TxDOT contract A00065051 bid tabulation

Highway Improvement, FM 466 (At Eastwood Dr. to .). Let by Texas DOT on June 2, 2026, Guadalupe, San Antonio District. 7 bids received; low bid $2,728,902 by Hunter Industries, LTD., -8.5% against the engineer's estimate of $2,982,000.

Owner
Texas DOT
Letting
02 JUN 2026
Pay items
133
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hunter Industries, LTD.$2,728,902Low-8.0%
2D&S Concrete Contractors LLC$2,760,043+1.0%-7.0%
3J3 Company, LLC$3,089,270+13%+4.0%
4Acme Bridge Company, Inc.$3,149,442+15%+6.0%
5STX Civil$3,240,842+19%+9.0%
6Texas Materials Group, Inc.$3,362,927+23%+13%
7E-Z Bel Construction, LLC$3,492,121+28%+17%
TxDOT contract A00065051: bids by rank

Engineer's estimate: $2,982,000.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hunter Industries, LTD.2. D&S Concrete Contractors LLC3. J3 Company, LLC4. Acme Bridge Company, Inc.5. STX Civil6. Texas Materials Group, Inc.
1Preparing row (100-7002)STA25.15$4,200.00$732.56$1,000.00$4,400.00$2,000.00$1,248.13$2,600.00
2Preparation row (tree remove) (0"-12" diameter) (100-7003)EACH4$396.00$2,750.00$150.00$1,500.00$1,220.00$1,424.27$1,150.00
3Removing concrete (riprap) (104-7006)SY2$10.00$108.90$50.00$350.00$32.80$20.91$219.00
4Removing concrete (driveways) (104-7011)SY345$12.50$16.50$40.00$30.00$22.10$18.28$33.00
5Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY389$9.00$16.50$40.00$22.00$19.60$5.65$32.00
6Removing concrete (curb & gutter) (104-7017)LF508$10.00$9.90$5.00$6.00$9.00$5.74$12.00
7Removing concrete (miscellaneous) (104-7046)SY21$26.00$29.70$40.00$150.00$87.20$28.63$85.00
8Excavation (roadway) (110-7001)CY14,205$19.00$18.70$20.00$18.00$18.20$23.14$25.00
9Embankment (final)(DC)(type C1) (132-7008)CY282$15.00$22.00$30.00$50.00$14.00$47.38$85.00
10Compost manuf topsoil (4") (161-7002)SY6,572$1.00$2.26$1.00$8.00$4.00$1.84$3.80
11Block sodding (162-7002)SY677$5.80$9.88$10.00$10.00$8.50$10.39$7.00
12Broadcast seed (permanent_urban_clay) (164-7004)SY5,895$1.00$0.27$0.50$0.50$0.37$0.28$0.40
13Broadcast seed (temporary_warm_cool) (164-7007)SY5,895$0.13$0.16$0.50$0.25$0.37$0.17$0.35
14Vegetative watering (168-7001)TGL105$24.20$29.70$8.50$60.00$61.30$75.63$48.00
15Soil ret BLKT(SL_mod_clay_long_roll) (169-7010)SY6,572$3.00$1.36$1.50$2.50$2.90$1.42$2.60
16FL BS(cip)(type D, GR 1-2 or 5)(final pos) (247-7192)CY2,315$60.00$53.13$20.00$60.00$80.00$60.14$90.00
17Geogrid base reinforcement (type 2) (250-7002)SY10,785$2.00$1.76$1.00$2.50$3.00$3.35$2.20
18Lime (com or QK)(slurry) (260-7005)TON263$300.00$385.00$300.00$300.00$457.00$352.51$330.00
19Lime TRT (subgrade) (8") (260-7020)SY10,785$2.00$4.40$4.00$6.50$3.35$3.82$6.15
20Prime coat(MC-30 or AE-P) (310-7013)GAL1,888$3.20$5.06$5.00$3.50$3.70$4.15$5.00
21D-GR HMA type-B PG64-22 (341-7001)TON1,533$75.04$89.10$190.00$100.00$100.00$112.75$100.00
22D-GR HMA type D PG76-22 (341-7056)TON1,086$96.88$97.90$190.00$120.00$124.00$138.87$115.00
23D-GR HMA type D PG76-22 (level-UP) (341-7059)TON118$96.88$110.00$200.00$140.00$111.00$124.62$137.00
24Tom-C PG76-22 sac-A (347-7001)TON537$144.17$124.30$200.00$165.00$173.00$194.65$225.00
25Planing asphalt concrete pavement (2.5") (354-7082)SY1,364$2.57$7.70$9.00$8.00$7.40$2.61$2.50
26Concrete pavement (CRCP) (7") (360-7001)SY518$108.20$97.15$125.00$120.00$125.00$114.82$105.00
27Cut & restoring pavement (400-7006)SY444$211.68$82.80$35.00$100.00$185.00$123.64$46.00
28Flowable backfill (401-7001)CY563$416.00$231.83$140.00$180.00$255.00$199.37$220.00
