Bridge Maintenance, SH 16 (AT OATMAN CREEK to .). Let by Texas DOT on March 5, 2025, Llano, Austin District. 10 bids received; low bid $2,089,129 by Structural Integrity Group LLC, +8.8% against the engineer's estimate of $1,920,191.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 59
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Structural Integrity Group LLC | $2,089,129 | Low | +9.0% |
| 2 | 3LW Civil LLC | $2,263,826 | +8.0% | +18% |
| 3 | Garret Shields Infrastructure | $2,378,681 | +14% | +24% |
| 4 | Built Right Construction of Oklahoma, LLC | $2,421,432 | +16% | +26% |
| 5 | MPB, Inc. | $2,485,992 | +19% | +29% |
| 6 | Relmco, Inc. | $2,579,444 | +23% | +34% |
| 7 | MB Western Industrial Contracting Co. | $2,698,666 | +29% | +41% |
| 8 | Cekra Inc. | $2,858,566 | +37% | +49% |
| 9 | Restek, Inc. | $2,906,997 | +39% | +51% |
| 10 | Grey Sky Construction LLC | $3,196,495 | +53% | +66% |
Engineer's estimate: $1,920,191.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Structural Integrity Group LLC | 2. 3LW Civil LLC | 3. Garret Shields Infrastructure | 4. Built Right Construction of Oklahoma, LLC | 5. MPB, Inc. | 6. Relmco, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 2 | $3,200.00 | $500.00 | $5,000.00 | $3,000.00 | $5,000.00 | $30,000 | |
| 2 | Removing concrete (pile encasement) (104-7033) | CY | 45 | $280.00 | $1,000.00 | $1,000.00 | $500.00 | $195.00 | $1,500.00 | |
| 3 | Planing asphalt concrete pavement (0" to 2" micro) (354-7046) | SY | 1,612 | $6.50 | $31.00 | $39.60 | $5.00 | $45.00 | $24.50 | $35.00 |
| 4 | Class C concrete (pile encasement) (420-7060) | CY | 101 | $925.00 | $681.00 | $1,200.00 | $200.00 | $4,000.00 | $1,850.00 | |
| 5 | Class C concrete (column encasement) (420-7064) | CY | 10 | $800.00 | $0.10 | $200.00 | $200.00 | $4,300.00 | $2,500.00 | |
| 6 | Penetrating concrete surface treatment (428-7001) | SY | 562 | $27.00 | $18.50 | $21.60 | $30.00 | $25.00 | $19.00 | $19.80 |
| 7 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 166 | $145.00 | $230.00 | $149.66 | $200.00 | $285.00 | $120.00 | $250.00 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 108.65 | $690.00 | $650.00 | $679.10 | $600.00 | $800.00 | $640.00 | $550.00 |
| 9 | Riprap (stone protection)(24 in) (432-7045) | CY | 135 | $285.00 | $316.67 | $300.00 | $300.00 | $165.00 | $200.00 | |
| 10 | Cleaning and sealing existing joints (438-7001) | LF | 868 | $78.35 | $36.00 | $60.53 | $50.00 | $65.00 | $23.00 | $60.00 |
| 11 | Polyester polymer concrete overlay (2") (439-7017) | SY | 1,612 | $240.00 | $290.00 | $351.70 | $480.00 | $300.00 | $435.00 | $350.00 |
| 12 | STR steel (miscellaneous bridge) (442-7008) | LB | 150 | $30.00 | $65.00 | $100.00 | $60.00 | $30.00 | $100.00 | |
| 13 | Clean & paint existing STR (system II) (446-7002) | LS | 1 | $30,000 | $105,800 | $107,800 | $90,000 | $150,000 | $103,000 | $105,350 |
| 14 | Clean & paint existing piling (system I) (446-7007) | LS | 1 | $135,000 | $137,500 | $120,000 | $165,000 | $131,250 | $161,250 | |
| 15 | Clean & paint existing piling (system II) (446-7008) | LS | 1 | $47,750 | $49,500 | $75,000 | $65,000 | $47,250 | $80,625 | |
| 16 | Retrofit rail (type T221) (451-7004) | LF | 180 | $114.00 | $325.00 | $414.67 | $150.00 | $250.00 | $225.00 | $250.00 |
| 17 | Retrofit rail (type T631) (451-7020) | LF | 590 | $110.00 | $183.59 | $150.00 | $175.00 | $105.00 | $102.85 | |
| 18 | Mobilization (500-7001) | LS | 1 | $144,976 | $190,000 | $204,253 | $150,000 | $240,000 | $118,000 | $205,000 |
| 19 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $8,000.00 | $4,350.00 | $5,150.00 | $5,000.00 | $500.00 | $2,500.00 | $7,500.00 |
| 20 | Portable changeable message sign (503-7001) | DAY | 221 | $172.83 | $80.00 | $150.00 | $100.00 | $75.00 | $145.00 | $300.00 |
| 21 | TMA (stationary) (505-7001) | DAY | 35 | $331.07 | $250.00 | $185.00 | $300.00 | $350.00 | $250.00 | $300.00 |
| 22 | TMA (mobile operation) (505-7003) | DAY | 8 | $387.34 | $250.00 | $0.10 | $300.00 | $350.00 | $250.00 | $300.00 |
| 23 | Temporary sediment control fence (install) (506-7039) | LF | 350 | $8.00 | $1.00 | $3.50 | $6.00 | $6.00 | $5.00 | $10.00 |
| 24 | Temporary sediment control fence (remove) (506-7041) | LF | 350 | $1.25 | $1.00 | $1.50 | $1.00 | $3.00 | $1.00 | $5.00 |
| 25 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 400 | $8.00 | $1.00 | $0.10 | $10.00 | $9.00 | $10.00 | $15.00 |
| 26 | Biodegradable erosion control logs (remove) (506-7046) | LF | 400 | $3.20 | $1.00 | $0.10 | $2.00 | $3.00 | $1.00 | $5.00 |
| 27 | One-way traffic control (port traffic signal) (510-7003) | MO | 6 | $6,250.00 | $4,600.00 | $8,500.00 | $6,000.00 | $5,000.00 | $4,000.00 | $4,500.00 |
| 28 | PCTB (fur&inst)(F-shape or SNGL SLP)type 1 (512-7089) | LF | 180 | $88.00 | $36.41 | $120.00 | $130.00 | $145.00 | $70.00 | |
| 29 | PCTB (move)(F-shape or SNGL SLP)type 1 (512-7090) | LF | 630 | $46.55 | $35.00 | $36.41 | $20.00 | $45.00 | $75.00 | $30.00 |
| 30 | PCTB (remove)(F-shape or SNGL SLP)type 1 (512-7092) | LF | 180 | $21.41 | $60.00 | $36.41 | $20.00 | $100.00 | $75.00 | $40.00 |
| 31 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,701 | $30.00 | $30.00 | $27.26 | $40.00 | $45.00 | $47.35 | $28.05 |
| 32 | Metal W-beam guard fence (steel post) (540-7002) | LF | 320 | $158.00 | $32.00 | $40.00 | $45.00 | $37.00 | $148.50 | |
| 33 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $2,300.00 | $2,737.80 | $3,000.00 | $2,500.00 | $2,337.00 | $2,145.00 | |
| 34 | Metal beam guard fence trans (T101) (540-7007) | EACH | 4 | $2,050.00 | $2,030.60 | $1,500.00 | $750.00 | $525.00 | $1,925.00 | |
| 35 | Remove metal beam guard fence (542-7001) | LF | 2,171 | $3.00 | $3.00 | $1.50 | $5.00 | $6.00 | $3.15 | $2.75 |
| 36 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,105.00 | $3,500.00 | $3,601.00 | $3,500.00 | $4,500.00 | $4,200.00 | $3,245.00 |
| 37 | Guardrail end treatment (remove) (544-7003) | EACH | 16 | $250.00 | $300.00 | $425.00 | $500.00 | $650.00 | $525.00 | $275.00 |
| 38 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 10 | $2,155.00 | $1,225.00 | $1,500.00 | $1,000.00 | $2,500.00 | $1,000.00 | $800.00 |
| 39 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $1,320.17 | $1,160.00 | $750.00 | $1,000.00 | $1,750.00 | $790.00 | $600.00 |
| 40 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $9,150.00 | $7,040.00 | $10,000 | $12,500 | $7,560.00 | $9,000.00 | |
| 41 | Wire fence (type A) (552-7001) | LF | 254 | $42.00 | $0.10 | $10.00 | $35.00 | $25.00 | $25.00 | |
| 42 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 38 | $50.00 | $45.00 | $44.00 | $40.00 | $55.00 | $42.00 | $50.00 |
| 43 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 2,746 | $0.20 | $1.90 | $1.92 | $2.00 | $4.00 | $1.68 | $1.65 |
| 44 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 88 | $5.30 | $1.90 | $1.92 | $2.00 | $22.00 | $1.68 | $22.00 |
| 45 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 20,000 | $0.20 | $1.90 | $1.92 | $2.00 | $2.00 | $1.68 | $1.65 |
| 46 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 480 | $1.25 | $2.50 | $2.50 | $2.00 | $0.25 | $2.50 | $6.00 |
| 47 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 13,084 | $0.30 | $1.90 | $1.92 | $2.00 | $3.00 | $1.68 | $1.93 |
| 48 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 1,300 | $1.90 | $1.92 | $2.00 | $3.50 | $1.68 | $1.93 | |
| 49 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 10,640 | $0.30 | $1.90 | $1.92 | $2.00 | $3.00 | $1.68 | $1.93 |
| 50 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 13,084 | $1.20 | $3.25 | $3.30 | $3.00 | $4.50 | $2.90 | $3.30 |
| 51 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 10,640 | $2.30 | $3.25 | $3.30 | $3.00 | $4.50 | $2.90 | $3.30 |
| 52 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 1,300 | $3.25 | $3.30 | $3.00 | $5.50 | $2.90 | $3.30 | |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 600 | $4.00 | $18.50 | $19.20 | $18.00 | $7.00 | $16.80 | $16.50 |
| 54 | Eliminating existing PM & markers (4") (677-7001) | LF | 40,322 | $0.50 | $0.60 | $0.62 | $0.65 | $1.00 | $0.55 | $1.15 |
| 55 | Eliminating existing PM & markers (6") (677-7002) | LF | 22,746 | $0.80 | $0.60 | $0.62 | $0.65 | $1.00 | $0.55 | $1.15 |
| 56 | Eliminating existing PM & markers (24") (677-7008) | LF | 88 | $2.55 | $2.95 | $3.00 | $3.00 | $6.00 | $2.65 | $11.00 |
| 57 | Driftwood removal (735-7060) | CY | 170 | $120.00 | $116.24 | $120.00 | $100.00 | $30.00 | $100.00 | |
| 58 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 10 | $900.00 | $150.00 | $800.00 | $2,500.00 | $250.00 | $1,250.00 | |
| 59 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 6 | $1,500.00 | $150.00 | $1,500.00 | $3,500.00 | $1,000.00 | $1,750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way