TxDOT contract A00190748 bid tabulation
Rehabilitate Existing Roadway, IH 45 (Ellis County Line to SH 310). Let by Texas DOT on September 5, 2025, Dallas, Dallas District. 6 bids received; low bid $18,231,669 by Texas Materials Group, Inc., -16% against the engineer's estimate of $21,775,019.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 145
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Materials Group, Inc. | $18,231,669 | Low | -16% |
| 2 | Ragle Construction, Inc. | $18,867,986 | +3.0% | -13% |
| 3 | Austin Bridge & Road Services, LP | $19,567,306 | +7.0% | -10% |
| 4 | Grey Sky Construction LLC | $20,553,626 | +13% | -6.0% |
| 5 | Foutsco Paving Company, LLC | $20,986,776 | +15% | -4.0% |
| 6 | Ed Bell Construction Company | $21,339,639 | +17% | -2.0% |
Engineer's estimate: $21,775,019.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Materials Group, Inc. | 2. Ragle Construction, Inc. | 3. Austin Bridge & Road Services, LP | 4. Grey Sky Construction LLC | 5. Foutsco Paving Company, LLC | 6. Ed Bell Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 438 | $5,000.00 | $100.00 | $4,000.00 | $4,467.42 | $4,250.00 | $500.00 | $1,675.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 987 | $40.00 | $30.00 | $9.70 | $30.75 | $50.00 | $15.00 | $20.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 78 | $100.00 | $200.00 | $15.50 | $95.14 | $30.00 | $50.00 | $260.00 |
| 4 | Removing concrete (curb) (104-7016) | LF | 209 | $25.00 | $14.00 | $5.90 | $11.13 | $20.00 | $35.00 | $41.00 |
| 5 | Removing concrete (miscellaneous) (104-7046) | SY | 1 | $300.00 | $1,000.00 | $294.00 | $1,305.24 | $1,000.00 | $200.00 | $1,000.00 |
| 6 | Subgr widen (OC) (112-7001) | STA | 375 | $350.00 | $100.00 | $991.00 | $1,000.00 | $250.00 | $2,500.00 | $2,000.00 |
| 7 | Embankment (final)(OC)(type C1) (132-7007) | CY | 5,075 | $35.00 | $80.00 | $35.00 | $23.55 | $30.00 | $20.00 | $15.00 |
| 8 | Embankment (final)(DC)(type C2) (132-7010) | CY | 638 | $80.00 | $80.00 | $242.00 | $275.00 | $50.00 | $40.00 | $100.00 |
| 9 | Backfill (type A or B) (134-7004) | STA | 375 | $400.00 | $1,000.00 | $477.00 | $345.29 | $250.00 | $50.00 | $1,000.00 |
| 10 | Compost manuf topsoil (4") (161-7002) | SY | 37,713 | $3.00 | $1.07 | $1.07 | $2.42 | $6.00 | $1.00 | $5.25 |
| 11 | Block sodding (162-7002) | SY | 37,713 | $8.00 | $4.00 | $7.60 | $4.00 | $5.00 | $1.00 | $7.35 |
| 12 | Drill seed (temporary_warm_cool) (164-7015) | SY | 37,713 | $0.75 | $0.24 | $0.24 | $0.24 | $0.50 | $0.10 | $0.16 |
| 13 | Vegetative watering (168-7001) | TGL | 11,220 | $25.00 | $1.00 | $29.00 | $0.01 | $5.00 | $1.00 | $1.00 |
| 14 | FL BS (compacted in place)(type-D GR-1-2)(14") (247-7352) | SY | 33,789 | $30.00 | $43.00 | $25.50 | $37.45 | $25.00 | $58.00 | $50.00 |
| 15 | Lime (quicklime (slurry)) (260-7003) | TON | 976 | $500.00 | $300.00 | $317.00 | $375.00 | $400.00 | $340.00 | $400.00 |
| 16 | Lime TRT (existing material)(8") (260-7007) | SY | 41,774 | $11.60 | $12.00 | $4.30 | $16.00 | $6.00 | $15.00 | $10.00 |
| 17 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 10,529 | $8.00 | $5.00 | $6.10 | $7.00 | $5.00 | $1.00 | $6.30 |
| 18 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 33,570 | $135.00 | $160.00 | $133.00 | $125.00 | $150.00 | $170.00 | $144.00 |
