ODOT contract 250581 bid tabulation
CLI-US 22-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on December 18, 2025, CLI. 3 bids received; low bid $1,981,865 by John R Jurgensen Company, -2.8% against the engineer's estimate of $2,040,000.
- Owner
- Ohio DOT
- Letting
- 18 DEC 2025
- Pay items
- 40
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $1,981,865 | Low | -3.0% |
| 2 | Barrett Paving Materials Inc | $2,291,000 | +16% | +12% |
| 3 | Fillmore Construction | $2,397,451 | +21% | +18% |
Engineer's estimate: $2,040,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Barrett Paving Materials Inc | 3. Fillmore Construction |
|---|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 6,692 | $2.00 | $2.00 | $2.00 |
| 2 | Anchor assembly removed, type A, as per plan (202E42001) | EACH | 24 | $250.00 | $295.00 | $350.00 |
| 3 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $150.00 | $150.00 | $150.00 |
| 4 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $150.00 | $75.00 | $100.00 |
| 5 | Guardrail, type MGS with long posts (606E15100) | FT | 6,075 | $20.86 | $21.00 | $24.80 |
| 6 | Anchor assembly, MGS type E, (MASH 2016) (606E26150) | EACH | 16 | $2,220.00 | $2,580.00 | $2,450.00 |
| 7 | Anchor assembly, MGS type E, (softstop) (606E26150) | EACH | 10 | $2,220.00 | $2,475.00 | $2,450.00 |
| 8 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 4 | $975.00 | $1,345.00 | $1,400.00 |
| 9 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 10 | Pavement repair (253E02000) | CY | 300 | $408.62 | $420.00 | $450.00 |
| 11 | Non-tracking tack coat (407E20000) | GAL | 12,230 | $4.00 | $3.00 | $5.00 |
| 12 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 4,718 | $203.21 | $220.00 | $245.00 |
| 13 | Compacted aggregate (617E10100) | CY | 470 | $138.89 | $150.00 | $100.00 |
| 14 | Shoulder preparation (617E20000) | SY | 8,460 | $1.62 | $1.00 | $2.00 |
| 15 | Water (617E25000) | MGAL | 9 | $7.23 | $20.00 | $100.00 |
| 16 | Rumble stripes, edge line (asphalt concrete) (618E40800) | FT | 14.42 | $950.00 | $1,775.00 | $1,000.00 |
| 17 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 7.21 | $950.00 | $1,925.00 | $1,000.00 |
| 18 | Longitudinal joint preparation (874E21000) | MI | 7.21 | $3,166.28 | $1,600.00 | $6,000.00 |
| 19 | Pavement planing, asphalt concrete, class A, 1 inc (897E01010) | SY | 135,888 | $1.00 | $3.00 | $2.00 |
| 20 | Patching planed surface (897E02000) | SY | 1,366 | $5.44 | $5.00 | $5.00 |
| 21 | RPM (621E00100) | EACH | 485 | $40.00 | $47.47 | $40.00 |
| 22 | Raised pavement marker removed (621E54000) | EACH | 485 | $11.46 | $5.00 | $10.00 |
| 23 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 79 | $11.00 | $12.00 | $12.00 |
| 24 | Edge line, 6" (644E00104) | MI | 14.42 | $3,800.00 | $3,800.00 | $3,990.00 |
| 25 | Center line (644E00300) | MI | 7.29 | $2,600.00 | $2,600.00 | $2,730.00 |
| 26 | Transverse/diagonal line (644E00700) | FT | 48 | $26.70 | $26.70 | $28.10 |
| 27 | Island marking (644E00900) | SF | 30 | $20.00 | $20.00 | $21.00 |
| 28 | Edge line, 6" (646E10010) | MI | 0.10 | $24,200 | $24,200 | $25,410 |
| 29 | Center line (646E10200) | MI | 0.10 | $32,370 | $32,370 | $33,989 |
| 30 | Transverse/diagonal line (646E10600) | FT | 32 | $36.00 | $36.00 | $38.00 |
| 31 | Work zone center line, class I, 642 paint (614E21100) | MI | 2.65 | $1,695.00 | $1,695.00 | $1,780.00 |
| 32 | Work zone center line, class III, 642 paint (614E21550) | MI | 7.29 | $1,130.00 | $1,130.00 | $1,187.00 |
| 33 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 5.30 | $1,695.00 | $1,695.00 | $1,780.00 |
| 34 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 14.42 | $1,130.00 | $1,130.00 | $1,187.00 |
| 35 | Deep beam bridge retrofit railing (517E75600) | FT | 454 | $100.00 | $112.00 | $110.00 |
| 36 | Patching concrete bridge deck - type B (519E12300) | SY | 3 | $1,464.00 | $1,464.00 | $3,000.00 |
| 37 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,570.27 | $15,072 | $12,500 |
| 38 | Maintaining traffic (614E11000) | LS | 1 | $72,041 | $75,000 | $88,000 |
| 39 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $4,562.25 | $7,500.00 | $7,500.00 |
| 40 | Mobilization (624E10000) | LS | 1 | $95,000 | $25,000 | $75,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 18, 2025. Compiled by Mirage Metrics.