CLI-SR 350-07.91 (MINOR RECONSTRUCTION). Let by Ohio DOT on October 23, 2025, CLI. 2 bids received; low bid $5,985,706 by John R Jurgensen Company, -8.1% against the engineer's estimate of $6,515,000.

Owner
Ohio DOT
Letting
23 OCT 2025
Pay items
56
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1John R Jurgensen Company$5,985,706Low-8.0%
2Fillmore Construction$6,988,627+17%+7.0%
ODOT contract 250489: bids by rank

Engineer's estimate: $6,515,000.

Bid tabulation

LinePay itemUnitQuantity1. John R Jurgensen Company2. Fillmore Construction
2Guardrail removed (202E38000)FT475$2.50$6.00
3Anchor assembly removed, type A, as per plan (202E42001)EACH6$400.00$450.00
4Anchor assembly removed, type E (202E42010)EACH1$200.00$225.00
5Anchor assembly removed, type T (202E42040)EACH1$150.00$125.00
6Bridge terminal assembly removed (202E47000)EACH4$100.00$175.00
7Excavation (203E10000)CY446$63.48$60.00
8Linear grading (209E60500)MI8$1,726.34$2,500.00
9Preparing subgrade for shoulder paving (209E72050)MI8$1,726.34$1,200.00
10Guardrail, type MGS with long posts (606E15100)FT225$22.50$29.50
11Anchor assembly, MGS type E, MASH 2016 (606E26150)EACH7$2,500.00$2,600.00
12Anchor assembly, MGS type T (606E26550)EACH1$1,200.00$1,200.00
13Bridge terminal assembly, type 4, as per plan (606E35141)EACH4$1,450.00$1,450.00
14Inspection and compaction testing of unbound materials (878E25000)LS1$18,624$150,000
15Erosion control (832E30000)EACH2,000$1.00$1.00
16Pavement repair (253E02000)CY1,450$356.29$200.00
17Pavement planing, asphalt concrete, 1.5 inches (254E01000)SY314$4.98$30.00
18Pavement planing, asphalt concrete, 3 inches (254E01000)SY51,611$2.79$2.00
19Patching planed surface (254E01600)SY521$4.13$10.00
20Asphalt concrete base, PG64-22, (449) (301E56000)CY5,019$152.31$190.00
21Non-tracking tack coat (407E20000)GAL14,795$5.00$5.00
22Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000)CY4,076$218.18$210.00
23Asphalt concrete intermediate course, type 2, (446) (441E10200)CY6,981$179.65$200.00
24Compacted aggregate (617E10100)CY746$106.89$80.00
25Water (617E25000)MGAL16$7.28$100.00
26Rumble stripes, center line (asphalt concrete) (618E43000)MI7.44$935.00$1,400.00
27Pavement removed (827E10000)SY58,537$5.52$4.00
28Cement (827E11000)TON2,202$200.50$210.00
29Curing coat (827E12000)SY62,741$1.17$1.20
30Full depth reclaimed base course, 12 inches (827E20000)SY62,741$5.18$3.90
31Mixture design for full depth reclaimed base (827E21000)LS1$15,500$56,000
32Corrective material (827E22000)TON311$52.18$50.00
33Cover aggregate (827E23000)TON471$56.93$50.00
34Just-in-time training (827E30000)LS1$2,250.00$5,000.00
35Longitudinal joint preparation (874E21000)MI7.44$8,219.24$2,000.00
36RPM (621E00100)EACH578$37.00$37.00
37Raised pavement marker removed (621E54000)EACH578$11.99$20.00
38Barrier reflector, type 2, bidirectional (626E00110)EACH8$12.50$15.00
39Edge line, 6" (644E00104)MI15.88$3,800.00$4,180.00
40Center line (644E00300)MI7.94$5,770.00$6,347.00
41Stop line (644E00500)FT48$20.00$22.00
42Detour signing (614E12420)LS1$8,835.00$8,835.00
43Portable changeable message sign (614E18600)SNMT4$950.00$950.00
44Work zone center line, class I, 642 paint (614E21100)MI21.20$2,649.00$2,914.00
45Work zone center line, class III, 642 paint (614E21550)MI7.94$2,297.00$2,527.00
46Work zone edge line, class I, 6", 642 paint (614E22110)MI42.40$1,325.00$1,458.00
47Work zone edge line, class III, 6", 642 paint (614E22360)MI15.88$1,150.00$1,265.00
48Work zone stop line, class I, 642 paint (614E26200)FT138$5.00$5.00
49Work zone stop line, class III, 642 paint (614E26610)FT48$5.00$5.00
50Water (616E10000)MGAL4$159.25$1,000.00
51Deep beam bridge retrofit railing (517E75600)FT150$110.00$150.00
52Premium on railroads' protective public liability and property damage liability insurance (100E00300)LS1$5,000.00$7,500.00
53Premium for contract performance bond and for payment bond (103E05000)LS1$37,569$35,000
54Maintaining traffic (614E11000)LS1$169,712$850,000
55Construction layout stakes and surveying, as per plan (623E10001)LS1$22,985$47,600
56Mobilization (624E10000)LS1$300,000$550,000
100Proof rolling (204E45000)HR31$223.67$200.00
ODOT contract 250489: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 23, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy