TDOT contract CNZ199 bid tabulation
The resurfacing on various local roads used for the i-26 detour (hurricane helene). Let by Tennessee DOT on June 27, 2025, Unicoi County. 1 bid received; low bid $652,855 by Summers-Taylor, Inc..
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 18
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Summers-Taylor, Inc. | $652,855 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Summers-Taylor, Inc. |
|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 1.10 | $14,055 |
| 2 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 43 | $593.15 |
| 3 | Bituminous material for tack coat (TC) (403-01) | TON | 2.80 | $1,310.44 |
| 4 | Acs mix(PG64-22) grading D (411-01.10) | TON | 426 | $301.39 |
| 5 | Cold planing bituminous pavement (415-01.02) | SY | 6,436 | $10.69 |
| 6 | Concrete sidewalk (6 ") (701-01.02) | SF | 800 | $57.48 |
| 7 | Concrete curb ramp (retrofit) (701-02.01) | SF | 2,800 | $72.13 |
| 8 | Concrete curb (702-01) | CY | 1 | $5,633.33 |
| 9 | Concrete combined curb & gutter (702-03) | CY | 7 | $1,820.85 |
| 10 | Traffic control (712-01) | LS | 1 | $107,282 |
| 11 | Signs (construction) (712-06) | SF | 661 | $9.53 |
| 12 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 130 | $12.40 |
| 13 | Plastic pavement marking (stop line) (716-02.05) | LF | 42 | $18.60 |
| 14 | Painted pavement marking (6" line) (716-05.20) | LM | 0.60 | $3,099.35 |
| 15 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 0.60 | $9,298.03 |
| 16 | Mobilization (717-01) | LS | 1 | $13,456 |
| 17 | Saw slot (730-14.02) | LF | 500 | $10.02 |
| 18 | Loop wire (730-14.03) | LF | 1,000 | $2.82 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.