdrains (718-52610) | CYS | 32 | $128.00 | $59.00 | $59.41 | $120.00 | $99.43 | $150.00 |
| 0091 | Longitudinal grooving (722-12732) | SYS | 896 | $5.00 | $8.00 | $4.22 | $10.00 | $3.67 | $3.49 |
| 0092 | Bearing assembly, elastomeric (726-92406) | EACH | 8 | $2,575.00 | $2,650.00 | $2,540.72 | $7,500.00 | $1,586.55 | $2,500.00 |
| 0093 | Face panels, concrete (731-93945) | SFT | 5,532 | $46.00 | $45.00 | $46.20 | $45.00 | $56.29 | $45.00 |
| 0094 | Wall erection (731-93946) | SFT | 5,532 | $15.00 | $20.00 | $19.31 | $15.00 | $17.86 | $13.00 |
| 0095 | Leveling pad, concrete (731-93947) | LFT | 376 | $41.00 | $58.00 | $28.06 | $50.00 | $54.85 | $21.00 |
| 0096 | Road closure sign assembly (801-04308) | EACH | 4 | $310.00 | $384.00 | $384.00 | $310.00 | $404.21 | $384.00 |
| 0097 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 11,080 | $1.78 | $1.74 | $1.74 | $1.25 | $1.83 | $0.50 |
| 0098 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 72 | $12.55 | $2.88 | $2.88 | $12.55 | $3.03 | $2.88 |
| 0099 | Detour route marker assembly (801-06625) | EACH | 34 | $149.00 | $191.00 | $191.00 | $149.00 | $201.05 | $191.00 |
| 0100 | Construction sign, type A (801-06640) | EACH | 71 | $185.00 | $264.00 | $264.00 | $185.00 | $277.89 | $264.00 |
| 0101 | Construction sign, type B (801-06645) | EACH | 2 | $107.00 | $118.00 | $118.00 | $107.00 | $124.21 | $118.00 |
| 0102 | Flashing arrow sign (801-06710) | DAY | 2 | $150.00 | $200.00 | $17.00 | $2,500.00 | $17.89 | $17.00 |
| 0103 | Maintaining traffic (801-06775) | LS | 1 | $105,000 | $59,500 | $65,120 | $131,654 | $51,286 | $80,000 |
| 0104 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 5 | $5,200.00 | $8,800.00 | $4,200.00 | $3,500.00 | $5,736.84 | $4,200.00 |
| 0105 | Barricade, type III-A (801-07118) | LFT | 264 | $17.55 | $18.84 | $18.34 | $17.55 | $19.83 | $18.84 |
| 0106 | Temporary traffic barrier, type 2 (801-08401) | LFT | 960 | $25.00 | $16.50 | $48.84 | $20.00 | $82.97 | $60.00 |
| 0107 | Portable changeable message sign (801-11642) | EACH | 4 | $4,155.00 | $6,491.00 | $6,491.00 | $4,755.00 | $6,832.63 | $6,491.00 |
| 0108 | Truck mounted attenuator (801-12042) | DAY | 4 | $541.00 | $1,500.00 | $1,585.58 | $5,500.00 | $569.47 | $541.00 |
| 0109 | Law enforcement officer (801-12324) | HRS | 90 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0110 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $355.00 | $1,233.00 | $1,233.00 | $355.00 | $1,297.89 | $1,233.00 |
| 0111 | Temporary buzz strips (801-97643) | LFT | 576 | $29.55 | $20.91 | $20.91 | $29.55 | $22.01 | $20.91 |
| 0112 | Sign, panel, with legend (802-07057) | SFT | 450 | $50.90 | $50.90 | $50.90 | $50.90 | $53.58 | $50.90 |
| 0113 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 41 | $36.00 | $36.00 | $36.00 | $36.00 | $37.89 | $36.00 |
