TxDOT contract A00206294 bid tabulation

Intersection Improvement, BS 6R (Old Hearne Road to FM 158). Let by Texas DOT on May 1, 2025, Brazos, Bryan District. 4 bids received; low bid $4,454,973 by Larry Young Paving, Inc., -8.8% against the engineer's estimate of $4,885,537.

Owner
Texas DOT
Letting
01 MAY 2025
Pay items
152
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Larry Young Paving, Inc.$4,454,973Low-9.0%
2Brazos Paving, Inc.$4,800,359+8.0%-2.0%
3Ti-Zack Concrete, LLC$5,287,973+19%+8.0%
4Knife River Corporation - South$5,391,744+21%+10%
TxDOT contract A00206294: bids by rank

Engineer's estimate: $4,885,537.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Larry Young Paving, Inc.2. Brazos Paving, Inc.3. Ti-Zack Concrete, LLC4. Knife River Corporation - South
1Preparing row (100-7001)ACRE1.03$25,000$11,000$17,575$11,500$43,400
2Preparation row (tree remove) (0"-12" diameter) (100-7003)EACH6$790.00$775.00$977.50$667.00
3Preparation row (tree remove) (12"-24" diameter) (100-7004)EACH17$1,200.00$1,214.00$1,437.50$1,046.00
4Preparation row (tree remove) (24"-36" diameter) (100-7005)EACH4$2,500.00$2,325.00$6,037.50$2,000.00
5Preparation row (tree remove) (36"-48" diameter) (100-7006)EACH1$3,600.00$4,650.00$8,625.00$4,000.00
6Tree protection (install) (100-7013)EACH160$590.00$170.00$165.00$17.25$140.00
7Removing concrete (pavement) (104-7001)SY95$14.00$68.50$21.00$57.60
8Removing concrete (medians) (104-7008)SY326$14.00$85.00$24.48$29.80
9Removing concrete (pavers) (104-7010)SY185$14.00$45.00$21.57$32.40
10Removing concrete (driveways) (104-7011)SY529$14.00$68.70$30.17$37.74
11Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY1,015$14.00$49.60$31.45$51.80
12Removing concrete (curb or curb & gutter) (104-7018)LF2,072$13.00$15.21$11.55$79.12
13Removing concrete (miscellaneous) (104-7046)SY53$14.00$73.15$30.11$32.80
14Remove (5"-9") TRT/untrt base & asphalt pavement (105-7005)SY40$20.00$105.55$39.90$42.00
15Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012)SY2,528$29.00$28.50$18.94$22.30
16Furn & place topsoil (4") (160-7002)SY1,424$3.50$10.50$7.81$14.00
17General use compost (2") (161-7011)SY2,604.40$3.00$5.25$5.15$4.80$10.00
18Block sodding (162-7002)SY1,424$9.75$9.70$11.45$8.33
19Fertilizer (166-7001)ACRE0.29$8,200.00$8,000.00$937.08$2,000.00
20Vegetative watering (168-7001)TGL14.24$77.00$54.75$276.54$70.00
21Irrigation system (type II) (170-7003)EACH1$120,000$55,000$199,108$279,976$171,470
22Soil amend (type I) (192-7008)SY2,604.40$0.20$1.00$0.94$1.02$0.90
23Plant bed preparation (type II) (192-7011)SY2,604.40$0.85$8.25$7.90$33.35$6.83
24Landscape edge (type I) (192-7017)LF2,407$8.90$13.00$12.85$22.68$11.06
25Loose aggregate GRND cover (type I) (192-7024)CY602.20$215.00$150.00$143.00$231.91$123.05
26Plant material (1 gal) (shrub) (192-7044)EACH2,938$15.00$15.00$13.80$16.88$11.88
27Plant material (3 gal) (shrub) (192-7046)EACH3,150$30.00$50.00$49.20$41.58$42.22
28Soil amend (type II) (192-7084)SY2,604.40$0.20$0.75$0.65$1.02$0.54
29Soil amend (type III) (192-7085)SY2,604.40$2.00$1.25$1.15$2.91$1.00
30Landscape establish (193-7001)MO12$6,500.00$1,900.00$1,860.00$10,279$1,602.00
31Landscape establish (193-7002)CYC6$12,500$2,100.00$4,020.00$17,694$3,462.00
32Landscape treat (type III) (193-7036)CYC1$2,597.00$160.00$1,885.00$57,803$1,700.00
33CM TRT(PT MX)(CL M)(type D)(GR 4)(FN pos) (276-7091)CY191$280.00$146.60$517.50$338.20
34Prime coat (AE-P) (310-7001)GAL239$36.00$6.80$11.50$53.00
35D-GR HMA type D PG64-22 (341-7043)TON9$540.00$882.00$402.50$3,834.00
36SP mixes SP-B PG64-22 (344-7001)TON502$260.00$155.60$294.40$354.00
37SP mixes SP-C sac-A PG76-22 (344-7030)TON1,164$200.00$152.30$294.40$270.73
38Planing asphalt concrete pavement(2") (354-7051)SY2,024$5.00$6.50$11.50$14.00
39Planing asphalt concrete pavement(3") (354-7052)SY6,248$5.75$7.50$13.80$6.74
40Cut & restoring pavement (400-7006)SY4$440.00$967.00$126.50$694.00
41Cem stabil BKFL (400-7010)CY18$140.00$117.50$287.50$220.00
