Marbro, Inc.: NJDOT bid record
Marbro, Inc. submitted 16 bids on New Jersey DOT contracts in the data, from 05 OCT 2017 to 12 FEB 2026, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +41% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $1,947,117
- Latest bid
- 12 FEB 2026
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2018 | 6 | 1 | 17% |
| 2019 | 2 | 0 | 0% |
| 2021 | 2 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| C1 | 7 | 1 | 14% |
| N1 | 5 | 0 | 0% |
| S1 | 3 | 0 | 0% |
| S4 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 14 | 14 (100%) | $1,000.00 | $2,700.00 |
| Prime coat | 401036M | GAL | 10 | 10 (100%) | $0.01 | $0.01 |
| Asphalt price adjustment | 160007M | DOL | 8 | 8 (100%) | $4,150.00 | $10,200 |
| Regulatory and warning sign | 612003P | SF | 12 | 7 (58%) | $35.50 | $45.00 |
| Fertilizing and seeding, type F | 806018P | SY | 9 | 7 (78%) | $1.00 | $2.10 |
| Construction signs | 159012M | SF | 15 | 6 (40%) | $15.00 | $15.00 |
| Removal of beam guide rail | 609075M | LF | 12 | 6 (50%) | $1.00 | $2.00 |
| Construction layout | 157004M | DOL | 14 | 5 (36%) | $37,500 | $40,000 |
| Heavy duty silt fence, orange | 158009M | LF | 13 | 5 (38%) | $9.00 | $8.00 |
| Coarse aggregate, size no. 57 | 302060P | CY | 8 | 5 (63%) | $45.50 | $80.00 |
| Polymerized joint adhesive | 401027M | LF | 14 | 4 (29%) | $3.00 | $0.52 |
| Erosion control sediment removal | 158084M | CY | 12 | 4 (33%) | $50.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Iew Construction Group, Inc. | 8 | 5 of 8 |
| Ritacco Construction, Inc. | 8 | 7 of 8 |
| Midlantic Construction, LLC | 7 | 5 of 7 |
| Anselmi & Decicco, Inc. | 6 | 6 of 6 |
| Sparwick Contracting, Inc. | 5 | 5 of 5 |
| Berto Construction, Inc. | 5 | 5 of 5 |
| South State, Inc. | 4 | 3 of 4 |
| Carbro Constructors Corp. | 4 | 2 of 4 |
| Joseph M. Sanzari, Inc. | 4 | 4 of 4 |
| Earle Asphalt Company | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 FEB 2026 | 25139 | C1 | Route 36, Bridge over Troutman's Creek | 9 of 9 | $13,317,117 | +68% |
| 07 NOV 2024 | 22468 | S4 | Maintenance Bridge Fender Installation 2022-1 | 3 of 3 | $6,717,117 | +153% |
| 08 JUN 2023 | 23104 | C1 | Forest Resource Edu. Center Access Rd Bridge over Toms River | 3 of 5 | $3,077,117 | +18% |
| 01 JUN 2023 | 23121 | C1 | Route 34 Bridge over Former Brick Yard Road | 3 of 6 | $1,997,117 | +21% |
| 06 JAN 2022 | 21140 | N1 | Weldon Road Over Route 15 Superstructure Replacement | 7 of 8 | $10,517,117 | +39% |
| 25 FEB 2021 | 21102 | N1 | HOLLYWOOD AVE(CR 625), BRIDGE OVER RT. 46 | 8 of 9 | $4,571,117 | +39% |
| 23 FEB 2021 | 20147 | C1 | Rt 78 WB, Bridge over North Branch of Raritan River | 10 of 10 | $11,717,117 | +69% |
| 21 MAY 2019 | 19107 | C1 | ALEXANDER RD, BRIDGE OVER D&R CANAL | 3 of 8 | $5,891,117 | +21% |
| 11 APR 2019 | 19106 | N1 | Route 15 Bridge over Main Street | 7 of 7 | $6,377,117 | +56% |
| 01 NOV 2018 | 18145 | N1 | RT 173 BRIDGE OVER POHATCONG CREEK | 5 of 5 | $6,971,117 | +44% |
| 30 AUG 2018 | 18132 | S1 | ROUTE 322 BUSINESS, BRIDGE OVER RACCOON CREEK | 4 of 4 | $4,317,117 | +31% |
| 28 AUG 2018 | 18133 | C1 | Route 206 Over Branch of Stony Brook | 1 of 3 | $1,947,117 | Low, 2.0% under the second |
| 10 JUL 2018 | 18123 | N1 | Route 94, Bridge Over Paulins Kill & CR 521 (Stillwater Rd.) | 2 of 3 | $3,917,117 | +5.0% |
| 17 MAY 2018 | 18112 | C1 | Route 173 Musconetcong River, Culvert Replacement | 2 of 3 | $2,531,117 | +57% |
| 08 FEB 2018 | 17148 | S1 | ROUTE 9, JOBS CREEK BRIDGE BRIDGE REPLACEMENT | 5 of 6 | $8,771,117 | +41% |
| 05 OCT 2017 | 17145 | S1 | RT. 9 BRIDGE OVER WARETOWN CREEK STRUCTURE REPLACEMENT | 4 of 6 | $4,471,117 | +46% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.