| 0114 | Cantilever sign support foundation, drilled shaft 48 in. (802-11886) | EACH | 2 | $16,630 | $16,630 | $16,630 | $16,630 | $17,505 | $16,630 |
| 0115 | Sign, ground mounted, reset (802-91122) | EACH | 6 | $796.00 | $796.00 | $796.00 | $796.00 | $837.89 | $796.00 |
| 0116 | Overhead sign and structure, relocate (802-94495) | EACH | 2 | $14,059 | $14,059 | $14,059 | $14,059 | $14,799 | $14,059 |
| 0117 | Handhole, signal, type 1 (805-01842) | EACH | 3 | $1,864.00 | $1,864.00 | $1,864.00 | $1,864.00 | $1,962.11 | $1,864.00 |
| 0118 | Conduit , HDPE, 2 in, directional bore (805-04973) | LFT | 172 | $46.20 | $46.20 | $46.20 | $46.20 | $48.63 | $46.20 |
| 0119 | Conduit , HDPE, 2 in, trench (805-04973) | LFT | 172 | $46.20 | $46.20 | $46.20 | $46.20 | $48.63 | $46.20 |
| 0120 | Wire, no. 2 copper, 3 1/C (807-02618) | LFT | 437 | $12.50 | $12.50 | $12.50 | $12.50 | $13.16 | $12.50 |
| 0121 | Wire, no. 6 copper, 1/C (807-11712) | LFT | 437 | $5.90 | $5.90 | $5.90 | $5.90 | $6.21 | $5.90 |
| 0122 | Line, remove (808-06716) | LFT | 5,420 | $0.65 | $0.64 | $0.64 | $0.35 | $0.67 | $0.64 |
| 0123 | Grooving for pavement markings (808-12032) | LFT | 5,380 | $0.71 | $0.71 | $0.71 | $0.71 | $0.75 | $0.74 |
| 0124 | Line, preformed plastic, solid, white with black trim, 6 in. (808-12567) | LFT | 2,480 | $8.22 | $11.64 | $11.64 | $8.22 | $12.25 | $11.64 |
| 0125 | Line, preformed plastic, solid, yellow with black trim, 6 in. (808-12568) | LFT | 2,360 | $8.15 | $11.64 | $11.64 | $8.15 | $12.25 | $11.64 |
| 0126 | Line, preformed plastic, broken, black, 6 in. (808-12783) | LFT | 540 | $10.55 | $10.40 | $10.40 | $10.55 | $10.95 | $10.40 |
| 0127 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 890 | $0.49 | $2.11 | $2.11 | $0.49 | $2.22 | $2.11 |
| 0128 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 890 | $0.45 | $2.11 | $2.11 | $0.45 | $2.22 | $2.11 |
| 0129 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 540 | $10.55 | $9.61 | $9.61 | $10.55 | $10.12 | $9.61 |
| 0130 | Snowplowable raised pavement marker (808-75998) | EACH | 40 | $57.00 | $78.20 | $78.20 | $57.00 | $78.95 | $78.20 |
| 0131 | ITS pole structure , 80 FT (809-000110) | EACH | 1 | $71,608 | $71,608 | $71,608 | $71,608 | $75,377 | $71,608 |
| 0132 | Service point, disconnect only (809-000115) | EACH | 1 | $4,508.00 | $4,508.00 | $4,508.00 | $4,508.00 | $4,745.26 | $4,508.00 |
| 0133 | ITS pole structure foundation (809-06101) | EACH | 1 | $32,390 | $32,390 | $32,390 | $32,390 | $34,095 | $32,390 |
| 0134 | ITS controller cabinet foundation (809-08399) | EACH | 1 | $3,637.00 | $3,637.00 | $3,637.00 | $3,637.00 | $3,828.42 | $3,637.00 |
| 0135 | Safety terminal, remove (202-12026) | EACH | 2 | $55.00 | $2,475.92 | $55.00 | $55.00 | $57.89 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.