| 19 | Tack coat (344-7077) | GAL | 21,722 | $4.00 | $4.00 | $5.70 | $3.84 | $6.00 | $10.00 | $4.00 |
| 20 | Flexible pavement structure repair(9") (351-7008) | SY | 26,610 | $100.00 | $80.75 | $80.00 | $75.00 | $90.00 | $75.50 | $80.00 |
| 21 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 164,052 | $3.00 | $2.00 | $2.90 | $1.50 | $3.00 | $1.50 | $2.00 |
| 22 | Full-depth repair CPCD (8") (361-7059) | SY | 2,162 | $300.00 | $228.00 | $250.00 | $330.00 | $450.00 | $150.00 | $255.00 |
| 23 | Full-depth repair CRCP (12") (361-7060) | SY | 3,000 | $500.00 | $290.00 | $328.60 | $338.00 | $600.00 | $200.00 | $350.00 |
| 24 | Flowable backfill (401-7001) | CY | 13.50 | $500.00 | $310.00 | $300.00 | $610.05 | $350.00 | $575.00 | $2,500.00 |
| 25 | Trench excavation protection (402-7001) | LF | 260 | $35.00 | $260.00 | $6.00 | $15.00 | $10.00 | $10.00 | $25.00 |
| 26 | Temporary special shoring (403-7001) | SF | 2,772 | $50.00 | $30.00 | $65.70 | $40.00 | $75.00 | $65.00 | $100.00 |
| 27 | Class B concrete (flume) (420-7010) | CY | 1.40 | $3,000.00 | $1,400.00 | $1,100.00 | $1,397.64 | $650.00 | $1,250.00 | $2,500.00 |
| 28 | Class B concrete (miscellaneous) (420-7011) | CY | 3.60 | $600.00 | $1,400.00 | $924.00 | $1,373.58 | $1,500.00 | $650.00 | $2,500.00 |
| 29 | Class C concrete (rail foundation) (420-7052) | CY | 42 | $850.00 | $1,000.00 | $605.00 | $609.61 | $1,250.00 | $850.00 | $1,000.00 |
| 30 | Retaining wall (MSE) (423-7001) | SF | 2,612 | $125.00 | $150.00 | $64.60 | $120.00 | $75.00 | $133.00 | $123.75 |
| 31 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 20 | $250.00 | $600.00 | $150.00 | $143.00 | $500.00 | $135.00 | $945.00 |
| 32 | Riprap (concrete)(4 in) (432-7001) | CY | 65 | $1,250.00 | $800.00 | $838.00 | $551.04 | $550.00 | $650.00 | $1,500.00 |
| 33 | Riprap (concrete)(5 in) (432-7002) | CY | 5 | $1,000.00 | $900.00 | $861.00 | $1,283.27 | $650.00 | $750.00 | $1,500.00 |
| 34 | Riprap (mow strip)(4 in) (432-7013) | CY | 310 | $500.00 | $800.00 | $648.00 | $599.29 | $500.00 | $650.00 | $1,000.00 |
| 35 | Riprap (stone protection)(12 in) (432-7041) | CY | 53 | $350.00 | $235.00 | $186.00 | $230.04 | $135.00 | $200.00 | $225.00 |
| 36 | Riprap (stone protection)(15 in) (432-7042) | CY | 678 | $300.00 | $200.00 | $188.00 | $167.71 | $155.00 | $208.00 | $250.00 |
| 37 | Riprap (stone protection)(24 in) (432-7045) | CY | 19 | $300.00 | $300.00 | $209.00 | $449.49 | $180.00 | $210.00 | $450.00 |
| 38 | Cleaning existing joints (438-7008) | LF | 112 | $65.00 | $115.00 | $31.00 | $41.00 | $10.00 | $80.00 | $100.00 |
| 39 | Rail (type SSTR) (450-7024) | LF | 573 | $175.00 | $285.00 | $109.00 | $212.35 | $250.00 | $222.00 | $150.00 |
| 40 | Retrofit rail (type SSTR)(HPC) (451-7025) | LF | 400 | $350.00 | $320.00 | $194.00 | $204.48 | $250.00 | $345.00 | $200.00 |
| 41 | Concrete box culvert (5 FT X 5 FT)(extend) (462-7064) | LF | 32 | $1,200.00 | $1,090.00 | $913.00 | $850.00 | $1,000.00 | $1,289.00 | $1,000.00 |
| 42 | RC pipe (CL III)(24 in) (464-7005) | LF | 16 | $500.00 | $120.00 | $189.00 | $160.00 | $120.00 | $125.00 | $240.00 |
| 43 | RC pipe (CL III)(30 in) (464-7007) | LF | 5 | $300.00 | $165.00 | $339.00 | $300.00 | $150.00 | $300.00 | $450.00 |
| 44 | RC pipe (CL III)(36 in) (464-7009) | LF | 72 | $200.00 | $260.00 | $208.00 | $325.00 | $175.00 | $340.00 | $300.00 |