29Trench excavation protection (402-7001)LF1,123$7.00$27.60$1.00$10.00$9.50$5.24$25.00
30Drilled shaft (24 in) (416-7004)LF6$310.00$209.99$200.00$300.00$423.00$474.76$350.00
31Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF104$240.00$241.49$300.00$350.00$243.00$332.33$230.00
32Class A concrete (channel lining) (420-7150)CY98$1,050.00$674.08$750.00$550.00$746.00$998.37$642.00
33Riprap (concrete)(4 in) (432-7001)CY31.20$575.00$787.43$900.00$750.00$571.00$603.06$750.00
34RC pipe (CL III)(18 in) (464-7003)LF42$82.00$152.34$120.00$180.00$95.20$67.26$200.00
35RC pipe (CL III)(36 in) (464-7009)LF1,095$170.00$229.62$220.00$200.00$150.00$153.97$280.00
36Manh (complete)(PRM)(48IN) (465-7002)EACH2$6,031.00$6,816.88$4,000.00$7,000.00$9,930.00$10,375$8,800.00
37Manh (complete)(PRM)(60IN) (465-7003)EACH1$10,234$9,642.99$5,000.00$8,500.00$10,400$9,908.12$13,000
38Manh (complete)(PRM)(72IN) (465-7004)EACH1$11,565$11,383$6,200.00$10,500$13,100$11,769$14,000
39Junction box(complete)(PJB)(5FTX5FT) (465-7009)EACH1$6,601.00$8,847.88$4,000.00$10,000$10,400$10,885$12,750
40Inlet (complete)(pco)(3FT)(both) (465-7016)EACH1$6,933.00$7,217.46$5,000.00$10,000$7,610.00$9,160.02$8,200.00
41Inlet (complete)(pco)(4FT)(both) (465-7020)EACH4$5,286.00$11,260$7,000.00$10,500$10,400$10,545$8,900.00
42Inlet (complete)(PSL)(FG)(3FTX3FT-3FTX3FT) (465-7126)EACH1$5,413.00$6,229.58$4,000.00$7,000.00$6,550.00$8,973.27$7,700.00
43Inlet (complete)(PSL)(FG)(4FTX4FT-4FTX4FT) (465-7128)EACH3$5,922.00$8,058.83$5,500.00$8,000.00$8,210.00$9,288.35$8,600.00
44Inlet (complete)(armor curb slot) (465-7335)EACH4$6,817.25$4,414.69$2,500.00$7,500.00$7,500.00$6,471.47$9,150.00
45Inlet (comp)(type sidewalk bridge) (465-7336)EACH1$13,993$15,466$2,500.00$18,000$21,700$16,879$26,500
46Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH1$1,494.00$2,539.08$2,500.00$3,600.00$2,110.00$2,102.32$2,640.00
47Removing structure (inlet) (496-7002)EACH3$466.00$1,324.74$300.00$2,000.00$625.00$1,398.37$1,100.00
48Removing structure (set) (496-7004)EACH4$534.00$717.57$250.00$1,200.00$547.00$307.45$350.00
49Removing structure (pipe) (496-7007)LF781$20.00$33.12$5.00$32.00$18.60$24.86$50.00
50Mobilization (500-7001)LS1$271,091$109,131$200,000$275,000$284,000$253,891$334,000
51Barricades, signs and traffic handling (502-7001)MO11$9,440.00$6,597.36$2,000.00$6,500.00$5,000.00$3,263.41$5,000.00
52Portable changeable message sign (503-7002)EACH3$2,285.00$3,831.03$5,000.00$3,000.00$7,500.00$7,945.21$13,000
53TMA (stationary) (505-7001)DAY64$139.00$136.82$100.00$140.00$2.50$165.03$50.00
54TMA (mobile operation) (505-7003)DAY30$144.00$328.37$200.00$1,000.00$21.30$200.04$300.00
55Rock filter dams (install) (type 2) (506-7002)LF22$40.27$53.09$50.00$50.00$68.70$55.78$95.00
56Rock filter dams (remove) (506-7011)LF22$11.00$36.71$20.00$40.00$31.70$38.57$25.00
57Construction exits (install) (type 1) (506-7020)SY312$25.00$44.75$40.00$25.00$26.40$47.02$25.00
58Construction exits (remove) (506-7024)SY312$10.86$11.01$1.00$15.00$15.90$11.57$5.00
59FRNT end loader work (ersn & sedm cont) (506-7031)HR80$100.00$110.00$20.00$120.00$121.00$65.02$126.00
60Temporary sediment control fence (install) (506-7039)LF1,565$3.50$3.39$5.00$4.00$5.30$3.56$5.00
61Temporary sediment control fence (remove) (506-7041)LF1,565$0.92$1.13$0.50$1.50$1.30$1.19$1.25
62Biodegradable erosion control logs (install) (12") (506-7044)LF363$5.52$4.18$3.00$4.00$6.30$4.39$8.00
63Biodegradable erosion control logs (remove) (506-7046)LF363$1.15$1.02$2.00$1.50$2.10$1.07$1.25
