INDOT contract B-44359-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on February 12, 2025, Shelby, Greenfield. 9 bids received; low bid $2,552,348 by His Constructors Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 108
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | His Constructors Inc | $2,552,348 | Low |
| 2 | Duncan Robertson Inc | $2,777,663 | +9.0% |
| 3 | Force Construction Co Inc | $2,780,113 | +9.0% |
| 4 | Rieth-Riley Construction Co., Inc. | $2,808,740 | +10% |
| 5 | Milestone Contractors LP | $2,869,000 | +12% |
| 6 | Paul H Rohe Company Inc | $2,958,945 | +16% |
| 7 | Dave Omara Contractor Inc | $3,040,805 | +19% |
| 8 | Beaty Construction Inc | $3,274,566 | +28% |
| 9 | E & B Paving LLC | $3,545,000 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. His Constructors Inc | 2. Duncan Robertson Inc | 3. Force Construction Co Inc | 4. Rieth-Riley Construction Co., Inc. | 5. Milestone Contractors LP | 6. Paul H Rohe Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $23,979 | $20,000 | $18,730 | $17,500 | $18,200 | $19,300 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $113,846 | $130,000 | $138,000 | $224,699 | $144,000 | $147,930 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $44,900 | $80,000 | $21,730 | $84,262 | $85,000 | $19,320 |
| 0011 | Pavement removal (202-02240) | SYS | 789 | $31.35 | $50.00 | $26.00 | $18.52 | $30.00 | $24.00 |
| 0012 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $176,110 | $250,000 | $144,280 | $275,771 | $311,539 | $104,745 |
| 0013 | Pipe, remove (202-96133) | LFT | 132 | $44.19 | $40.00 | $57.00 | $26.52 | $36.00 | $46.00 |
| 0014 | Fence, farm field, remove (202-99187) | LFT | 98 | $3.73 | $3.30 | $4.10 | $11.49 | $3.00 | $10.00 |
| 0015 | Excavation, common (203-02000) | CYS | 670 | $32.11 | $35.00 | $51.00 | $66.77 | $45.00 | $100.00 |
| 0016 | Borrow (203-02070) | CYS | 375 | $60.96 | $1.00 | $36.00 | $0.01 | $1.00 | $94.00 |
| 0017 | Excavation, waterway (203-51223) | CYS | 400 | $60.47 | $65.00 | $48.00 | $60.34 | $49.00 | $50.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 15,700 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $83,600 | $22,500 | $10,810 | $19,535 | $2,100.00 | $3,500.00 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $35,709 | $3,000.00 | $3,087.00 | $3,490.30 | $1,700.00 | $2,500.00 |
| 0021 | Excavation, wet (206-51220) | CYS | 110 | $52.69 | $120.00 | $71.00 | $78.95 | $68.00 | $100.00 |
| 0022 | Excavation, dry (206-51225) | CYS | 60 | $54.59 | $85.00 | $53.00 | $98.97 | $54.00 | $100.00 |
| 0023 | Cofferdam (206-51235) | LS | 1 | $105,944 | $50,000 | $298,210 | $181,245 | $119,000 | $411,030 |
| 0024 | Subgrade treatment, type II (207-08264) | SYS | 43 | $67.69 | $20.00 | $59.00 | $92.99 | $56.00 | $70.00 |
| 0025 | Subgrade treatment, type IC (207-09935) | SYS | 1,459 | $27.29 | $60.00 | $33.00 | $37.65 | $30.50 | $45.00 |
| 0026 | B borrow (211-02050) | CYS | 195 | $59.96 | $15.00 | $67.00 | $98.25 | $68.00 | $110.00 |
| 0027 | Aggregate for end bent backfill (211-06467) | CYS | 28 | $226.79 | $165.00 | $141.00 | $363.56 | $265.00 | $120.00 |
| 0028 | Structure backfill, type 2 (211-09265) | CYS | 36 | $129.18 | $165.00 | $100.00 | $56.04 | $142.00 | $90.00 |