| 45 | RC pipe (CL III)(60 in) (464-7013) | LF | 32 | $500.00 | $500.00 | $512.00 | $550.00 | $500.00 | $500.00 | $700.00 |
| 46 | Headwall (CH - FW - 0) (diameter= 30 in) (466-7007) | EACH | 1 | $13,000 | $8,100.00 | $8,550.00 | $5,187.48 | $5,000.00 | $10,500 | $10,000 |
| 47 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 2 | $16,000 | $10,800 | $8,300.00 | $10,500 | $6,000.00 | $12,000 | $15,000 |
| 48 | Headwall (CH - PW - 0) (diameter= 60 in) (466-7109) | EACH | 1 | $17,000 | $25,000 | $16,400 | $25,000 | $25,000 | $20,000 | $30,000 |
| 49 | Wingwall (PW - 2) (HW=10 FT) (466-7194) | EACH | 1 | $25,000 | $70,000 | $44,500 | $45,000 | $56,000 | $59,000 | $55,000 |
| 50 | Set (type II) (12 in) (CMP) (6: 1) (P) (467-7288) | EACH | 7 | $1,500.00 | $950.00 | $1,770.00 | $900.00 | $1,100.00 | $1,200.00 | $1,200.00 |
| 51 | Set (type II) (12 in) (RCP) (6: 1) (P) (467-7292) | EACH | 10 | $1,000.00 | $1,060.00 | $1,865.00 | $900.00 | $1,100.00 | $1,525.00 | $1,200.00 |
| 52 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 1 | $1,705.00 | $1,200.00 | $2,285.00 | $1,000.00 | $1,250.00 | $2,000.00 | $1,800.00 |
| 53 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 12 | $1,190.00 | $1,285.00 | $2,285.00 | $1,000.00 | $1,250.00 | $2,000.00 | $1,800.00 |
| 54 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 3 | $1,900.00 | $1,500.00 | $2,870.00 | $2,500.00 | $2,200.00 | $2,350.00 | $2,400.00 |
| 55 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 18 | $1,550.00 | $1,600.00 | $2,870.00 | $2,500.00 | $2,300.00 | $2,350.00 | $2,400.00 |
| 56 | Set (type II) (30 in) (CMP) (6: 1) (P) (467-7344) | EACH | 1 | $2,500.00 | $2,400.00 | $3,862.00 | $3,500.00 | $3,200.00 | $3,000.00 | $3,000.00 |
| 57 | Adjusting inlets (479-7002) | EACH | 2 | $12,000 | $5,000.00 | $1,275.00 | $2,000.00 | $2,500.00 | $2,500.00 | $5,000.00 |
| 58 | Removing structure (set) (496-7004) | EACH | 10 | $130.00 | $300.00 | $622.00 | $934.17 | $500.00 | $500.00 | $500.00 |
| 59 | Removing structure (wingwall) (496-7005) | EACH | 1 | $10,000 | $1,000.00 | $1,563.00 | $1,500.00 | $2,500.00 | $2,500.00 | $7,500.00 |
| 60 | Removing structure (headwall) (496-7006) | EACH | 4 | $8,000.00 | $1,000.00 | $1,777.00 | $1,500.00 | $2,500.00 | $1,000.00 | $2,000.00 |
| 61 | Removing structure (pipe) (496-7007) | LF | 16 | $25.00 | $30.00 | $22.70 | $60.00 | $50.00 | $30.00 | $350.00 |
| 62 | Mobilization (500-7001) | LS | 1 | $1,750,000 | $1,825,000 | $1,800,000 | $2,152,404 | $2,000,000 | $1,500,000 | $2,100,000 |
| 63 | Barricades, signs and traffic handling (502-7001) | MO | 35 | $35,000 | $18,300 | $32,000 | $35,000 | $10,000 | $100,000 | $54,000 |
| 64 | Portable changeable message sign (503-7002) | EACH | 4 | $20,000 | $18,000 | $5,960.00 | $18,000 | $20,000 | $25,000 | $20,000 |
| 65 | TMA (stationary) (505-7001) | DAY | 600 | $400.00 | $25.00 | $346.00 | $0.01 | $250.00 | $1.00 | $150.00 |
| 66 | TMA (mobile operation) (505-7003) | DAY | 42 | $400.00 | $25.00 | $678.00 | $1,135.39 | $550.00 | $1.00 | $1,000.00 |
| 67 | Rock filter dams (install) (type 3) (506-7003) | LF | 918 | $45.00 | $68.00 | $68.00 | $68.00 | $35.00 | $30.00 | $85.20 |
| 68 | Rock filter dams (remove) (506-7011) | LF | 918 | $17.00 | $15.00 | $15.00 | $15.00 | $20.00 | $5.00 | $47.93 |
| 69 | Construction exits (install) (type 1) (506-7020) | SY | 924 | $45.00 | $35.00 | $35.00 | $35.00 | $50.00 | $25.00 | $31.95 |
