Austin Underground Incorporated: TxDOT bid record
Austin Underground Incorporated submitted 13 bids on Texas DOT contracts in the data, from 08 APR 2021 to 05 MAR 2024, and was the low bidder on 4 of them (31%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $11,808,658
- Latest bid
- 05 MAR 2024
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 6 | 1 | 17% |
| 2022 | 1 | 1 | 100% |
| 2023 | 5 | 2 | 40% |
| 2024 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary special shoring | 403-7001 | SF | 9 | 6 (67%) | $20.00 | $35.73 |
| Temporary sediment control fence (remove) | 506-7041 | LF | 11 | 4 (36%) | $0.60 | $1.00 |
| Rock filter dams (remove) | 506-7011 | LF | 10 | 4 (40%) | $11.50 | $12.00 |
| Embankment (final)(ord comp)(type B) | 132-6003 | CY | 10 | 4 (40%) | $18.50 | $30.00 |
| Removing structure (pipe) | 496-7007 | LF | 9 | 4 (44%) | $22.00 | $24.00 |
| TMA (mobile operation) | 505-7002 | HR | 6 | 4 (67%) | $46.50 | $78.00 |
| TMA (stationary) | 505-7001 | DAY | 11 | 3 (27%) | $180.00 | $230.00 |
| Temporary sediment control fence (install) | 506-7039 | LF | 11 | 3 (27%) | $3.50 | $4.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 11 | 3 (27%) | $4.00 | $3.00 |
| Remove metal beam guard fence | 542-7001 | LF | 10 | 3 (30%) | $2.90 | $3.00 |
| Reflectorized pavement marking type II (W) 8" (solid) | 666-6178-007 | LF | 9 | 3 (33%) | $0.50 | $0.50 |
| Riprap (concrete)(5 in) | 432-7002 | CY | 8 | 3 (38%) | $530.00 | $640.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Dan Williams Company | 5 | 3 of 5 |
| Aaron Concrete Contractors, L.P. | 4 | 1 of 4 |
| Angel Brothers Holdings Corp. | 4 | 1 of 4 |
| Hunter Industries, LTD. | 4 | 2 of 4 |
| Aaron Concrete Contractors, LLC | 4 | 2 of 4 |
| Jordan Foster Construction, LLC | 3 | 1 of 3 |
| Lone Star Sitework, LLC | 3 | 2 of 3 |
| Austin Engineering Co., Inc. | 3 | 1 of 3 |
| Tight Line Construction, LLC | 2 | 1 of 2 |
| Texas Materials Group, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 MAR 2024 | 03243015 | Austin District | RM 3237 Hazard elimination & safety from RM 150 to RM 12 | 7 of 8 | $6,775,363 | +33% |
| 06 SEP 2023 | 09233025 | Austin District | CR Construct pedestrian infrastructure from DRIPPING SPRINGS MIDDLE SCHOOL to ROGER HANKS PARKWAY/BROKEN LANCE RO | 5 of 9 | $1,797,832 | +41% |
| 28 JUN 2023 | 06233619 | Austin District | RM 1431 Hazard elimination & safety from 0.103 MI E OF OLD FM 1431 (E) to E REED PARK RD | 1 of 5 | $5,205,669 | Low, 3.0% under the second |
| 28 JUN 2023 | 06233629 | Austin District | US 290 Intersection improvement from AT TRAUTWEIN ROAD | 4 of 4 | $2,969,840 | +51% |
| 04 MAY 2023 | 05233024 | Austin District | RM 1869 Widen road - add shoulders from HILL TOP to 1.0 MI E OF CR 285 | 1 of 4 | $3,853,599 | Low, 4.0% under the second |
| 04 APR 2023 | 04233011 | Austin District | RM 967 Rehabilitate existing roadway from GOFORTH RD (CR 228) to IH 35 SBFR | 5 of 5 | $11,169,109 | +32% |
| 07 JAN 2022 | 01223221 | Austin District | CR Bridge maintenance from ON CR 190 AT ONION CREEK to STR AA0190001 | 1 of 4 | $1,535,479 | Low, 6.0% under the second |
| 04 AUG 2021 | 08213014 | Austin District | US 183 Rehabilitation of existing road from RM 1869 to COLE DRIVE | 5 of 8 | $6,427,952 | +12% |
| 01 JUL 2021 | 07213035 | Austin District | RM 1431 Install/upgrade roadway lighting from AT W. REED PARK ROAD | 1 of 3 | $1,213,911 | Low, 20% under the second |
| 04 JUN 2021 | 06213219 | Austin District | FM 971 Widen road - add lanes from SS 158 (AUSTIN AVENUE) to GANN STREET/RIVER HAVEN DRIVE | 4 of 5 | $4,682,940 | +15% |
| 05 MAY 2021 | 05213018 | Austin District | US 183 Intersection improvements with right and/or left from 0.08 MI SOUTH OF LAVA HILL RD to 0.11 N OF MCKENZIE INTERSECTION | 2 of 6 | $3,104,299 | +9.0% |
| 08 APR 2021 | 04213219 | Austin District | SL 1 Landscaping and irrigation from SLAUGHTER LANE to SOUTH BAY LANE | 5 of 5 | $3,473,014 | +154% |
| 08 APR 2021 | 04213232 | Austin District | SL 1 Construction of new ramp & intersection improvemt from DUVAL ROAD to 0.8 MILES WEST OF DUVAL ROAD | 3 of 5 | $1,944,141 | +27% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.