TDOT contract CNZ137 bid tabulation

The resurfacing on s.r. 61 from s.r. 62 (l.m. 3.04) to s.r. 95 (l.m. 10.14). Let by Tennessee DOT on May 9, 2025, Anderson County. 1 bid received; low bid $1,545,000 by Rogers Group, Inc..

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
25
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$1,545,000Low
TDOT contract CNZ137: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.
1Brooming & degrassing shoulders (208-01.05)LM15$1,260.00
2Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON1,338$138.00
3Bituminous material for tack coat (TC) (403-01)TON107$900.00
4Acs mix(PG70-22) thin lift D asphalt (411-03.13)TON6,653$135.00
5Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM15$690.00
6Cold planing bituminous pavement (415-01.02)SY1,794$8.00
7Guardrail transition 27IN to 31IN (705-02.10)EACH17$87.00
8Earth pad for type 38 GR end treatment (705-04.09)EACH15$882.00
9GR terminal (in-inline) MASH TL-3 (705-06.11)EACH2$917.00
10Tangent energy absorbing term MASH TL-3 (705-06.20)EACH15$3,248.00
11Radius rail (706-06.03)LF50$35.00
12Rounded end element (706-10.26)EACH2$101.00
13Traffic control (712-01)LS1$46,933
14Signs (construction) (712-06)SF893$9.00
15Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH421$41.00
16Removal of snowplowable reflective marker (716-01.30)EACH421$10.50
17Plastic pavement marking(channelization striping) (716-02.04)SY45$25.00
18Plastic pavement marking (stop line) (716-02.05)LF300$12.50
19Plastic pavement marking (turn lane arrow) (716-02.06)EACH12$260.00
20Plastic word pavement marking (school) (716-03.04)EACH2$455.00
21Plastic pavement marking (transverse shoulder) (716-04.04)LF242$5.00
22Painted pavement marking (6" line) (716-05.20)LM12$1,120.00
23Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM29$3,610.00
24Spray thermo PVMT MRKNG (60 mil) (6IN dotted line) (716-13.05)LF150$1.25
25Mobilization (717-01)LS1$50,000
TDOT contract CNZ137: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy