| 1 | Preparing row (100-7002) | STA | 50 | $10,000 | $1,500.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 389 | $50.00 | $44.00 |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 389 | $20.00 | $22.00 |
| 4 | Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008) | SY | 2,002 | $10.00 | $10.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 4,625 | $32.00 | $9.50 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 187,970 | $20.00 | $19.50 |
| 7 | Blading (150-7002) | HR | 50 | $250.00 | $400.00 |
| 8 | Proof rolling (216-7001) | HR | 50 | $125.00 | $150.00 |
| 9 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 7,579 | $17.00 | $13.75 |
| 10 | FL BS (compacted in place)(type A GR 4)(7") (247-7343) | SY | 41,788 | $28.00 | $10.00 |
| 11 | Prime coat (AE-P) (310-7001) | GAL | 9,667 | $4.50 | $4.60 |
| 12 | SP mixes SP-B sac-B PG70-22 (344-7005) | TON | 15,181 | $135.00 | $107.00 |
| 13 | Stone-MTRX-asphalt smar-F sac-A (346-7023) | TON | 0 | $170.00 | $0.00 |
| 14 | Cem stabil BKFL (400-7010) | CY | 463 | $160.00 | $302.50 |
| 15 | Trench excavation protection (402-7001) | LF | 4,534 | $15.00 | $38.50 |
| 16 | Drilled shaft (18 in) (416-7002) | LF | 226 | $170.00 | $319.00 |
| 17 | Drilled shaft (36 in) (416-7006) | LF | 960 | $350.00 | $374.00 |
| 18 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 280 | $550.00 | $495.00 |
| 19 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 30 | $360.00 | $605.00 |
| 20 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 96 | $540.00 | $935.00 |
| 21 | Class C concrete (abutment) (420-7012) | CY | 123.60 | $1,500.00 | $1,540.00 |
| 22 | Class C concrete (cap) (420-7022) | CY | 68.80 | $1,700.00 | $1,540.00 |
| 23 | Class C concrete (column) (420-7038) | CY | 56.80 | $1,800.00 | $1,760.00 |
| 24 | Reinforced concrete slab (HPC) (422-7002) | SF | 25,142 | $60.00 | $34.65 |
| 25 | Approach slab (HPC) (422-7014) | CY | 156 | $900.00 | $935.00 |
| 26 | Retaining wall (concrete block) (423-7013) | SF | 52,323 | $60.00 | $51.61 |
| 27 | Prestressed concrete girder (TX46) (425-7004) | LF | 3,127.80 | $250.00 | $316.80 |
| 28 | Riprap (concrete)(4 in) (432-7001) | CY | 568 | $700.00 | $825.00 |
| 29 | Riprap (mow strip)(4 in) (432-7013) | CY | 184 | $720.00 | $770.00 |
| 30 | Rail (type SSTR)(HPC) (450-7025) | LF | 1,393.20 | $115.00 | $159.50 |
| 31 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 158 | $240.00 | $297.00 |
| 32 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 98 | $515.00 | $407.00 |
| 33 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 290 | $500.00 | $748.00 |
| 34 | Concrete box culvert (7 FT X 3 FT) (462-7015) | LF | 291 | $1,000.00 | $907.50 |
| 35 | RC pipe (CL III)(18 in) (464-7003) | LF | 0 | $125.00 | $0.00 |
| 36 | RC pipe (CL III)(24 in) (464-7005) | LF | 0 | $130.00 | $0.00 |
| 37 | RC pipe (CL III)(27 in) (464-7006) | LF | 321 | $150.00 | $121.00 |
| 38 | RC pipe (CL III)(30 in) (464-7007) | LF | 0 | $170.00 | $0.00 |
| 39 | RC pipe (CL III)(36 in) (464-7009) | LF | 0 | $300.00 | $0.00 |
| 40 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 7 | $10,000 | $6,050.00 |
| 41 | Manh (complete)(PRM)(60IN) (465-7003) | EACH | 2 | $13,000 | $11,000 |
| 42 | Junction box(complete)(PJB)(6FTX6FT) (465-7011) | EACH | 1 | $13,000 | $16,500 |
| 43 | Inlet (complete)(pcu)(5FT)(left) (465-7038) | EACH | 6 | $7,000.00 | $11,000 |
| 44 | Inlet (complete)(pcu)(5FT)(right) (465-7039) | EACH | 1 | $7,000.00 | $11,000 |
| 45 | Inlet (complete)(pazd)(RC)(4FTX4FT) (465-7153) | EACH | 6 | $15,000 | $8,250.00 |
| 46 | Inlet (complete)(pazd)(RC)(5FTX5FT) (465-7154) | EACH | 2 | $20,000 | $11,000 |
| 47 | Inlet (complete)(drop) (465-7346) | EACH | 6 | $6,000.00 | $7,150.00 |
| 48 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 6 | $5,100.00 | $4,950.00 |
| 49 | Pipe (PVC) (schedule 40) (6 in) (481-7013) | LF | 60 | $115.00 | $55.00 |
| 50 | Removing structure (pipe) (496-7007) | LF | 183 | $24.00 | $16.50 |
| 51 | Mobilization (500-7001) | LS | 1 | $2,400,000 | $1,225,000 |
| 52 | Barricades, signs and traffic handling (502-7001) | MO | 24 | $20.00 | $25,000 |
