ODOT contract 250044 bid tabulation
D08-Bridge Maintenance FY2025 (BRIDGE REPAIR). Let by Ohio DOT on January 30, 2025, District 8. 3 bids received; low bid $1,566,203 by Prus Construction Company, +8.8% against the engineer's estimate of $1,440,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 101
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Prus Construction Company | $1,566,203 | Low | +9.0% |
| 2 | Complete General Construction Company | $1,774,712 | +13% | +23% |
| 3 | Sunesis Construction Co | $1,782,612 | +14% | +24% |
Engineer's estimate: $1,440,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Prus Construction Company | 2. Complete General Construction Company | 3. Sunesis Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $50,000 | $25,000 | $23,726 |
| 2 | Walk removed (202E30000) | SF | 240 | $24.00 | $75.00 | $4.00 |
| 3 | Guardrail removed (202E38000) | FT | 325 | $3.00 | $2.00 | $7.00 |
| 4 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 3 | $400.00 | $325.00 | $556.00 |
| 5 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $150.00 | $110.00 | $125.00 |
| 6 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $105.00 | $75.00 | $125.00 |
| 7 | Reshaping under guardrail (209E15000) | STA | 6 | $75.00 | $50.00 | $75.00 |
| 8 | Guardrail, type MGS with long posts (606E15100) | FT | 150 | $30.00 | $23.60 | $23.00 |
| 9 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 3 | $3,500.00 | $2,980.00 | $2,600.00 |
| 10 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,750.00 | $1,475.00 | $1,250.00 |
| 11 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 4 | $1,825.00 | $1,520.00 | $1,250.00 |
| 12 | 5" concrete walk (608E12000) | SF | 240 | $35.00 | $50.00 | $21.00 |
| 13 | Special - consultant for concrete quality control (690E98400) | LS | 1 | $15,000 | $13,000 | $2,734.00 |
| 14 | Topsoil (659E00300) | CY | 62 | $115.00 | $30.00 | $48.00 |
| 15 | Seeding and mulching (659E10000) | SY | 563 | $11.00 | $8.53 | $5.00 |
| 16 | Repair seeding and mulching (659E14000) | SY | 28 | $3.00 | $3.50 | $2.00 |
| 17 | Commercial fertilizer (659E20000) | TON | 0.08 | $1,100.00 | $675.00 | $1,400.00 |
| 18 | Lime (659E31000) | ACRE | 0.12 | $175.00 | $50.00 | $200.00 |
| 19 | Water (659E35000) | MGAL | 3 | $1.75 | $0.50 | $5.00 |
| 20 | Erosion control (832E30000) | EACH | 24,000 | $1.00 | $1.00 | $1.00 |
| 21 | Pavement planing, asphalt concrete (T=1.50") (254E01000) | SY | 3,754 | $5.00 | $5.50 | $20.00 |
| 22 | Non-tracking tack coat (407E20000) | GAL | 338 | $12.50 | $5.00 | $5.00 |
| 23 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 156 | $325.00 | $335.00 | $335.00 |
| 24 | RPM (621E00100) | EACH | 2 | $1,400.00 | $1,120.00 | $65.00 |
| 25 | Raised pavement marker removed (621E54000) | EACH | 3 | $61.00 | $150.00 | $50.00 |
| 26 | Barrier reflector, type 2 (BI-directional) (626E00110) | EACH | 11 | $15.00 | $12.00 | $12.00 |
| 27 | Ground mounted support, no. 3 post (630E03100) | FT | 78 | $25.00 | $20.00 | $25.00 |
| 28 | Sign post reflector (630E08600) | EACH | 2 | $58.00 | $45.00 | $50.00 |
| 29 | Removal of ground mounted sign and reerection (630E85100) | EACH | 7 | $90.00 | $85.00 | $150.00 |
| 30 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $25.00 | $15.00 | $25.00 |