| 70 | Construction exits (remove) (506-7024) | SY | 924 | $15.00 | $15.00 | $15.00 | $15.00 | $20.00 | $5.00 | $17.57 |
| 71 | Temporary sediment control fence (install) (506-7039) | LF | 32,030 | $7.00 | $3.99 | $3.99 | $3.99 | $3.00 | $1.00 | $2.66 |
| 72 | Temporary sediment control fence (remove) (506-7041) | LF | 32,030 | $2.50 | $0.35 | $0.35 | $0.35 | $1.00 | $0.25 | $1.33 |
| 73 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 3,600 | $5.00 | $5.75 | $5.75 | $5.75 | $10.00 | $1.00 | $5.33 |
| 74 | Biodegradable erosion control logs (remove) (506-7046) | LF | 3,600 | $2.50 | $1.00 | $1.00 | $1.00 | $5.00 | $0.25 | $2.66 |
| 75 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 440 | $50.00 | $63.00 | $21.70 | $46.13 | $100.00 | $60.00 | $40.00 |
| 76 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 20 | $110.00 | $63.00 | $23.50 | $94.88 | $100.00 | $60.00 | $80.00 |
| 77 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 1,760 | $25.00 | $38.00 | $9.10 | $15.00 | $20.00 | $40.00 | $20.00 |
| 78 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 100 | $25.00 | $38.00 | $12.20 | $15.91 | $20.00 | $30.00 | $40.00 |
| 79 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 440 | $20.00 | $48.00 | $11.50 | $18.48 | $20.00 | $40.00 | $25.00 |
| 80 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 20 | $25.00 | $48.00 | $13.40 | $10.80 | $20.00 | $40.00 | $50.00 |
| 81 | Concrete curb (type II) (529-7002) | LF | 300 | $35.00 | $43.00 | $16.50 | $19.19 | $55.00 | $45.00 | $75.00 |
| 82 | Driveways (concrete) (530-7006) | SY | 78 | $275.00 | $300.00 | $156.00 | $138.40 | $100.00 | $125.00 | $280.00 |
| 83 | Driveways (ACP) (530-7010) | SY | 412 | $130.00 | $150.00 | $183.00 | $234.54 | $50.00 | $50.00 | $250.00 |
| 84 | Metal W-beam guard fence (timber post) (540-7001) | LF | 4,491.25 | $32.00 | $22.50 | $21.69 | $21.69 | $26.00 | $22.50 | $23.96 |
| 85 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 22 | $1,800.00 | $5,000.00 | $2,840.00 | $2,480.99 | $1,850.00 | $1,850.00 | $3,328.08 |
| 86 | Driveway terminal anchor section (540-7014) | EACH | 1 | $850.00 | $1,200.00 | $1,390.00 | $1,390.00 | $1,850.00 | $725.00 | $772.13 |
| 87 | Downstream anchor terminal section (540-7015) | EACH | 17 | $1,800.00 | $3,200.00 | $1,475.00 | $1,475.00 | $1,850.00 | $1,200.00 | $1,278.00 |
| 88 | Remove metal beam guard fence (542-7001) | LF | 4,883 | $5.00 | $2.50 | $2.50 | $2.50 | $3.00 | $2.50 | $2.66 |
| 89 | Remove terminal anchor section (542-7002) | EACH | 18 | $350.00 | $150.00 | $250.00 | $250.00 | $500.00 | $150.00 | $159.75 |
| 90 | Guardrail end treatment (install) (544-7001) | EACH | 20 | $2,000.00 | $5,000.00 | $3,355.00 | $3,355.00 | $3,850.00 | $2,950.00 | $3,141.75 |
| 91 | Guardrail end treatment (remove) (544-7003) | EACH | 17 | $350.00 | $250.00 | $250.00 | $250.00 | $1,500.00 | $250.00 | $266.25 |
| 92 | Pipe underdrains (type 6) (6") (556-7006) | LF | 400 | $40.00 | $40.00 | $30.80 | $57.72 | $50.00 | $65.00 | $40.61 |
| 93 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 7 | $225.00 | $500.00 | $275.00 | $275.00 | $850.00 | $300.00 | $372.75 |
| 94 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 1 | $250.00 | $400.00 | $325.00 | $325.00 | $850.00 | $350.00 | $356.78 |
| 95 | Mailbox install-M (TWW-post) type 4 (560-7010) | EACH | 1 | $580.00 | $1,000.00 | $790.00 | $790.00 | $850.00 | $900.00 | $660.30 |
| 96 | Install delineator assembly (D-SW)SZ 1(WFLX)SRF(BR) (658-7008) | EACH | 94 | $120.00 | $65.00 | $99.00 | $99.00 | $100.00 | $65.00 | $69.23 |
| 97 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 6 | $50.00 | $20.00 | $15.00 | $15.00 | $100.00 | $20.00 | $21.30 |
| 98 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 6 | $50.00 | $20.00 | $15.00 | $15.00 | $100.00 | $20.00 | $21.30 |
| 99 | Install delineator assembly (D-DY)SZ 1(BRF)GF2 (658-7052) | EACH | 122 | $50.00 | $25.00 | $25.00 | $25.00 | $100.00 | $25.00 | $26.63 |
| 100 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 108 | $10.00 | $160.00 | $25.00 | $25.00 | $100.00 | $50.00 | $26.63 |
| 101 | Install OM SM RD sign (1-OM-con)W (658-7086) | EACH | 37 | $10.00 | $160.00 | $25.00 | $25.00 | $100.00 | $50.00 | $26.63 |
| 102 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 14,283 | $0.75 | $0.30 | $0.38 | $0.38 | $0.65 | $0.30 | $0.32 |
| 103 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 56,632 | $0.50 | $0.20 | $0.38 | $0.38 | $0.65 | $0.20 | $0.21 |
| 104 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 56,632 | $0.50 | $0.20 | $0.38 | $0.38 | $0.65 | $0.20 | $0.21 |
| 105 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 4,725 | $2.25 | $0.84 | $0.90 | $0.50 | $5.00 | $1.00 | $4.00 |
| 106 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,260 | $0.75 | $0.87 | $0.90 | $0.90 | $4.00 | $0.87 | $0.93 |
| 107 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 238 | $1.25 | $3.00 | $2.75 | $2.75 | $6.00 | $3.00 | $3.20 |
| 108 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,352 | $14.00 | $6.20 | $6.00 | $6.00 | $12.00 | $6.20 | $6.60 |
| 109 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 18 | $150.00 | $170.00 | $195.00 | $195.00 | $250.00 | $170.00 | $181.05 |
| 110 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 4 | $175.00 | $221.00 | $405.00 | $405.00 | $500.00 | $221.00 | $235.37 |
| 111 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 18 | $175.00 | $160.00 | $225.00 | $225.00 | $250.00 | $160.00 | $170.40 |
| 112 | Reflectorized pavement marking type I(W)(entr gore)(100MIL) (666-7069) | EACH | 14 | $1,700.00 | $800.00 | $1,000.00 | $1,000.00 | $1,500.00 | $800.00 | $852.00 |
| 113 | Reflectorized pavement marking type I(W)(exit gore)(100MIL) (666-7072) | EACH | 14 | $1,400.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,500.00 | $1,000.00 | $1,065.00 |
| 114 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 2,354 | $1.00 | $1.05 | $0.90 | $0.90 | $4.00 | $1.05 | $1.12 |
| 115 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 2,775 | $8.63 | $6.20 | $6.00 | $6.00 | $12.00 | $6.20 | $6.60 |
| 116 | Pavement sler 6" (666-7347) | LF | 53,985 | $0.50 | $0.19 | $0.20 | $0.20 | $0.75 | $0.19 | $0.20 |
| 117 | Pavement sler 8" (666-7348) | LF | 2,642 | $0.65 | $0.31 | $0.20 | $0.20 | $4.00 | $0.31 | $0.33 |
| 118 | Pavement sler 24" (666-7352) | LF | 2,849 | $0.90 | $1.25 | $0.49 | $0.49 | $12.00 | $1.25 | $1.33 |
| 119 | Pavement sler (arrow) (666-7353) | EACH | 2 | $6.00 | $50.00 | $12.50 | $12.50 | $250.00 | $50.00 | $53.25 |
| 120 | Pavement sler (uturn arrow) (666-7358) | EACH | 2 | $6.00 | $60.00 | $18.00 | $18.00 | $250.00 | $60.00 | $63.90 |