| 0029 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,492 | $4.28 | $6.00 | $4.60 | $2.76 | $3.05 | $4.00 |
| 0030 | Compacted aggregate, no. 8 (301-12233) | CYS | 20 | $153.46 | $150.00 | $117.00 | $143.41 | $128.00 | $120.00 |
| 0031 | Compacted aggregate, no. 53 (301-12234) | CYS | 185 | $93.57 | $145.00 | $85.00 | $128.20 | $76.00 | $100.00 |
| 0032 | Subbase for PCCP (302-06464) | CYS | 62 | $134.66 | $170.00 | $155.00 | $132.13 | $185.00 | $140.00 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 260 | $34.16 | $55.00 | $59.00 | $63.92 | $70.00 | $68.00 |
| 0034 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 334 | $43.20 | $25.00 | $51.00 | $61.41 | $41.00 | $72.00 |
| 0035 | Milling, transition (306-08043) | SYS | 160 | $41.91 | $40.00 | $23.00 | $31.28 | $32.00 | $12.00 |
| 0036 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 106 | $191.33 | $137.00 | $129.00 | $226.54 | $185.00 | $220.00 |
| 0037 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 153 | $155.30 | $137.00 | $129.00 | $138.97 | $145.00 | $165.00 |
| 0038 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 641 | $149.09 | $137.00 | $129.00 | $93.65 | $152.00 | $120.00 |
| 0039 | Joint adhesive, surface (401-10258) | LFT | 905 | $0.62 | $0.55 | $0.50 | $0.77 | $1.45 | $0.60 |
| 0040 | Joint adhesive, intermediate (401-10259) | LFT | 845 | $0.62 | $0.55 | $0.50 | $0.89 | $1.65 | $0.90 |
| 0041 | Liquid asphalt sealant (401-11785) | LFT | 905 | $0.01 | $0.06 | $0.05 | $0.01 | $1.00 | $0.35 |
| 0042 | Asphalt for tack coat (406-05521) | SYS | 3,424 | $1.24 | $0.55 | $0.50 | $0.01 | $1.00 | $0.70 |
| 0043 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $2,283.55 | $2,750.00 | $2,572.00 | $5,438.04 | $2,100.00 | $6,000.00 |
| 0044 | Terminal joint, type HMA (503-12477) | LFT | 80 | $205.00 | $325.00 | $403.00 | $357.69 | $420.00 | $405.00 |
| 0045 | Guardrail transition, type TGB (601-01522) | EACH | 2 | $3,721.02 | $3,295.00 | $2,572.00 | $2,500.00 | $2,995.00 | $2,500.00 |
| 0046 | Guardrail terminal system, W-beam curved, type 1 (601-01700) | EACH | 1 | $3,634.05 | $3,218.00 | $3,087.00 | $3,000.00 | $2,925.00 | $3,000.00 |
| 0047 | Guardrail, W-beam, shop curved, 6 FT 3 in. spacing (601-02103) | LFT | 13 | $49.70 | $44.00 | $37.00 | $36.00 | $40.00 | $36.00 |
| 0048 | Guardrail, remove (601-02241) | LFT | 282 | $3.73 | $3.30 | $5.40 | $5.25 | $3.00 | $5.25 |
| 0049 | Curved terminal end (601-05999) | EACH | 1 | $155.29 | $138.00 | $111.00 | $108.00 | $125.00 | $108.00 |
| 0050 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 32 | $23.61 | $22.00 | $22.00 | $21.00 | $19.00 | $21.00 |
| 0051 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $3,789.35 | $3,355.00 | $2,701.00 | $2,625.00 | $3,050.00 | $2,625.00 |
| 0052 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,478.75 | $3,080.00 | $2,932.00 | $2,850.00 | $2,800.00 | $2,850.00 |
| 0053 | Barrier delineator (602-06729) | EACH | 14 | $28.34 | $20.00 | $31.00 | $37.15 | $41.08 | $23.41 |
| 0054 | Fence, farm field, 47 in. (603-06040) | LFT | 75 | $29.82 | $26.50 | $45.00 | $44.00 | $24.00 | $44.00 |
| 0055 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 248 | $240.54 | $250.00 | $191.00 | $205.07 | $200.00 | $205.00 |
