ODOT contract 260154 bid tabulation
LAW-US 52-21.52 (INTERSECTION). Let by Ohio DOT on March 26, 2026, LAW. 2 bids received; low bid $2,110,991 by Shelly Company, +34% against the engineer's estimate of $1,579,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 122
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $2,110,991 | Low | +34% |
| 2 | Axis Civil Construction LLC | $2,519,261 | +19% | +60% |
Engineer's estimate: $1,579,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $35,000 | $15,000 |
| 2 | Pavement removed (202E23000) | SY | 3,390 | $32.50 | $18.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 804 | $18.25 | $38.00 |
| 4 | Pipe removed, over 24" diameter (202E35200) | FT | 38 | $38.35 | $42.00 |
| 5 | Guardrail removed (202E38000) | FT | 1,189 | $2.00 | $10.00 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 1 | $182.00 | $900.00 |
| 7 | Anchor assembly removed, type T (202E42040) | EACH | 5 | $95.00 | $900.00 |
| 8 | Special - parking block removed (202E52990) | EACH | 6 | $54.00 | $100.00 |
| 9 | Catch basin removed (202E58100) | EACH | 3 | $730.00 | $2,000.00 |
| 10 | Fence removed (202E75000) | FT | 288 | $3.00 | $6.00 |
| 11 | Removal misc.: private sign (202E98100) | EACH | 2 | $160.00 | $2,000.00 |
| 12 | Excavation (203E10000) | CY | 1,033 | $44.00 | $75.00 |
| 13 | Embankment (203E20000) | CY | 4,521 | $60.00 | $55.00 |
| 14 | Granular material, type C (203E35120) | CY | 1,846 | $84.00 | $128.00 |
| 15 | Subgrade compaction (204E10000) | SY | 5,537 | $1.50 | $4.00 |
| 16 | Excavation of subgrade (204E13000) | CY | 1,846 | $43.00 | $55.00 |
| 17 | Proof rolling (204E45000) | HR | 3 | $260.00 | $300.00 |
| 18 | Geotextile fabric (204E50000) | SY | 5,537 | $1.25 | $2.00 |
| 19 | Guardrail, type MGS (606E15050) | FT | 100 | $21.60 | $27.00 |
| 20 | Guardrail, type MGS with long posts (606E15100) | FT | 975 | $25.20 | $30.00 |
| 21 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $1,640.00 | $1,850.00 |
| 22 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 1 | $2,860.00 | $2,800.00 |
| 23 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,380.00 | $1,500.00 |
| 24 | Fence, type 47 (607E15000) | FT | 366 | $28.50 | $28.00 |
| 25 | Right-of-way monument, type B (623E40520) | EACH | 1 | $465.00 | $500.00 |
| 26 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,900.00 | $1,600.00 |
| 27 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,900.00 | $1,600.00 |
| 28 | Riprap, type D (601E11000) | SY | 9 | $570.00 | $450.00 |
| 29 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 64 | $95.00 | $110.00 |
| 30 | Rock channel protection, type A with filter (601E32000) | CY | 25 | $135.00 | $145.00 |
| 31 | Topsoil (659E00300) | CY | 213 | $110.00 | $70.00 |
| 32 | Seeding and mulching (659E10000) | SY | 567 | $2.00 | $6.00 |
| 33 | Repair seeding and mulching (659E14000) | SY | 29 | $2.20 | $6.00 |
| 34 | Commercial fertilizer (659E20000) | TON | 0.08 | $1,400.00 | $1,250.00 |
| 35 | Lime (659E31000) | ACRE | 0.12 | $450.00 | $150.00 |
| 36 | Water (659E35000) | MGAL | 4 | $1.00 | $1.00 |
| 37 | Slope erosion protection (670E00500) | SY | 1,343 | $2.00 | $2.00 |
| 38 | Ditch erosion protection mat, type B (670E00720) | SY | 222 | $2.00 | $3.00 |
| 39 | Storm water pollution prevention plan (832E15000) | LS | 1 | $1,950.00 | $2,000.00 |
| 40 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $2,900.00 | $6,750.00 |
| 41 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $8,225.00 | $9,000.00 |
| 42 | Erosion control (832E30000) | EACH | 35,000 | $1.00 | $1.00 |
| 43 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 43 | $3.45 | $12.00 |
| 44 | Concrete masonry (602E20000) | CY | 4.30 | $2,045.00 | $3,800.00 |
| 45 | 6" shallow pipe underdrains (605E11100) | FT | 1,722 | $14.75 | $28.00 |
| 46 | 6" base pipe underdrains (605E14000) | FT | 929 | $18.00 | $28.00 |
| 47 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 306 | $32.00 | $45.00 |
| 48 | 12" conduit, type B (611E04400) | FT | 70 | $159.00 | $120.00 |
| 49 | 12" conduit, type C (611E04600) | FT | 67 | $128.00 | $120.00 |
| 50 | 15" conduit, type B (611E05900) | FT | 6 | $385.00 | $350.00 |
| 51 | 15" conduit, type C (611E06100) | FT | 26 | $286.00 | $225.00 |
| 52 | 18" conduit, type C (611E07600) | FT | 235 | $143.50 | $125.00 |
| 53 | 36" conduit, type B (611E16400) | FT | 14 | $286.00 | $490.00 |
| 54 | 36" conduit, type C (611E16600) | FT | 24 | $325.00 | $490.00 |
| 55 | 84" conduit, type A, 707.02 (0.218), 707.02 (alumi (611E28000) | FT | 11 | $1,010.00 | $1,500.00 |
| 56 | Field paving of existing pipe type A, 84" (611E96550) | FT | 11 | $700.00 | $700.00 |
| 57 | Catch basin, no. 3 (611E98150) | EACH | 2 | $9,175.00 | $9,000.00 |
| 58 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $3,015.00 | $5,000.00 |
| 59 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $5,450.00 | $7,000.00 |
| 60 | Manhole, no. 3 (611E99574) | EACH | 4 | $9,050.00 | $7,500.00 |
| 61 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $450.00 | $700.00 |
| 62 | Pavement planing, asphalt concrete (3.25") (254E01000) | SY | 601 | $25.50 | $25.00 |
| 63 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 858 | $260.00 | $370.00 |
| 64 | Aggregate base (304E20000) | CY | 886 | $82.25 | $155.00 |
| 65 | Aggregate base (304E20000) | CY | 46 | $102.00 | $170.00 |
| 66 | Tack coat (407E10000) | GAL | 12 | $2.50 | $2.50 |
| 67 | Non-tracking tack coat (407E20000) | GAL | 639 | $4.10 | $4.10 |
| 68 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 8 | $440.00 | $445.00 |
| 69 | Asphalt concrete intermediate course, type 2, (449), (driveways) (441E70700) | CY | 11 | $360.00 | $414.00 |
| 70 | Asphalt concrete surface course, 12.5 MM, type A (448) (442E20000) | CY | 235 | $355.00 | $414.00 |
| 71 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 275 | $345.00 | $444.00 |
| 72 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 75 | $151.50 | $270.00 |
| 73 | Curb, type 6 (609E26000) | FT | 87 | $84.00 | $70.00 |
| 74 | Curb, type 8 (609E30000) | FT | 45 | $125.00 | $80.00 |
| 75 | RPM (621E00100) | EACH | 37 | $42.00 | $135.00 |
| 76 | Ground mounted support, no. 2 post (630E02100) | FT | 76 | $18.00 | $15.00 |
| 77 | Ground mounted support, no. 3 post (630E03100) | FT | 126 | $20.50 | $18.50 |
| 78 | Ground mounted support, no. 4 post (630E04100) | FT | 42 | $25.50 | $22.00 |
| 79 | Sign, flat sheet (630E80100) | SF | 78.50 | $28.00 | $28.00 |
| 80 | Removal of ground mounted sign and disposal (630E84900) | EACH | 14 | $15.00 | $30.00 |
| 81 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $70.00 | $150.00 |
| 82 | Removal of ground mounted post support and disposal (630E86002) | EACH | 17 | $20.00 | $30.00 |