| 121 | Pavement sler (entr gore) (666-7361) | EACH | 10 | $35.00 | $300.00 | $200.00 | $200.00 | $500.00 | $300.00 | $319.50 |
| 122 | Pavement sler (exit gore) (666-7362) | EACH | 10 | $35.00 | $400.00 | $200.00 | $200.00 | $500.00 | $400.00 | $426.00 |
| 123 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 18,113 | $0.90 | $0.70 | $0.60 | $0.60 | $0.65 | $0.70 | $0.75 |
| 124 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 97,437 | $0.85 | $0.52 | $0.49 | $0.49 | $0.65 | $0.52 | $0.55 |
| 125 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 103,820 | $0.75 | $0.52 | $0.49 | $0.49 | $0.65 | $0.52 | $0.55 |
| 126 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,049 | $7.50 | $3.75 | $3.50 | $3.50 | $5.00 | $3.75 | $3.99 |
| 127 | Eliminating existing PM & markers (6") (677-7002) | LF | 53,985 | $0.50 | $0.35 | $0.45 | $0.45 | $0.65 | $0.35 | $0.37 |
| 128 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,642 | $0.65 | $0.70 | $0.60 | $0.60 | $3.00 | $0.70 | $0.75 |
| 129 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,028 | $1.25 | $1.50 | $1.00 | $1.00 | $6.00 | $1.50 | $1.60 |
| 130 | Eliminating existing PM & markers (24") (677-7008) | LF | 692 | $2.00 | $2.75 | $2.75 | $2.75 | $12.00 | $2.75 | $2.93 |
| 131 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $110.00 | $65.00 | $50.00 | $50.00 | $250.00 | $65.00 | $69.23 |
| 132 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 2 | $10.00 | $85.00 | $75.00 | $75.00 | $250.00 | $85.00 | $90.53 |
| 133 | Eliminating existing PM & markers (word) (677-7015) | EACH | 6 | $65.00 | $75.00 | $50.00 | $50.00 | $250.00 | $75.00 | $79.88 |
| 134 | Eliminating existing PM & markers (entr gore) (677-7016) | EACH | 10 | $300.00 | $300.00 | $250.00 | $250.00 | $1,500.00 | $300.00 | $319.50 |
| 135 | Eliminating existing PM & markers (exit gore) (677-7017) | EACH | 10 | $300.00 | $500.00 | $250.00 | $250.00 | $1,500.00 | $500.00 | $532.50 |
| 136 | Pavement surface preparation for marking (6") (678-7002) | LF | 53,985 | $0.75 | $0.02 | $0.05 | $0.05 | $0.65 | $0.02 | $0.02 |
| 137 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,642 | $0.85 | $0.10 | $0.07 | $0.07 | $4.00 | $0.10 | $0.11 |
| 138 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,849 | $1.00 | $0.20 | $0.18 | $0.18 | $12.00 | $0.20 | $0.21 |
| 139 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $10.00 | $20.00 | $5.00 | $5.00 | $250.00 | $20.00 | $21.30 |
| 140 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 2 | $10.00 | $25.00 | $5.00 | $5.00 | $250.00 | $25.00 | $26.63 |
| 141 | Pavement surface preparation for marking (word) (678-7016) | EACH | 6 | $10.00 | $30.00 | $5.00 | $5.00 | $250.00 | $30.00 | $31.95 |
| 142 | Pavement surface preparation for marking (entr gore) (678-7017) | EACH | 10 | $25.00 | $50.00 | $50.00 | $50.00 | $500.00 | $50.00 | $53.25 |
| 143 | Pavement surface preparation for marking (exit gore) (678-7018) | EACH | 10 | $25.00 | $75.00 | $50.00 | $50.00 | $500.00 | $75.00 | $79.88 |
| 144 | Full - width mowing (730-7019) | CYC | 2 | $10,000 | $10,000 | $1,000.00 | $10,000 | $1,500.00 | $10,000 | $10,000 |
| 145 | Ditch cleaning and reshaping (foot) (760-7001) | LF | 480 | $3.40 | $15.00 | $10.20 | $8.49 | $25.00 | $10.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.