| 53 | Portable changeable message sign (503-7002) | EACH | 3 | $22,000 | $22,000 |
| 54 | TMA (stationary) (505-7001) | DAY | 66 | $300.00 | $137.50 |
| 55 | TMA (mobile operation) (505-7003) | DAY | 10 | $600.00 | $946.00 |
| 56 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 1,760 | $8.00 | $11.50 |
| 57 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,760 | $2.00 | $7.00 |
| 58 | Constructing detours (508-7001) | SY | 812 | $85.00 | $82.00 |
| 59 | Landscape pavers (528-7001) | SY | 737 | $80.00 | $133.01 |
| 60 | Concrete curb (type II) (529-7002) | LF | 3,396 | $38.00 | $27.50 |
| 61 | Concrete C&G (valley gutter) (529-7019) | LF | 83 | $150.00 | $145.20 |
| 62 | Concrete sidewalks (4") (531-7001) | SY | 227 | $85.00 | $104.50 |
| 63 | Curb ramps (type 1) (531-7005) | EACH | 14 | $2,500.00 | $3,135.00 |
| 64 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 18,364 | $0.50 | $0.20 |
| 65 | Concrete median (536-7002) | SY | 447 | $175.00 | $104.50 |
| 66 | Metal W-beam guard fence (steel post) (540-7002) | LF | 3,458 | $35.00 | $34.10 |
| 67 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $2,500.00 | $2,860.00 |
| 68 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,000.00 | $1,622.50 |
| 69 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,375.00 | $3,932.50 |
| 70 | Wire fence (type A) (552-7001) | LF | 770 | $23.00 | $49.50 |
| 71 | Pipe underdrains (type 6) (6") (556-7006) | LF | 3,544 | $20.00 | $19.80 |
| 72 | In RD IL (U/P) (type 2) (150W EQ) LED (610-7016) | EACH | 8 | $1,500.00 | $3,025.00 |
| 73 | In RD IL (type SA) 40T-12 (250W EQ) LED (610-7128) | EACH | 3 | $5,000.00 | $6,875.00 |
| 74 | In RD IL (type SA) 50T-12-12(400W EQ)LED (610-7201) | EACH | 25 | $8,000.00 | $9,350.00 |
| 75 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 6,795 | $12.00 | $8.80 |
| 76 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 120 | $16.00 | $27.50 |
| 77 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 145 | $15.00 | $27.50 |
| 78 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 230 | $17.00 | $33.00 |
| 79 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 465 | $45.00 | $60.50 |
| 80 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 10 | $40.00 | $16.50 |
| 81 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 500 | $30.00 | $33.00 |
| 82 | Conduit (RM) (3/4") (618-7070) | LF | 80 | $65.00 | $44.00 |
| 83 | Conduit (RM) (2") (618-7078) | LF | 475 | $35.00 | $110.00 |
| 84 | Electrical conductor (no.12) insulated (620-7004) | LF | 300 | $7.00 | $2.20 |
| 85 | Electrical conductor (no.8) bare (620-7007) | LF | 555 | $2.00 | $1.93 |
| 86 | Electrical conductor (no.8) insulated (620-7008) | LF | 3,330 | $2.10 | $2.20 |
| 87 | Electrical conductor (no.6) bare (620-7009) | LF | 8,195 | $2.20 | $2.20 |
| 88 | Electrical conductor (no.6) insulated (620-7010) | LF | 16,890 | $2.40 | $2.48 |
| 89 | Ground box type A (122311)W/apron (624-7002) | EACH | 12 | $1,800.00 | $2,035.00 |
| 90 | Ground box type D (162922)W/apron (624-7008) | EACH | 12 | $2,200.00 | $3,025.00 |
| 91 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 2 | $12,000 | $13,750 |
| 92 | Elc SRV type D 120/240 070(NS)SS(E)SP(O) (628-7191) | EACH | 1 | $10,000 | $13,750 |
| 93 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 19 | $900.00 | $941.60 |
| 94 | Remove SM RD SN sup&AM (644-7073) | EACH | 25 | $120.00 | $95.00 |
| 95 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 16 | $35.00 | $53.90 |
| 96 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 50 | $10.00 | $49.50 |
| 97 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 6 | $90.00 | $97.90 |
| 98 | Work zone pavement marking removing (reflectorized) type I-C (662-7049) | EACH | 120 | $5.25 | $11.00 |
| 99 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 40 | $8.00 | $11.00 |
| 100 | Work zone pavement marking removing (traffic BTN) type W (662-7057) | EACH | 54 | $8.00 | $11.00 |
| 101 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 4,100 | $1.60 | $1.05 |
| 102 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 939 | $4.50 | $3.30 |