| 83 | Edge line, 6" (644E00104) | MI | 1.06 | $3,500.00 | $3,500.00 |
| 84 | Lane line, 6" (644E00204) | MI | 0.38 | $2,100.00 | $2,100.00 |
| 85 | Center line (644E00300) | MI | 0.19 | $6,000.00 | $6,000.00 |
| 86 | Channelizing line, 12" (644E00404) | FT | 995 | $2.80 | $2.80 |
| 87 | Stop line (644E00500) | FT | 140 | $10.00 | $10.00 |
| 88 | Transverse/diagonal line (644E00700) | FT | 130 | $8.00 | $8.00 |
| 89 | Lane arrow (644E01300) | EACH | 15 | $110.00 | $110.00 |
| 90 | Bracket arm, 30' (625E18510) | EACH | 2 | $3,500.00 | $3,500.00 |
| 91 | No. 8 AWG 600 volt distribution cable (625E23304) | FT | 686 | $5.00 | $5.00 |
| 92 | No. 10 AWG pole and bracket cable (625E23400) | FT | 573 | $2.75 | $2.75 |
| 93 | Luminaire, conventional, solid state (LED), type I (625E26252) | EACH | 2 | $500.00 | $500.00 |
| 94 | Ground rod (625E32000) | EACH | 2 | $400.00 | $400.00 |
| 95 | Tether wire, with accessories (632E30600) | FT | 439 | $30.00 | $30.00 |
| 96 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 686 | $5.00 | $5.00 |
| 97 | Signal support foundation (632E64010) | EACH | 2 | $12,000 | $12,000 |
| 98 | Test hole performed (632E64950) | EACH | 1 | $3,600.00 | $3,600.00 |
| 99 | Combination strain pole, type TC-81.11, design 13 (632E87150) | EACH | 2 | $19,000 | $19,000 |
| 100 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 1 | $20,000 | $20,000 |
| 101 | Reuse of vehicular signal head (632E90200) | EACH | 1 | $600.00 | $600.00 |
| 102 | Signalization, misc.: partial span wire installati (632E90300) | LS | 1 | $20,000 | $20,000 |
| 103 | Signalization, misc.: unlash and relash messenger (632E90300) | LS | 1 | $1,000.00 | $1,000.00 |
| 104 | Advance radar detection, as per plan (809E69001) | EACH | 1 | $10,500 | $10,500 |
| 105 | Stop line radar detection, as per plan (809E69101) | EACH | 2 | $10,000 | $10,000 |
| 106 | Impact attenuator, type 1 (bidirectional) (606E60012) | EACH | 1 | $2,034.69 | $7,500.00 |
| 107 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $80.00 | $65.00 |
| 108 | Detour signing (614E12420) | LS | 1 | $14,250 | $14,250 |
| 109 | Asphalt concrete for maintaining traffic (614E13000) | CY | 35 | $385.00 | $400.00 |
| 110 | Maintaining traffic, misc.: business entrance sign (614E18000) | EACH | 3 | $125.00 | $125.00 |
| 111 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $1,700.00 | $1,600.00 |
| 112 | Work zone center line, class I (614E21000) | MI | 0.07 | $2,500.00 | $15,250 |
| 113 | Work zone edge line, class I, 6" (614E22010) | MI | 0.62 | $2,500.00 | $8,875.00 |
| 114 | Work zone edge line, class I, 6" (614E22010) | MI | 0.49 | $2,500.00 | $8,875.00 |
| 115 | Work zone channelizing line, class I, 8" (614E23000) | FT | 2,485 | $1.00 | $2.25 |
| 116 | Water (616E10000) | MGAL | 1 | $1.00 | $1.00 |
| 117 | Portable barrier, unanchored, as per plan (622E41101) | FT | 935 | $29.25 | $48.00 |
| 118 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $7,500.00 | $20,000 |
| 119 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $131,500 | $75,000 |
| 120 | Field office, type A (619E16000) | MNTH | 4 | $2,000.00 | $4,000.00 |
| 121 | Construction layout stakes and surveying (623E10000) | LS | 1 | $19,500 | $20,000 |
| 122 | Mobilization (624E10000) | LS | 1 | $50,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.