| 0056 | Mailbox assembly, single (611-06497) | EACH | 1 | $260.91 | $230.00 | $283.00 | $275.00 | $210.00 | $275.00 |
| 0057 | Monument, type B (615-06505) | EACH | 2 | $1,105.75 | $980.00 | $1,646.00 | $1,600.00 | $890.00 | $1,600.00 |
| 0058 | Riprap, class 1 (616-05688) | TON | 678 | $89.65 | $110.00 | $106.00 | $108.60 | $91.00 | $78.00 |
| 0059 | Riprap, revetment (616-06405) | TON | 109 | $73.73 | $65.00 | $51.00 | $138.61 | $115.00 | $140.00 |
| 0060 | Geotextile for riprap, type 1A (616-12246) | SYS | 796 | $5.58 | $5.00 | $3.60 | $1.16 | $2.25 | $3.00 |
| 0061 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $807.57 | $770.00 | $720.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0062 | Erosion control blanket (621-02770) | SYS | 1,241 | $3.76 | $2.20 | $2.10 | $2.75 | $2.75 | $2.75 |
| 0063 | Water (621-06567) | KGAL | 6 | $31.06 | $16.50 | $15.00 | $0.50 | $0.50 | $0.50 |
| 0064 | Sodding (621-06574) | SYS | 53 | $70.44 | $52.00 | $49.00 | $90.00 | $90.00 | $90.00 |
| 0065 | Seed mixture, floodplain (621-12612) | LBS | 18 | $172.70 | $120.00 | $113.00 | $225.00 | $225.00 | $225.00 |
| 0066 | Sign, "DO not mow or spray" (622-52436) | EACH | 4 | $105.61 | $110.00 | $98.00 | $130.00 | $130.00 | $130.00 |
| 0067 | Field office, type C (628-09403) | MOS | 9 | $1,950.03 | $3,000.00 | $3,293.00 | $3,608.87 | $4,100.00 | $3,600.00 |
| 0068 | Plant growth layer (629-12029) | SYS | 1,241 | $10.92 | $8.00 | $9.30 | $10.31 | $5.00 | $15.50 |
| 0069 | Dynamic pile load test (701-06011) | EACH | 2 | $8,079.26 | $2,000.00 | $5,499.00 | $4,264.02 | $12,600 | $3,140.00 |
| 0070 | Test pile, dynamic, production (701-09557) | LFT | 105 | $43.43 | $90.00 | $155.00 | $52.19 | $53.00 | $225.00 |
| 0071 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $7,458.05 | $2,000.00 | $2,749.00 | $1,885.21 | $4,600.00 | $3,250.00 |
| 0072 | Pile, steel pipe, 0.375 in., diameter 14 in. (701-09665) | LFT | 1,359 | $106.35 | $100.00 | $72.00 | $61.83 | $120.00 | $112.00 |
| 0073 | Conical pile tip, 14 in. (701-09679) | EACH | 34 | $549.15 | $600.00 | $360.00 | $371.50 | $410.00 | $425.00 |
| 0074 | Concrete, A, substructure (702-51005) | CYS | 177.20 | $880.86 | $1,000.00 | $1,485.00 | $1,290.12 | $1,435.00 | $1,295.00 |
| 0075 | Concrete, B, footings (702-51015) | CYS | 8.90 | $2,084.67 | $700.00 | $1,228.00 | $1,743.95 | $3,050.00 | $1,000.00 |
| 0076 | Concrete, C, substructure (702-92857) | CYS | 44.40 | $1,780.16 | $1,500.00 | $1,182.00 | $1,292.45 | $1,323.00 | $1,750.00 |
| 0077 | Reinforcing bars (703-06028) | LBS | 15,407 | $1.38 | $1.50 | $1.40 | $1.14 | $1.30 | $1.09 |
| 0078 | Reinforcing bars, epoxy coated (703-06029) | LBS | 112,678 | $1.36 | $1.50 | $1.20 | $1.21 | $1.55 | $1.22 |
| 0079 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 40 | $110.09 | $75.00 | $46.00 | $62.83 | $45.00 | $100.00 |
| 0080 | Concrete, C, superstructure (704-51002) | CYS | 269.20 | $989.48 | $950.00 | $1,067.00 | $1,191.52 | $1,180.00 | $1,250.00 |
| 0081 | Railing, concrete type FC (706-11600) | CYS | 35.20 | $888.32 | $1,000.00 | $736.00 | $715.00 | $715.00 | $715.00 |
| 0082 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $1,497.10 | $2,500.00 | $1,240.00 | $1,205.00 | $1,205.00 | $1,205.00 |