| 31 | Edge line, 4" (644E00100) | MI | 0.24 | $8,500.00 | $7,340.00 | $7,340.00 |
| 32 | Lane line, 4" (644E00200) | MI | 0.24 | $4,600.00 | $4,015.00 | $4,015.00 |
| 33 | Center line (644E00300) | MI | 0.16 | $14,000 | $11,870 | $11,870 |
| 34 | Channelizing line, 8" (644E00400) | FT | 225 | $2.00 | $1.75 | $2.00 |
| 35 | Stop line (644E00500) | FT | 85 | $9.00 | $7.50 | $8.00 |
| 36 | Chevron marking (644E00720) | FT | 80 | $8.50 | $7.25 | $7.00 |
| 37 | Lane arrow (644E01300) | EACH | 2 | $230.00 | $200.00 | $200.00 |
| 38 | Removal of pavement marking (644E30000) | FT | 1,118 | $3.00 | $2.60 | $3.00 |
| 39 | Edge line, 4" (646E10000) | MI | 0.23 | $19,000 | $16,025 | $16,025 |
| 40 | Edge line, 6" (646E10010) | MI | 0.03 | $24,000 | $20,490 | $20,490 |
| 41 | Lane line, 4" (646E10100) | MI | 0.23 | $12,250 | $10,595 | $10,595 |
| 42 | Lane line, 6" (646E10110) | MI | 0.01 | $13,500 | $11,685 | $11,685 |
| 43 | Center line (646E10200) | MI | 0.25 | $28,500 | $24,990 | $24,990 |
| 44 | Channelizing line, 8" (646E10300) | FT | 100 | $5.75 | $5.00 | $5.00 |
| 45 | Transverse/diagonal line (646E10600) | FT | 250 | $17.25 | $15.00 | $15.00 |
| 46 | Removal of pavement marking (646E50100) | FT | 1,427 | $3.00 | $2.50 | $3.00 |
| 47 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $140.00 | $95.00 | $85.00 |
| 48 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 3 | $2,765.00 | $2,400.00 | $2,850.00 |
| 49 | Detour signing (614E12420) | LS | 1 | $35,000 | $35,000 | $40,590 |
| 50 | Barrier reflector, type 2 (uni-directional) (614E13312) | EACH | 20 | $16.00 | $14.00 | $11.00 |
| 51 | Object marker, two way (614E13360) | EACH | 20 | $21.00 | $18.00 | $13.00 |
| 52 | Portable changeable message sign, as per plan (614E18601) | SNMT | 7 | $805.00 | $700.00 | $1,180.00 |
| 53 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.20 | $1,650.00 | $1,435.00 | $1,435.00 |
| 54 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 5 | $1,250.00 | $1,085.00 | $1,085.00 |
| 55 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.16 | $9,500.00 | $8,100.00 | $8,100.00 |
| 56 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 316 | $0.90 | $0.75 | $1.00 |
| 57 | Work zone stop line, class I, 642 paint (614E26200) | FT | 28 | $5.25 | $4.50 | $5.00 |
| 58 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 17 | $86.25 | $75.00 | $75.00 |
| 59 | Portable barrier, unanchored (622E41100) | FT | 1,200 | $33.50 | $29.00 | $17.00 |
| 60 | Special - asbestos abatement: work involving asbes (690E71000) | LS | 1 | $1,000.00 | $2,000.00 | $500.00 |
| 61 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $18,000 | $75,000 | $23,982 |
| 62 | Uncoated steel reinforcement (509E25000) | LB | 789 | $6.00 | $2.75 | $4.00 |
| 63 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 104 | $55.00 | $85.00 | $22.00 |
| 64 | Class QC1 concrete, pier (511E43210) | CY | 8 | $3,500.00 | $7,500.00 | $7,571.00 |
| 65 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 168 | $40.50 | $35.00 | $32.00 |
| 66 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 168 | $30.00 | $25.00 | $35.00 |
| 67 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $33,000 | $45,000 | $31,267 |
| 68 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $2,250.00 | $20,000 | $2,662.00 |
