Rencor, Inc.: NJDOT bid record
Rencor, Inc. submitted 12 bids on New Jersey DOT contracts in the data, from 19 OCT 2017 to 17 OCT 2024, and was the low bidder on 3 of them (25%). When it was not low, its total sat a median +34% above the low bid.
- Owner
- New Jersey DOT
- Low bid volume
- $16,366,394
- Latest bid
- 17 OCT 2024
- Data through
- 16 APR 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2017 | 1 | 0 | 0% |
| 2019 | 2 | 2 | 100% |
| 2020 | 1 | 0 | 0% |
| 2021 | 5 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| N1 | 7 | 2 | 29% |
| C1 | 4 | 0 | 0% |
| S1 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fuel price adjustment | 160004M | DOL | 11 | 11 (100%) | $3,000.00 | $2,700.00 |
| Asphalt price adjustment | 160007M | DOL | 9 | 9 (100%) | $7,800.00 | $10,200 |
| Shaft coring | 503015M | LF | 9 | 8 (89%) | $51.00 | $100.00 |
| Excavation, unclassified | 202009P | CY | 29 | 7 (24%) | $65.00 | $78.60 |
| Obstruction removal | 503048M | LF | 8 | 7 (88%) | $37.00 | $430.00 |
| Concrete footing | 504015P | CY | 8 | 6 (75%) | $520.00 | $785.00 |
| Tomography | 503051M | U | 8 | 6 (75%) | $760.00 | $825.00 |
| Concrete abutment wall | 504024P | CY | 8 | 5 (63%) | $1,277.00 | $1,900.00 |
| Traffic stripes, 4" | 610003M | LF | 10 | 4 (40%) | $0.62 | $0.50 |
| 9" X 16" concrete vertical curb | 607018P | LF | 10 | 4 (40%) | $45.00 | $60.00 |
| Breakaway barricade | 159003M | U | 12 | 3 (25%) | $100.00 | $1.00 |
| Straw mulching | 809003M | SY | 11 | 3 (27%) | $1.50 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Anselmi & Decicco, Inc. | 8 | 5 of 8 |
| Iew Construction Group, Inc. | 7 | 2 of 7 |
| Ritacco Construction, Inc. | 6 | 5 of 6 |
| Konkus Corporation | 4 | 3 of 4 |
| Berto Construction, Inc. | 4 | 3 of 4 |
| Ferreira Construction Co., Inc. | 4 | 2 of 4 |
| Union Paving & Construction Co., Inc. | 4 | 2 of 4 |
| B Anthony Construction Corp J/V A. Servidone Inc | 3 | 2 of 3 |
| Joseph M. Sanzari, Inc. | 3 | 2 of 3 |
| Green Construction, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 OCT 2024 | 24141 | C1 | Route 31 SB CR 523 (Walter Foran Blvd) to Wescott Dr(CR 600) | 2 of 4 | $4,084,360 | +12% |
| 31 OCT 2023 | 23157 | N1 | Rt. 80, Exit 55, Culvert | 1 of 5 | $1,481,625 | Low, 13% under the second |
| 12 OCT 2023 | 23132 | N1 | Route 23 NB Bridge Over Pequannock River Bridge Improvements | 3 of 5 | $8,538,449 | +16% |
| 10 JUN 2021 | 21125 | C1 | River Road (CR 622) Bridge over Route 287 | 4 of 5 | $15,917,200 | +18% |
| 03 JUN 2021 | 21113 | N1 | Route 22 / Route 82 / Garden State Parkway Interchange | 6 of 7 | $48,894,122 | +20% |
| 27 MAY 2021 | 21121 | N1 | Rt 22 Rockfall Mitigation, Phillipsburg | 3 of 6 | $6,756,621 | +35% |
| 18 MAR 2021 | 21105 | N1 | Route 280 Rockfall Mitigation, West Orange Township | 7 of 7 | $9,745,913 | +74% |
| 25 FEB 2021 | 21102 | N1 | HOLLYWOOD AVE(CR 625), BRIDGE OVER RT. 46 | 9 of 9 | $6,414,492 | +95% |
| 21 MAY 2020 | 20120 | C1 | Milltown Rd/North Main St (CR 606), Bridge over Rt 1 | 9 of 10 | $11,731,074 | +34% |
| 14 NOV 2019 | 19142 | N1 | RT 22 BLOY STREET TO LIBERTY AVENUE | 1 of 4 | $10,736,538 | Low, 2.0% under the second |
| 28 FEB 2019 | 19102 | S1 | Route 9 SB Bridge over Route 440 Ramp GM | 1 of 7 | $4,148,231 | Low, 7.0% under the second |
| 19 OCT 2017 | 17147 | C1 | ROUTE 35, PERTH AMBOY CONNECTOR BRIDGE REPLACEMENT | 7 of 11 | $14,826,999 | +50% |
How this record was read
NJDOT bid tabulation PDFs linked from its 2018 to 2026 award pages (lettings from June 2017 to April 2026). Bids on redacted tabulations with scanned pages could not be read and are left out, as are bids that did not match their published total. Some maintenance contracts price an adjustment factor (unit PCT): published as is, not a unit price.
- Every bid counted here matched its published total to within one dollar; NJDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.