Bizzack Construction LLC: KYTC bid record
Bizzack Construction LLC submitted 11 bids on Kentucky Transportation Cabinet contracts in the data, from 25 SEP 2020 to 20 AUG 2026, and was the low bidder on 7 of them (64%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $421,909,584
- Latest bid
- 20 AUG 2026
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 1 | 100% |
| 2021 | 2 | 1 | 50% |
| 2022 | 3 | 3 | 100% |
| 2025 | 1 | 0 | 0% |
| 2026 | 4 | 2 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 8 | 3 | 3 | 100% |
| District 10 | 2 | 1 | 50% |
| District 12 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete-class A | CY | 37 | 21 (57%) | $785.00 | $1,088.01 | |
| Masonry coating | SY | 14 | 12 (86%) | $10.00 | $16.00 | |
| Structure excav-solid rock | CY | 26 | 10 (38%) | $100.00 | $125.00 | |
| Piles-steel HP12X53 | LF | 12 | 8 (67%) | $78.00 | $112.50 | |
| Fabric-geotextile class 2 | SY | 8 | 8 (100%) | $3.00 | $2.75 | |
| Trainee payment reimbursement | HR | 8 | 8 (100%) | $1.00 | $1.00 | |
| Concrete-class AA | CY | 15 | 6 (40%) | $995.00 | $1,716.02 | |
| Rail system single slope - 40 in | LF | 14 | 6 (43%) | $125.00 | $140.00 | |
| Structure excavation-common | CY | 12 | 6 (50%) | $31.50 | $45.00 | |
| Erosion control blanket | SY | 6 | 6 (100%) | $1.50 | $2.50 | |
| Pipeline inspection | LF A A | 6 | 6 (100%) | $2.35 | $2.57 | |
| Test piles | LF | 14 | 5 (36%) | $276.50 | $187.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hinkle Construction Services LLC | 4 | 1 of 4 |
| Frederick & May Construction Co | 4 | 2 of 4 |
| Triton Construction Inc and Subsidiaries | 2 | 0 of 2 |
| Triton Construction Inc | 2 | 1 of 2 |
| Standafer Builders Inc | 2 | 1 of 2 |
| Kay & Kay Contracting LLC | 1 | 0 of 1 |
| Kanawha Stone Company Inc | 1 | 0 of 1 |
| Vecellio & Grogan Inc | 1 | 0 of 1 |
| Johnson Bros Corp A Southland Co | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 20 AUG 2026 | 26-1515 | GRADE & DRAIN WITH ASPHALT SURFACE STARFIRE HAUL ROAD (CR 1390) | 1 of 4 | $15,232,039 | Low, 2.0% under the second | |
| 21 MAY 2026 | 26-1514 | GRADE & DRAIN WITH ASPHALT SURFACE HIGHWAY 15 (KY 15) | 2 of 2 | $46,918,218 | +8.0% | |
| 21 MAY 2026 | 26-1121 | ASPHALT SURFACE WITH GRADE & DRAIN GRANDVIEW NEIGHBORHOOD | 2 of 2 | $10,982,170 | +23% | |
| 29 JAN 2026 | 26-1103 | ASPHALT SURFACE WITH GRADE & DRAIN WENDELL H. FORD AIRPORT ACCESS ROAD (NEW ROUTE) | 1 of 2 | $15,260,490 | Low, 14% under the second | |
| 24 JUL 2025 | 25-1014 | ASPHALT SURFACE WITH GRADE & DRAIN CHESTNUT RIDGE ROAD | 2 of 2 | $7,790,818 | +4.0% | |
| 26 MAY 2022 | 22-1321 | District 8 | GRADE & DRAIN AND PAVEMENT ALTERNATES US127 | 1 of 2 | $105,454,201 | Low, 20% under the second |
| 28 APR 2022 | 22-1022 | District 10 | GRADE, DRAIN & SURFACE WITH BRIDGE MOUNTAIN PARKWAY(KY-9009) | 1 of 3 | $97,116,898 | Low, 13% under the second |
| 24 MAR 2022 | 22-1310 | District 8 | GRADE & DRAIN AND PAVEMENT ALTERNATES US127 | 1 of 1 | $105,283,470 | Low |
| 21 MAY 2021 | 21-1020 | District 12 | GRADE, DRAIN & SURFACE WITH BRIDGE MINNIE TO HAROLD ROAD(NEW LOC) | 1 of 5 | $34,108,261 | Low, 11% under the second |
| 19 FEB 2021 | 21-1307 | District 10 | GRADE & DRAIN WITH ASPHALT SURFACE BOONEVILLE-BEATTYVILLE ROAD (KY11) | 3 of 3 | $21,376,848 | +6.0% |
| 25 SEP 2020 | 20-1305 | District 8 | GRADE, DRAIN & SURFACE WITH BRIDGE SOMERSET - MT VERNON ROAD (KY 461) | 1 of 3 | $49,454,225 | Low, 4.0% under the second |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.