| 69 | Uncoated steel reinforcement (509E25000) | LB | 72 | $8.00 | $21.00 | $13.00 |
| 70 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 12 | $65.00 | $115.00 | $21.00 |
| 71 | Class QC1 concrete, abutment (511E45710) | CY | 0.53 | $18,000 | $15,000 | $11,563 |
| 72 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 8 | $40.50 | $35.00 | $75.00 |
| 73 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 6 | $30.00 | $25.00 | $35.00 |
| 74 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $12,000 | $10,000 | $17,383 |
| 75 | Elastomeric strip seal without steel extrusions (516E01300) | FT | 68 | $180.00 | $150.00 | $85.00 |
| 76 | Preformed elastomeric compression joint seal (516E10000) | FT | 68 | $155.00 | $25.00 | $34.00 |
| 77 | Vertical extension of structural expansion joint, as per plan (516E11801) | FT | 68 | $425.00 | $425.00 | $333.00 |
| 78 | Deep beam bridge retrofit railing, as per plan (517E75601) | FT | 176 | $185.00 | $128.00 | $124.00 |
| 79 | Superplasticized dense concrete overlay using hydrodemolition (848E10200) | SY | 454 | $175.00 | $110.00 | $102.00 |
| 80 | Surface preparation using hydrodemolition (848E20000) | SY | 454 | $155.00 | $135.00 | $100.00 |
| 81 | Superplasticized dense concrete overlay (variable thickness), material only (848E30200) | CY | 13 | $400.00 | $350.00 | $384.00 |
| 82 | Hand chipping (848E50000) | SY | 4 | $350.00 | $250.00 | $2,189.00 |
| 83 | Test slab (848E50100) | LS | 1 | $2,500.00 | $8,000.00 | $5,615.00 |
| 84 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $100,000 | $130,000 | $82,480 |
| 85 | Concrete reinforcement, replacement of existing concrete reinforcement, as per plan (509E20001) | LB | 200 | $6.00 | $10.00 | $4.00 |
| 86 | Uncoated steel reinforcement (509E25000) | LB | 2,128 | $5.00 | $8.00 | $5.00 |
| 87 | Class QC2 concrete, superstructure (511E34410) | CY | 28 | $3,000.00 | $3,000.00 | $2,502.00 |
| 88 | Sealing of concrete surfaces (epoxy-urethane), as per plan (512E10101) | SY | 252 | $40.25 | $35.00 | $28.00 |
| 89 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 225 | $30.00 | $25.00 | $35.00 |
| 90 | Preformed elastomeric compression joint seal (516E10000) | FT | 115 | $125.00 | $25.00 | $35.00 |
| 91 | Structural expansion joint including elastomeric strip seal, as per plan (516E11211) | FT | 131 | $975.00 | $2,000.00 | $3,103.00 |
| 92 | Patching concrete bridge deck - type C (519E12304) | SY | 18 | $700.00 | $590.00 | $837.00 |
| 93 | Patching concrete bridge deck - type B (519E12300) | SY | 21 | $550.00 | $500.00 | $771.00 |
| 102 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $1,000.00 | $525.00 | $16,182 |
| 103 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $50,000 | $10,000 | $10,064 |
| 104 | Maintaining traffic (614E11000) | LS | 1 | $135,000 | $150,000 | $31,706 |
| 105 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $10,000 | $14,000 | $6,500.00 |
| 106 | Mobilization (624E10000) | LS | 1 | $40,000 | $88,500 | $80,562 |
| 200 | Refurbish bearing device, as per plan (516E45305) | EACH | 8 | $8,500.00 | $3,820.00 | $6,478.00 |
| 201 | Special - composite fiber wrap system (519E00100) | SF | 4,465 | $30.00 | $40.00 | $65.00 |
| 202 | Concrete repair by epoxy injection (512E10600) | FT | 30 | $175.00 | $150.00 | $172.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.