Austin Engineering Co., Inc.: TxDOT bid record
Austin Engineering Co., Inc. submitted 13 bids on Texas DOT contracts in the data, from 08 OCT 2021 to 03 APR 2025, and was the low bidder on 1 of them (8%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,365,940
- Latest bid
- 03 APR 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 0 | 0% |
| 2023 | 4 | 0 | 0% |
| 2024 | 4 | 1 | 25% |
| 2025 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Austin District | 10 | 1 | 10% |
| San Antonio District | 2 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Excavation (roadway) | 110-7001 | CY | 12 | 5 (42%) | $27.00 | $20.00 |
| Reflectorized pavement marker type II-A-A | 672-7004 | EACH | 10 | 4 (40%) | $9.50 | $5.00 |
| Furnishing and placing topsoil (4") | 160-6003 | SY | 8 | 4 (50%) | $2.25 | $3.00 |
| Removing concrete (riprap) | 104-7006 | SY | 5 | 4 (80%) | $12.00 | $25.00 |
| Cut & restoring pavement | 400-7006 | SY | 5 | 4 (80%) | $204.00 | $150.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 13 | 3 (23%) | $5,100.00 | $5,000.00 |
| Rock filter dams (remove) | 506-7011 | LF | 10 | 3 (30%) | $25.00 | $12.00 |
| TMA (stationary) | 505-7001 | DAY | 9 | 3 (33%) | $185.00 | $230.00 |
| Cem stabil BKFL | 400-7010 | CY | 8 | 3 (38%) | $262.00 | $200.00 |
| Install delineator assembly (D-SW)SZ (BRF)CTB (BI) | 658-6014 | EACH | 6 | 3 (50%) | $25.00 | $25.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 10 | 2 (20%) | $1.00 | $1.40 |
| Portable changeable message sign | 503-7002 | EACH | 10 | 2 (20%) | $12,000 | $10,000 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aaron Concrete Contractors, LLC | 6 | 1 of 6 |
| Dan Williams Company | 5 | 3 of 5 |
| Relmco, Inc. | 3 | 3 of 3 |
| J3 Company, LLC | 3 | 2 of 3 |
| Austin Underground Incorporated | 3 | 2 of 3 |
| Capital Excavation Company | 3 | 2 of 3 |
| Hunter Industries, LTD. | 3 | 2 of 3 |
| Jordan Foster Construction, LLC | 3 | 0 of 3 |
| Harper Brothers Construction LLC | 2 | 2 of 2 |
| FNH Construction, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 03 APR 2025 | A00184597 | Austin District | Hazard Elimination & Safety, RM 1431 (Destination Way to 0.103 MI E of Old FM 1431 (E)) | 2 of 5 | $8,875,259 | +12% |
| 07 FEB 2025 | A00205303 | Austin District | Transportation Non-Roadway, US 183 (RM 620 EBFR to 0.09 MI N of Pecan Park Blvd) | 3 of 4 | $1,245,746 | +35% |
| 06 FEB 2025 | A00184596 | Austin District | Widen Road - Add Shoulders, SH 71 (0.75 MI W of CR 401 to 0.75 MI E of CR 401) | 3 of 8 | $7,454,914 | +5.0% |
| 06 MAR 2024 | 03243206 | Austin District | US 281 Widen road - add lanes and shoulders from BURNET COUNTY LINE to 0.25 MI N OF RM 962 | 5 of 6 | $12,149,030 | +9.0% |
| 06 MAR 2024 | 03243223 | Yoakum District | CR Bridge replacement from AT WEST SANDY CREEK to STR # AA02-22-001 (CR 221) | 7 of 8 | $3,574,428 | +30% |
| 02 FEB 2024 | 02243205 | San Antonio District | FM 3351 Bridge replacement from AT CIBOLO CREEK | 6 of 9 | $15,150,518 | +21% |
| 05 JAN 2024 | 01243234 | Austin District | FM 619 Bridge replacement from ON FM 619 AT DRAW to STR # 14-246-0-0986-01-007 | 1 of 2 | $1,365,940 | Low, 28% under the second |
| 07 SEP 2023 | 09233223 | Austin District | FM 1466 Bridge replacement from AT LITTLE DRY BRUSHY CREEK to STR# 14-246-0-1200-04-007 | 2 of 4 | $6,263,294 | +13% |
| 06 SEP 2023 | 09233025 | Austin District | CR Construct pedestrian infrastructure from DRIPPING SPRINGS MIDDLE SCHOOL to ROGER HANKS PARKWAY/BROKEN LANCE RO | 4 of 9 | $1,715,019 | +34% |
| 28 JUN 2023 | 06233619 | Austin District | RM 1431 Hazard elimination & safety from 0.103 MI E OF OLD FM 1431 (E) to E REED PARK RD | 2 of 5 | $5,351,123 | +3.0% |
| 27 JUN 2023 | 06233434 | Austin District | CR Construct new road from CR 119 to 0.45 MILES EAST OF CR 119 | 3 of 4 | $2,951,570 | +14% |
| 07 JAN 2022 | 01223221 | Austin District | CR Bridge maintenance from ON CR 190 AT ONION CREEK to STR AA0190001 | 4 of 4 | $2,242,124 | +46% |
| 08 OCT 2021 | 10213212 | San Antonio District | CR Bridge replacement from WITT ROAD to AT VERDE CREEK | 6 of 8 | $693,361 | +16% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.