Marbro, Inc.: NJDOT bid record

Marbro, Inc. submitted 16 bids on New Jersey DOT contracts in the data, from 05 OCT 2017 to 12 FEB 2026, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +41% above the low bid.

Owner
New Jersey DOT
Low bid volume
$1,947,117
Latest bid
12 FEB 2026
Data through
16 APR 2026
16Bids
1Low bids
6Win rate, percent
+41%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2017100%
20186117%
2019200%
2021200%
2022100%
2023200%
2024100%
2026100%
Marbro, Inc., NJDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
C17114%
N1500%
S1300%
S4100%
Marbro, Inc., NJDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Fuel price adjustment160004MDOL1414 (100%)$1,000.00$2,700.00
Prime coat401036MGAL1010 (100%)$0.01$0.01
Asphalt price adjustment160007MDOL88 (100%)$4,150.00$10,200
Regulatory and warning sign612003PSF127 (58%)$35.50$45.00
Fertilizing and seeding, type F806018PSY97 (78%)$1.00$2.10
Construction signs159012MSF156 (40%)$15.00$15.00
Removal of beam guide rail609075MLF126 (50%)$1.00$2.00
Construction layout157004MDOL145 (36%)$37,500$40,000
Heavy duty silt fence, orange158009MLF135 (38%)$9.00$8.00
Coarse aggregate, size no. 57302060PCY85 (63%)$45.50$80.00
Polymerized joint adhesive401027MLF144 (29%)$3.00$0.52
Erosion control sediment removal158084MCY124 (33%)$50.00$20.00
Marbro, Inc., NJDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Marbro, Inc., NJDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 FEB 202625139C1Route 36, Bridge over Troutman's Creek9 of 9$13,317,117+68%
07 NOV 202422468S4Maintenance Bridge Fender Installation 2022-13 of 3$6,717,117+153%
08 JUN 202323104C1Forest Resource Edu. Center Access Rd Bridge over Toms River3 of 5$3,077,117+18%
01 JUN 202323121C1Route 34 Bridge over Former Brick Yard Road3 of 6$1,997,117+21%
06 JAN 202221140N1Weldon Road Over Route 15 Superstructure Replacement7 of 8$10,517,117+39%
25 FEB 202121102N1HOLLYWOOD AVE(CR 625), BRIDGE OVER RT. 468 of 9$4,571,117+39%
23 FEB 202120147C1Rt 78 WB, Bridge over North Branch of Raritan River10 of 10$11,717,117+69%
21 MAY 201919107C1ALEXANDER RD, BRIDGE OVER D&R CANAL3 of 8$5,891,117+21%
11 APR 201919106N1Route 15 Bridge over Main Street7 of 7$6,377,117+56%
01 NOV 201818145N1RT 173 BRIDGE OVER POHATCONG CREEK5 of 5$6,971,117+44%
30 AUG 201818132S1ROUTE 322 BUSINESS, BRIDGE OVER RACCOON CREEK4 of 4$4,317,117+31%
28 AUG 201818133C1Route 206 Over Branch of Stony Brook1 of 3$1,947,117Low, 2.0% under the second
10 JUL 201818123N1Route 94, Bridge Over Paulins Kill & CR 521 (Stillwater Rd.)2 of 3$3,917,117+5.0%
17 MAY 201818112C1Route 173 Musconetcong River, Culvert Replacement2 of 3$2,531,117+57%
08 FEB 201817148S1ROUTE 9, JOBS CREEK BRIDGE BRIDGE REPLACEMENT5 of 6$8,771,117+41%
05 OCT 201717145S1RT. 9 BRIDGE OVER WARETOWN CREEK STRUCTURE REPLACEMENT4 of 6$4,471,117+46%
Marbro, Inc.: latest NJDOT bids in the data

How this record was read

NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.

  • Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy