ODOT contract 250047 bid tabulation

FAI-SR 204-02.28 (INTERSECTION). Let by Ohio DOT on January 30, 2025, FAI. 5 bids received; low bid $842,043 by Shelly Company, +0.7% against the engineer's estimate of $836,000.

Owner
Ohio DOT
Letting
30 JAN 2025
Pay items
100
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Shelly Company$842,043Low+1.0%
2Axis Civil Construction LLC$863,880+3.0%+3.0%
3Strawser Paving Co Inc$931,073+11%+11%
4Decker Construction Company$979,852+16%+17%
5Double Z Construction Company$1,044,233+24%+25%
ODOT contract 250047: bids by rank

Engineer's estimate: $836,000.

Bid tabulation

LinePay itemUnitQuantity1. Shelly Company2. Axis Civil Construction LLC3. Strawser Paving Co Inc4. Decker Construction Company5. Double Z Construction Company
1Clearing and grubbing (201E11000)LS1$13,750$10,000$14,500$10,000$40,000
2Pavement removed (202E23000)SY781$16.35$12.00$23.00$21.34$34.00
3Pipe removed, 24" and under (202E35100)FT113$52.75$22.00$31.00$67.31$15.00
4Mailbox removed (202E53100)EACH7$69.75$150.00$60.00$116.85$80.00
5Valve box removed (202E75610)EACH5$190.00$250.00$130.00$1,105.92$250.00
6Removal misc.: - (2) 2' X 2' brick pillars, stone (202E98000)LS1$380.00$1,500.00$1,400.00$2,283.84$800.00
7Removal misc.: (2) signs (202E98000)LS1$380.00$400.00$95.00$177.42$250.00
8Removal misc.: flower bed (202E98100)EACH2$190.00$400.00$700.00$534.96$300.00
9Excavation (203E10000)CY692$43.50$36.00$50.00$69.27$54.00
10Embankment (203E20000)CY131$36.75$36.00$105.00$125.29$50.00
11Subgrade compaction (204E10000)SY1,850$2.80$3.00$3.00$2.43$11.00
12Special - geocell, subgrade - 6" (204E60000)SY1,558$2.15$4.20$7.00$6.00$12.00
13Preconstruction survey monument verification and report (623E50000)LS1$2,750.00$1,500.00$550.00$2,000.00$1,500.00
14Post construction survey monument verification and report (623E51000)LS1$9,000.00$1,500.00$550.00$2,000.00$1,500.00
15Special - reinforced mesh for transverse and/or longitudinal joints and cracks (690E12050)SY886$27.50$15.00$18.00$15.00$27.50
16Special - mailbox support system, single (690E50100)EACH3$195.00$200.00$200.00$293.88$285.00
17Special - mailbox support system, multiple (690E50300)EACH1$420.00$250.00$250.00$743.88$495.00
18Rock channel protection, type C with filter (601E32200)CY1$1,000.00$250.00$1,025.00$486.96$350.00
19Seeding and mulching, class 2 (659E00510)SY2,446$2.01$1.50$1.50$3.65$3.50
20Commercial fertilizer (659E20000)TON0.30$888.40$1,250.00$1,250.00$787.50$750.00
21Lime (659E31000)ACRE0.50$156.50$150.00$150.00$20.50$20.00
22Water (659E35000)MGAL13.20$1.00$1.00$1.00$100.00$9.00
23Erosion control (832E30000)EACH10,000$1.00$1.00$1.00$1.00$1.00
24Aggregate drains (605E31100)FT180$11.00$15.00$40.00$34.93$24.00
256" conduit, type E (611E01400)FT50$18.00$25.00$13.00$26.44$8.00
266" conduit, type F (611E01500)FT50$18.00$25.00$13.00$23.08$8.00
2712" conduit, type C (611E04600)FT325$54.25$65.00$125.00$106.37$135.00
2815" conduit, type A (611E05700)FT112$106.00$125.00$160.00$142.20$175.00
29Catch basin, no. 2-2B (611E98470)EACH2$2,800.00$3,600.00$5,000.00$3,289.92$4,000.00
30Full depth pavement sawing (252E01500)FT1,594$2.45$2.60$2.00$3.60$3.50
31Pavement planing, asphalt concrete - variable dept (254E01000)SY2,135$6.20$6.10$5.25$6.28$6.20
32Asphalt concrete base, PG64-22, (449) (301E56000)CY251$205.00$258.00$235.00$279.32$228.00
33Asphalt concrete base, PG64-22, (449), (driveways) (301E56100)CY21$325.00$258.00$410.00$648.16$340.00
34Aggregate base (304E20000)CY256$68.00$115.00$110.00$94.18$125.00
35Non-tracking tack coat (407E20000)GAL446$3.90$6.00$4.40$4.90$3.90
36Prime coat, as per plan (408E10001)GAL122$5.00$6.00$4.80$5.00$5.00
37Stabilized crushed aggregate (411E10000)CY260$85.00$115.00$110.00$93.52$150.00
38Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100)CY118$274.00$330.00$280.00$327.82$300.00
39Asphalt concrete intermediate course, type 2, (449) (441E70300)CY160$191.00$280.00$225.00$289.32$214.00
40Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY8$635.00$450.00$1,000.00$676.66$650.00
41Compacted aggregate, as per plan (617E10101)CY34$170.00$145.00$225.00$228.20$170.00
42Valve box, as per plan (638E07609)EACH5$1,700.00$750.00$425.00$3,468.96$750.00
43Fire hydrant extended and adjusted to grade, as per plan (638E10301)EACH1$2,900.00$5,500.00$4,500.00$1,535.52$5,500.00
44Fire hydrant adjusted to grade, as per plan (638E10401)EACH1$2,600.00$2,200.00$4,000.00$6,730.56$1,000.00
45RPM (621E00100)EACH30$125.00$125.00$116.00$126.00$120.00
46Raised pavement marker removed (621E54000)EACH27$6.25$40.00$2.00$10.48$20.00
47Ground mounted support, no. 3 post, as per plan (630E03101)FT110$21.40$20.00$19.36$40.30$21.40
48Sign post reflector (630E08600)EACH3$45.00$50.00$68.46$194.25$45.00
49Sign, flat sheet (630E80100)SF54.25$32.00$25.00$22.59$46.20$32.00
50Removal of ground mounted sign and disposal (630E84900)EACH8$15.00$40.00$16.09$99.75$15.00
51Removal of ground mounted post support and disposal (630E86002)EACH8$20.00$40.00$21.46$99.75$20.00
52Edge line, 6" (644E00104)MI0.29$9,555.00$9,555.00$8,100.00$10,033$9,555.00
53Center line (644E00300)MI0.20$12,650$12,650$8,100.00$13,283$12,650
54Channelizing line, 8" (644E00400)FT118$2.50$2.50$1.50$2.60$2.50
55Stop line (644E00500)FT72$9.00$9.00$6.00$9.45$9.00
56Transverse/diagonal line (644E00700)FT210$8.30$8.30$6.00$8.70$8.30
57Island marking (644E00900)SF57$3.50$3.50$9.00$3.65$3.50
58Lane arrow (644E01300)EACH2$110.00$110.00$90.00$115.50$110.00
59Word on pavement, 72" (644E01400)EACH1$150.00$150.00$275.00$157.50$150.00
60Conduit, 2", 725.05 (625E25402)FT20$11.00$14.00$32.00$11.35$14.00
61Conduit, 4", 725.05 (625E25602)FT10$27.00$24.00$64.00$27.85$24.00
62Trench, 24" deep (625E29002)FT10$11.00$45.00$26.00$11.35$45.00
63Pull box, 725.08, 24" (625E30706)EACH1$1,550.00$1,400.00$2,900.00$1,596.50$1,400.00
64Ground rod (625E32000)EACH5$300.00$275.00$400.00$309.00$275.00
65Arc flash calculations and label - controller (625E76000)EACH1$2,100.00$3,500.00$3,850.00$2,163.00$3,500.00
66Sign hanger assembly, span wire (630E79000)EACH1$485.00$540.00$272.94$1,155.00$485.00
67Sign support assembly, pole mounted (630E79500)EACH4$235.00$180.00$129.56$383.25$235.00
68Sign, flat sheet (630E80100)SF14$32.50$32.00$22.59$69.30$32.50
69Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan (632E05007)EACH5$950.00$1,250.00$1,110.00$978.50$1,250.00
70Vehicular signal head, (LED), 4-section, 12" lens, 1-way, polycarbonate, as per plan (632E05065)EACH2$1,425.00$1,750.00$1,670.00$1,467.75$1,750.00
71Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate, as per plan (632E05087)EACH1$1,600.00$2,000.00$1,980.00$1,648.00$2,000.00
72Covering of vehicular signal head (632E25000)EACH8$40.00$40.00$130.00$41.20$40.00
73Messenger wire, 7 strand, 7/16" diameter with accessories (632E30300)FT307$27.00$25.00$21.50$27.85$25.00
74Tether wire, with accessories (632E30600)FT307$33.00$20.00$32.00$34.00$20.00
75Signal cable, 7 conductor, no. 14 AWG (632E40700)FT588$3.25$3.25$5.00$3.35$3.25
76Strain pole foundation (632E64000)EACH4$8,000.00$8,750.00$6,985.00$8,240.00$8,750.00
77Power cable, 3 conductor, no. 8 AWG (632E67300)FT55$5.00$6.40$7.30$5.15$6.40
78Service cable, 3 conductor, no. 8 AWG (632E69700)FT46$5.00$7.00$4.50$5.15$7.00
79Power service, as per plan (632E70001)EACH1$4,100.00$1,250.00$2,300.00$4,223.00$1,250.00
80Strain pole, type TC-81.11, design 10 (632E86130)EACH4$12,000$9,900.00$11,100$12,360$9,900.00
81Removal of traffic signal installation, as per plan (632E90101)EACH1$3,500.00$1,600.00$5,300.00$3,605.00$1,600.00
82Cabinet, type 332, as per plan (633E65521)EACH1$18,000$17,000$20,300$18,540$17,000
83Cabinet foundation, as per plan (633E67101)EACH1$3,650.00$3,100.00$5,280.00$3,759.50$3,100.00
84Controller work pad, as per plan (633E67201)EACH1$1,700.00$750.00$715.00$1,751.00$750.00
85Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001)EACH1$8,200.00$7,700.00$7,900.00$8,446.00$7,700.00
86Advance radar detection, as per plan (809E69001)EACH2$8,550.00$9,850.00$9,550.00$8,806.50$9,850.00
87Stop line radar detection, as per plan (809E69101)EACH3$8,400.00$9,550.00$9,900.00$8,652.00$9,550.00
88Atc controller, as per plan (809E69123)EACH1$811.68$935.00$1,850.00$836.05$935.00
89Traffic compacted surface, type A (410E10000)CY50$89.00$65.00$75.00$60.00$45.00
90Traffic compacted surface, type B (410E11000)CY50$89.00$65.00$75.00$60.00$45.00
91Detour signing (614E12420)LS1$3,500.00$3,500.00$9,000.00$10,149$20,000
92Asphalt concrete for maintaining traffic (614E13000)CY10$265.00$200.00$600.00$680.00$200.00
93Portable changeable message sign, as per plan (614E18601)SNMT12$1,600.00$1,200.00$900.00$935.55$1,000.00
94Water (616E10000)MGAL1$1.00$1.00$50.00$100.00$100.00
95Premium for contract performance bond and for payment bond (103E05000)LS1$5,000.00$6,500.00$6,000.00$3,500.00$7,000.00
96Maintaining traffic (614E11000)LS1$17,500$20,000$20,000$10,000$18,000
97Field office, type B (619E16010)MNTH4$2,500.00$1,650.00$3,500.00$2,000.00$2,000.00
98Construction layout stakes and surveying, as per plan (623E10001)LS1$5,000.00$15,000$6,500.00$10,000$15,900
99Mobilization (624E10000)LS1$37,250$20,000$20,000$17,000$45,000
100Special - calendar days of contract time for opening to traffic (unit price field should reflect number of days bid) (614E15000)DLR3,500$40.00$45.00$45.00$46.00$50.00
ODOT contract 250047: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy