| 1 | Walk removed (202E30000) | SF | 3,650 | $12.00 | $12.00 |
| 2 | Walk removed, as per plan (202E30001) | SF | 812 | $12.00 | $12.00 |
| 3 | Curb removed (202E32000) | FT | 609 | $17.00 | $17.00 |
| 4 | Curb and gutter removed (202E32500) | FT | 279 | $20.00 | $20.00 |
| 5 | Excavation (203E10000) | CY | 5 | $200.00 | $250.00 |
| 6 | 4" concrete walk (608E10000) | SF | 1,404 | $20.00 | $20.00 |
| 7 | Curb ramp (608E52000) | SF | 2,806 | $20.00 | $20.00 |
| 8 | Detectable warning (608E53020) | SF | 88 | $50.00 | $50.00 |
| 9 | Monument assembly adjusted to grade (623E39500) | EACH | 32 | $994.72 | $800.00 |
| 10 | Topsoil (659E00300) | CY | 8 | $275.00 | $350.00 |
| 11 | Seeding and mulching (659E10000) | SY | 70 | $15.00 | $40.00 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.01 | $1,000.00 | $1,000.00 |
| 13 | Lime (659E31000) | ACRE | 0.01 | $1,000.00 | $100.00 |
| 14 | Water (659E35000) | MGAL | 0.39 | $10.00 | $1.00 |
| 15 | Erosion control (832E30000) | EACH | 2,000 | $1.00 | $1.00 |
| 16 | Catch basin adjusted to grade (611E98630) | EACH | 25 | $1,206.78 | $2,000.00 |
| 17 | Catch basin reconstructed to grade (611E98634) | EACH | 5 | $2,544.44 | $4,000.00 |
| 18 | Manhole adjusted to grade (611E99654) | EACH | 75 | $1,206.78 | $700.00 |
| 19 | Manhole reconstructed to grade (611E99660) | EACH | 5 | $2,401.73 | $3,000.00 |
| 20 | Pavement repair (253E02000) | CY | 760 | $566.34 | $495.00 |
| 21 | Pavement repair, as per plan (253E02001) | CY | 34 | $300.00 | $800.00 |
| 22 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 75,947 | $2.45 | $2.95 |
| 23 | Patching planed surface (254E01600) | SY | 764 | $4.52 | $5.00 |
| 24 | Non-tracking tack coat (407E20000) | GAL | 6,836 | $5.00 | $4.00 |
| 25 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 3,165 | $283.61 | $280.00 |
| 26 | Combination curb and gutter, type 2 (609E12000) | FT | 145 | $50.00 | $50.00 |
| 27 | Combination curb and gutter, type 3 (609E18000) | FT | 25 | $50.00 | $50.00 |
| 28 | Curb, type 6 (609E26000) | FT | 231 | $40.00 | $40.00 |
| 29 | Compacted aggregate (617E10100) | CY | 201 | $160.43 | $185.00 |
| 30 | Shoulder preparation (617E20000) | SY | 3,614 | $2.06 | $5.00 |
| 31 | Water (617E25000) | MGAL | 4 | $7.85 | $1.00 |
| 32 | Valve box adjusted to grade (638E10800) | EACH | 25 | $1,174.07 | $700.00 |
| 33 | RPM (621E00100) | EACH | 550 | $31.95 | $31.95 |
| 34 | Raised pavement marker removed (621E54000) | EACH | 550 | $12.78 | $10.00 |
| 35 | Edge line, 6" (644E00104) | MI | 5.57 | $3,645.00 | $3,645.00 |
| 36 | Lane line, 6" (644E00204) | MI | 2.31 | $1,780.00 | $1,780.00 |
| 37 | Center line (644E00300) | MI | 3.24 | $4,930.00 | $4,930.00 |
| 38 | Channelizing line, 12" (644E00404) | FT | 4,304 | $2.00 | $2.00 |
| 39 | Stop line (644E00500) | FT | 637 | $4.85 | $4.85 |
| 40 | Crosswalk line, 24" (644E00630) | FT | 1,617 | $4.75 | $4.75 |
| 41 | Transverse/diagonal line (644E00700) | FT | 1,663 | $4.60 | $4.60 |
| 42 | Chevron marking (644E00720) | FT | 67 | $4.60 | $4.60 |
| 43 | Island marking (644E00900) | SF | 164 | $4.45 | $4.45 |
| 44 | School symbol marking, 72" (644E01100) | EACH | 4 | $450.00 | $450.00 |
| 45 | Parking lot stall marking (644E01200) | FT | 226 | $1.75 | $1.75 |
| 46 | Lane arrow (644E01300) | EACH | 48 | $130.00 | $130.00 |
| 47 | Lane reduction arrow (644E01350) | EACH | 2 | $335.00 | $335.00 |
| 48 | Two way left turn arrow (644E01370) | EACH | 2 | $250.00 | $250.00 |
| 49 | Word on pavement, 72" (644E01400) | EACH | 4 | $275.00 | $275.00 |
| 50 | Dotted line, 6" (644E01510) | FT | 246 | $1.95 | $1.95 |
| 51 | Detector loop (632E26500) | EACH | 7 | $1,400.00 | $1,400.00 |
| 52 | Loop detector tie in (632E27200) | EACH | 7 | $100.00 | $100.00 |
| 53 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $137.41 | $90.00 |
| 54 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $950.00 | $950.00 |
| 55 | Work zone lane line, class I, 6" (614E20010) | MI | 2.31 | $195.00 | $195.00 |
| 56 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 2.31 | $150.00 | $150.00 |
| 57 | Work zone center line, class I (614E21000) | MI | 3.24 | $750.00 | $750.00 |
| 58 | Work zone center line, class III, 642 paint (614E21550) | MI | 3.24 | $550.00 | $550.00 |
| 59 | Work zone edge line, class I, 6" (614E22010) | MI | 5.57 | $525.00 | $525.00 |
| 60 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 5.57 | $315.00 | $315.00 |
| 61 | Work zone channelizing line, class I, 12" (614E23010) | FT | 4,304 | $0.60 | $0.60 |
| 62 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 4,304 | $0.55 | $0.55 |
| 63 | Work zone dotted line, class I (614E24000) | FT | 246 | $0.50 | $0.50 |
| 64 | Work zone dotted line, class III, 6", 642 paint (614E24612) | FT | 246 | $0.45 | $0.45 |
| 65 | Work zone transverse/diagonal line, class I (614E25000) | FT | 1,663 | $2.25 | $2.25 |
| 66 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 1,663 | $2.20 | $2.20 |
| 67 | Work zone stop line, class I (614E26000) | FT | 637 | $2.50 | $2.50 |
| 68 | Work zone stop line, class III, 642 paint (614E26610) | FT | 637 | $2.45 | $2.45 |
| 69 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 1,617 | $2.00 | $2.00 |
| 70 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 1,617 | $2.20 | $2.20 |
| 71 | Work zone arrow, class I (614E30000) | EACH | 48 | $55.00 | $55.00 |
| 72 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 48 | $50.00 | $50.00 |
| 73 | Work zone word on pavement, 72", class I (614E31000) | EACH | 4 | $65.00 | $65.00 |
| 74 | Work zone word on pavement, 72", class III, 642 paint (614E31620) | EACH | 4 | $60.00 | $60.00 |
| 75 | Work zone school symbol marking, 72", class I (614E31700) | EACH | 4 | $350.00 | $350.00 |
| 76 | Work zone school symbol marking, 72", class III, 6 (614E31740) | EACH | 4 | $345.00 | $345.00 |
| 77 | Work zone island marking, class I (614E32700) | SF | 164 | $2.00 | $2.00 |
| 78 | Work zone island marking, class III, 642 paint (614E32800) | SF | 164 | $1.95 | $1.95 |
| 79 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,652.81 | $8,979.86 |
| 80 | Maintaining traffic (614E11000) | LS | 1 | $150,060 | $255,000 |
| 81 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $7,436.04 | $24,000 |
| 82 | Mobilization (624E10000) | LS | 1 | $112,500 | $40,000 |