| 0083 | Structural member, concrete, box beam, 27 in. X 48 in. (707-09862) | LFT | 990 | $279.90 | $475.00 | $327.00 | $281.39 | $330.00 | $330.00 |
| 0084 | Surface seal STR. no. 1 (709-51821) | LS | 1 | $3,205.42 | $4,000.00 | $1.00 | $1.00 | $0.01 | $6,200.00 |
| 0085 | Anchor plate (711-02707) | EACH | 20 | $80.76 | $150.00 | $500.00 | $147.52 | $335.00 | $445.00 |
| 0086 | Pipe, type 3, circular, diameter 36 in. (715-05177) | LFT | 111 | $112.67 | $150.00 | $140.00 | $195.61 | $90.00 | $190.00 |
| 0087 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 120 | $20.15 | $18.00 | $19.00 | $38.10 | $22.00 | $80.00 |
| 0088 | Pipe end section, diameter 36 in. (715-46040) | EACH | 1 | $2,942.82 | $2,000.00 | $2,140.00 | $2,070.18 | $1,600.00 | $1,800.00 |
| 0089 | Geotextile for underdrains, type 1A (718-12305) | SYS | 90 | $9.68 | $4.00 | $3.10 | $1.70 | $3.25 | $7.00 |
| 0090 | Automatic drainage gate 36" diameter (721-09548) | EACH | 1 | $35,507 | $20,000 | $24,160 | $27,225 | $33,000 | $28,225 |
| 0091 | Longitudinal grooving (722-12732) | SYS | 1,123 | $4.35 | $9.00 | $4.10 | $4.34 | $8.50 | $3.50 |
| 0092 | Bearing assembly, elastomeric (726-92406) | EACH | 40 | $552.17 | $350.00 | $194.00 | $424.66 | $450.00 | $165.50 |
| 0093 | Road closure sign assembly (801-04308) | EACH | 9 | $325.51 | $275.00 | $269.00 | $262.00 | $261.00 | $261.00 |
| 0094 | Detour route marker assembly (801-06625) | EACH | 42 | $188.85 | $94.00 | $158.00 | $152.00 | $154.00 | $154.00 |
| 0095 | Construction sign, type A (801-06640) | EACH | 8 | $279.54 | $220.00 | $238.00 | $225.00 | $231.00 | $231.00 |
| 0096 | Construction sign, type B (801-06645) | EACH | 2 | $80.76 | $110.00 | $119.00 | $65.00 | $116.00 | $116.00 |
| 0097 | Maintaining traffic (801-06775) | LS | 1 | $6,833.25 | $45,000 | $161,000 | $25,000 | $15,000 | $29,585 |
| 0098 | Barricade, type III-A (801-07118) | LFT | 64 | $14.91 | $22.00 | $17.00 | $12.00 | $16.88 | $16.88 |
| 0099 | Barricade, type III-B (801-07119) | LFT | 64 | $18.64 | $22.00 | $17.00 | $15.00 | $16.88 | $16.88 |
| 0100 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 70 | $33.55 | $30.00 | $19.00 | $18.00 | $27.00 | $18.00 |
| 0101 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 29 | $31.06 | $27.50 | $15.00 | $15.00 | $25.00 | $15.00 |
| 0102 | Sign, sheet, relocate (802-07060) | EACH | 8 | $310.60 | $275.00 | $317.00 | $308.00 | $250.00 | $308.00 |
| 0103 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,122 | $2.48 | $2.20 | $1.20 | $5.66 | $1.16 | $1.16 |
| 0104 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 561 | $2.48 | $2.20 | $1.20 | $5.66 | $1.16 | $1.16 |
| 0105 | Grooving for pavement markings (808-12032) | LFT | 1,824 | $3.49 | $3.30 | $0.90 | $2.81 | $0.89 | $0.89 |
| 0106 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 141 | $2.48 | $2.20 | $2.20 | $5.66 | $2.18 | $2.18 |
| 0107 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 8 | $155.30 | $30.00 | $79.00 | $66.34 | $75.00 | $80.00 |
| 0108 | Snowplowable raised pavement marker (808-75998) | EACH | 8 | $155.30 | $138.00 | $117.00 | $353.59 | $114.00 | $114.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.