| 103 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 95 | $4.50 | $11.00 |
| 104 | Pavement sler 6" (666-7347) | LF | 88,650 | $0.50 | $0.35 |
| 105 | Pavement sler 8" (666-7348) | LF | 4,100 | $0.75 | $0.55 |
| 106 | Pavement sler 12" (666-7350) | LF | 1,034 | $0.75 | $1.10 |
| 107 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 28,584 | $0.85 | $0.76 |
| 108 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 44,597 | $1.00 | $0.76 |
| 109 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 15,293 | $1.60 | $0.76 |
| 110 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 176 | $25.00 | $22.00 |
| 111 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 502 | $35.00 | $15.40 |
| 112 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 13 | $560.00 | $346.50 |
| 113 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 8 | $95.00 | $35.20 |
| 114 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 13 | $7.50 | $11.00 |
| 115 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 349 | $5.00 | $5.23 |
| 116 | Pavement surface preparation for marking (6") (678-7002) | LF | 54,516 | $1.00 | $0.39 |
| 117 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $20,000 | $110,000 |
| 118 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 13 | $370.00 | $385.00 |
| 119 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 8 | $370.00 | $385.00 |
| 120 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 19 | $370.00 | $385.00 |
| 121 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $370.00 | $385.00 |
| 122 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 19 | $370.00 | $385.00 |
| 123 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 10 | $1,000.00 | $990.00 |
| 124 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 17 | $175.00 | $247.50 |
| 125 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 2 | $250.00 | $302.50 |
| 126 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 2,330 | $2.50 | $3.03 |
| 127 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 965 | $4.00 | $3.03 |
| 128 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,745 | $4.00 | $3.85 |
| 129 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 140 | $4.00 | $5.78 |
| 130 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 155 | $4.00 | $7.15 |
| 131 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,265 | $8.00 | $11.55 |
| 132 | Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036) | EACH | 1 | $14,000 | $33,000 |
| 133 | Ins traffic signal PL AM(S)1 arm(36')lum&ilsn (686-7040) | EACH | 1 | $26,000 | $35,200 |
| 134 | Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060) | EACH | 3 | $40,000 | $64,900 |
| 135 | Ins traffic signal PL AM(S)1 arm(60')lum&ilsn (686-7064) | EACH | 1 | $44,000 | $67,100 |
| 136 | Pedestrian pole assembly (687-7001) | EACH | 4 | $3,750.00 | $4,400.00 |
| 137 | Pedestrian detect push button (APS) (688-7001) | EACH | 10 | $1,100.00 | $1,100.00 |
| 138 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $5,000.00 | $7,150.00 |
| 139 | Strip mowing (730-7018) | CYC | 8 | $5,000.00 | $4,200.00 |
| 140 | Litter removal (734-7002) | CYC | 32 | $2,600.00 | $1,500.00 |
| 141 | Debris removal (frontage roads) (735-7026) | CYC | 32 | $2,000.00 | $834.00 |
| 142 | Cleaning / sweeping (frontage road) (738-7050) | CYC | 32 | $2,000.00 | $440.00 |
| 143 | Post and cable fence (removal) (772-7001) | LF | 2,768 | $8.00 | $3.30 |
| 144 | Bonding course (3007-7001) | GAL | 9,876 | $3.50 | $4.45 |
| 145 | ITS com CBL (ethernet) (6005-7001) | LF | 270 | $950.00 | $2.75 |
| 146 | VIVDS prosr sys (6006-7001) | EACH | 1 | $6,000.00 | $22,000 |
| 147 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 4 | $5,000.00 | $11,000 |
| 148 | Stone-MTRX-asphalt SMA-D sac-A PG76-22 (346-7009) | TON | 4,372 | $170.00 | $152.00 |
| 149 | Thermoplastic pipe (PP) (18") (468-7001) | LF | 706 | $125.00 | $93.50 |
| 150 | Thermoplastic pipe (PP) (24") (468-7002) | LF | 1,072 | $130.00 | $104.50 |
| 151 | Thermoplastic pipe (PP) (30") (468-7003) | LF | 934 | $170.00 | $148.50 |
| 152 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 822 | $300.00 | $209.00 |