64One-way traffic control (flagger cont) (510-7001)HR540$84.00$77.00$20.00$40.00$186.00$143.30$66.00
65Landscape pavers (528-7001)SY762$128.74$94.50$112.00$95.00$125.00$59.34$90.00
66Concrete curb (type I) (529-7001)LF3,966$14.00$14.70$25.00$16.00$15.90$47.48$14.00
67Concrete curb & gutter (type I) (529-7008)LF331$25.06$46.20$25.00$28.00$31.70$47.48$44.00
68Concrete curb & gutter (type II) (529-7009)LF450$29.46$46.20$25.00$32.00$33.80$53.41$44.00
69Intersections (concrete) (530-7001)SY21$153.51$205.79$110.00$250.00$95.10$166.16$196.00
70Driveways (concrete) (530-7006)SY668$101.00$120.75$100.00$90.00$95.10$77.15$115.00
71Concrete sidewalks (4") (531-7001)SY505$65.00$82.95$100.00$60.00$84.50$77.74$79.00
72Concrete sidewalks (6") (531-7003)SY704$44.11$95.55$110.00$70.00$105.00$91.98$91.00
73Curb ramps (type 2) (531-7006)EACH3$2,500.00$2,263.74$1,200.00$1,500.00$2,320.00$2,789.20$2,156.00
74Curb ramps (type 10) (531-7011)EACH2$3,100.00$2,263.74$1,200.00$1,500.00$2,320.00$4,450.84$2,156.00
75Curb ramps (type 21) (531-7013)EACH2$3,098.00$2,551.43$1,200.00$1,800.00$2,320.00$4,462.71$2,430.00
76Curb ramps (type 7) (sup) (531-7032)EACH1$3,100.00$2,673.23$1,200.00$1,500.00$2,430.00$4,617.01$2,546.00
77Curb ramps (type 1) (sup) (531-7033)EACH2$2,500.00$2,468.48$1,200.00$1,500.00$2,430.00$2,967.23$2,351.00
78Curb ramps (type 2) (sup) (531-7034)EACH1$3,100.00$2,673.23$1,200.00$1,500.00$2,430.00$3,323.28$2,546.00
79Remove metal beam guard fence (542-7001)LF256$2.30$1.73$5.00$5.00$1.60$4.45$6.84
80Mailbox install-S (TWW-post) type 4 (560-7008)EACH8$305.12$288.74$200.00$400.00$370.00$415.41$290.00
81In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH10$4,500.00$5,249.86$5,100.00$5,500.00$5,280.00$6,171.83$5,000.00
82In RD IL (type SA) 40T-8-8 (250W EQ) LED (610-7125)EACH3$6,600.00$6,824.81$5,800.00$7,000.00$6,870.00$7,358.72$6,500.00
83Conduit (PVC) (schedule 40) (2") (618-7030)LF1,370$9.00$13.65$10.50$25.00$13.70$13.06$13.00
84Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF445$25.90$21.00$34.00$35.00$21.10$37.98$20.00
85Electrical conductor (no.8) bare (620-7007)LF1,930$2.00$1.68$2.00$2.50$1.70$2.37$1.60
86Electrical conductor (no.8) insulated (620-7008)LF4,160$2.00$1.84$1.80$2.50$1.85$2.37$1.75
87Ground box type A (122311) (624-7001)EACH1$1,178.00$944.97$1,000.00$1,100.00$951.00$1,175.03$900.00
88Ground box type A (122311)W/apron (624-7002)EACH5$1,442.00$1,023.72$1,250.00$1,400.00$1,030.00$1,542.96$975.00
89Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009)EACH1$9,700.00$7,349.80$5,500.00$11,000$7,400.00$10,326$7,000.00
90Aluminum signs (type A) (636-7001)SF11$48.00$26.25$25.00$110.00$103.00$59.35$50.00
91Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH24$597.00$701.12$130.00$840.00$793.00$890.17$675.00
92Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH11$790.00$787.48$130.00$1,100.00$1,010.00$1,139.42$740.00
93Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH1$800.00$892.48$750.00$1,000.00$916.00$1,029.04$765.00
94Remove SM RD SN sup&AM (644-7073)EACH28$132.00$52.50$50.00$50.00$79.30$89.02$100.00
95Remove SM RD SN sup&AM (sign only) (644-7075)EACH2$130.00$26.25$25.00$25.00$40.20$45.11$50.00
96Remove delin & object marker assms (658-7078)EACH10$25.00$5.25$25.00$5.00$23.30$21.02$15.00
97Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248)EACH5$130.00$94.50$110.00$90.00$116.00$130.56$45.00
98Install object marker assembly (OM-2Z)(WFLX)SRFLL (658-7256)EACH5$130.00$94.50$97.00$90.00$100.00$112.75$50.00
99Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH30$11.00$52.50$400.00$50.00$33.80$37.98$15.00
100Install OM SM RD sign (1-OM-PW)R (658-7318)EACH7$11.00$52.50$400.00$50.00$33.80$37.98$15.00
101Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH506$0.82$1.72$4.62$3.00$1.90$0.90$1.75
102Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH282$0.53$1.72$4.63$3.00$1.90$0.90$1.75
103Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF117$1.27$0.89$2.00$3.60$0.90$1.01$2.20
104Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF58$1.33$1.26$3.00$3.80$1.25$1.42$3.50
105Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF594$1.00$1.26$1.00$1.50$1.25$1.42$2.10
106Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF724$7.70$9.45$6.75$8.35$9.50$10.68$7.75
107Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH4$140.00$208.94$200.00$165.00$210.00$236.19$115.00
108Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH6$250.00$288.74$300.00$205.00$291.00$326.40$140.00
109Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH4$175.00$225.74$200.00$205.00$227.00$255.18$130.00
110Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087)EACH25$40.00$52.50$35.00$62.00$52.80$59.34$35.00
111Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123)LF436$7.65$9.45$12.00$8.35$9.50$10.68$11.40
112Pavement sler 6" (666-7347)LF8,722$0.20$0.37$0.50$0.33$0.37$0.42$0.61
113Pavement sler 8" (666-7348)LF652$0.40$0.50$0.50$0.75$0.51$0.57$1.40
114Pavement sler 24" (666-7352)LF1,160$2.00$1.26$3.00$5.22$1.25$1.42$1.60
115Pavement sler (arrow) (666-7353)EACH6$80.00$26.25$100.00$90.00$26.40$29.67$50.00
116Pavement sler (word) (666-7354)EACH4$76.00$26.25$100.00$105.00$26.40$29.67$60.00
117Pavement sler (double arrow) (666-7356)EACH6$74.00$26.25$150.00$105.00$26.40$29.67$65.00
118Pavement sler (yld tri) (666-7365)EACH25$32.00$26.25$25.00$40.00$26.40$29.67$15.00
119Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF3,981$0.50$0.84$1.00$0.85$0.85$0.95$1.00
120Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF4,624$0.55$0.84$1.00$0.85$0.85$0.95$1.00
121Prefabricated PM type B (W)(LN RDCT arrow) (668-7029)EACH2$350.00$367.49$1,000.00$460.00$370.00$415.42$450.00
122Reflectorized pavement marker type I-C (672-7002)EACH144$3.80$6.30$5.50$6.50$6.30$7.12$5.85
123Reflectorized pavement marker type II-A-A (672-7004)EACH163$3.80$6.30$5.50$6.50$6.30$7.12$5.85
124Vehicle signal section (12")LED(yel) (682-7003)EACH2$320.00$278.24$225.00$500.00$280.00$166.17$265.00
125Install RDSD FLSH BCN assembly (solar PWRD) (685-7004)EACH1$7,900.00$7,349.80$4,900.00$7,500.00$7,400.00$9,020.36$7,000.00
126Removing RDSD FLSH BCN AM (solar PWRD) (685-7006)EACH1$1,400.00$524.99$300.00$750.00$528.00$379.80$500.00
127Strip mowing (730-7018)CYC4$4,350.00$850.00$200.00$1,250.00$1,740.00$4,226.74$1,500.00
128Litter removal (734-7002)CYC11$3,000.00$1,250.00$50.00$1,700.00$1,910.00$2,206.74$500.00
129Litter removal (spot) (734-7003)ACRE4.91$50.00$450.00$75.00$1,500.00$446.00$11.04$500.00
130Debris removing-CNTR med/MN LNS/ramps (735-7002)CYC11$2,000.00$850.00$100.00$1,700.00$1,910.00$5,664.27$500.00
131Debris removal (spot debris) (735-7072)MI0.15$1,387.30$5,000.00$3,000.00$5,000.00$14,801$155.87$5,000.00
132Underseal course (3006-7001)GAL273$3.20$4.62$4.00$4.00$4.25$4.75$4.00
133Bonding course (3007-7001)GAL3,647$3.20$3.30$3.00$5.00$3.15$3.56$4.00
TxDOT contract A00065051: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.