42Trench excavation protection (402-7001)LF13$3.25$87.80$115.00$171.00
43Drilled shaft (traffic signal pole) (24 in) (416-7042)LF60$200.00$155.10$138.23$134.00
44Drilled shaft (traffic signal pole) (30 in) (416-7043)LF22$270.00$220.90$196.88$190.00
45Drilled shaft (traffic signal pole) (36 in) (416-7044)LF65$280.00$256.85$228.76$221.00
46Drilled shaft (traffic signal pole) (48 in) (416-7046)LF88$350.00$412.20$367.39$355.00
47Class A concrete (collar) (420-7008)EACH1$5,600.00$1,584.60$2,593.25$2,430.00
48Riprap (concrete)(5 in) (432-7002)CY2$1,000.00$886.10$784.69$1,104.00
49RC pipe (CL III)(36 in) (464-7009)LF10$610.00$528.60$327.75$800.00
50Inlet (complete)(type AZ)(hou) (465-7316)EACH1$11,000$12,850$18,400$9,275.00
51Adjusting inlets (479-7002)EACH1$3,700.00$4,037.00$2,300.00$6,360.00
52Adjusting inlets (cap) (479-7006)EACH1$2,300.00$5,105.00$1,725.00$6,100.00
53Mobilization (500-7001)LS1$425,000$388,000$285,000$489,987$322,000
54Barricades, signs and traffic handling (502-7001)MO18$11,000$3,900.00$16,485$3,450.00$20,500
55Portable changeable message sign (503-7002)EACH2$11,000$38,320$1.15$15,000
56TMA (stationary) (505-7001)DAY83$320.00$225.00$1.15$500.00
57TMA (mobile operation) (505-7003)DAY7$1,100.00$495.00$1.15$950.00
58Biodegradable erosion control logs (install) (8") (506-7043)LF45$5.75$12.91$1.15$11.00
59Biodegradable erosion control logs (remove) (506-7046)LF45$1.00$6.46$1.15$5.50
60Landscape pavers (528-7001)SY592$180.00$126.60$233.45$120.00
61Concrete curb (mono) (type II) (529-7007)LF512$15.00$19.20$60.43$43.00
62Concrete curb & gutter (type II) (529-7009)LF1,869$49.00$36.20$60.43$100.60
63Intersections (concrete) (530-7001)SY134$200.00$116.20$177.93$193.00
64Intersections (ACP) (530-7002)SY724$56.00$65.80$115.00$332.90
65Driveways (concrete) (hes) (530-7007)SY835$140.00$132.00$162.39$207.34
66Concrete sidewalks (6") (531-7003)SY1,488$110.00$98.60$131.85$175.00
67Curb ramps (type 1) (531-7005)EACH2$2,100.00$1,575.00$2,606.78$1,730.00
68Curb ramps (type 6) (531-7009)EACH2$2,100.00$3,330.00$2,606.78$2,561.00
69Curb ramps (type 7) (531-7010)EACH11$2,200.00$2,545.00$2,606.78$3,225.00
70Curb ramps (type 10) (531-7011)EACH2$2,200.00$2,545.00$2,606.78$3,337.00
71Curb ramps (type 21) (531-7013)EACH1$2,800.00$1,836.00$2,606.78$1,954.00
72Concrete median (536-7002)SY21$460.00$185.00$145.12$1,280.00
73Concrete median (nose) (536-7005)SY6$520.00$218.60$168.50$735.00
74Conduit (PVC) (schedule 80) (2") (618-7054)LF790$21.00$14.00$26.85$17.19$16.60
75Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF1,740$33.25$19.00$27.35$24.39$23.57
76Conduit (PVC) (schedule 80) (3") (618-7060)LF375$13.00$29.35$19.42$18.80
77Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF90$21.00$29.85$26.62$25.72
78Conduit (PVC) (schedule 80) (4") (618-7064)LF265$15.00$25.35$22.01$21.27
79Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF800$23.00$36.80$32.81$31.70
80ITS multi-duct CND (PVC-80) (619-7005)LF5,190$26.50$39.00$27.90$18.16$17.54
81ITS multi-duct CND (PVC-80)(bore) (619-7006)LF21,215$25.00$22.00$20.20$18.01$17.40
82ITS multi-duct CND (RMC) (619-7008)LF200$250.00$137.10$122.21$118.00
83Fiber optic cable road marker (619-7013)LF46$160.00$100.00$176.20$157.03$152.00
84Electrical conductor (no.8) insulated (620-7008)LF3,100$2.25$3.00$2.73$2.63
85Electrical conductor (no.6) bare (620-7009)LF2,100$2.25$3.20$2.86$2.77
86Electrical conductor (no.4) bare (620-7011)LF70$2.75$4.20$3.73$3.60
87Electrical conductor (no.4) insulated (620-7012)LF120$3.25$4.65$4.16$4.02
88ITS GND box(pcast) type 2 (366036) (623-7007)EACH11$11,000$6,900.00$8,950.00$7,979.07$7,709.00
89ITS GND box(pcast) type 2 (366036)W/aprn (623-7008)EACH4$6,900.00$9,355.00$8,338.63$8,057.00
90Ground box type D (162922) (624-7007)EACH18$1,500.00$1,000.00$1,105.00$985.44$952.00
91Ground box type D (162922)W/apron (624-7008)EACH32$1,800.00$1,100.00$1,509.00$1,345.01$1,300.00
92Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147)EACH3$8,200.00$9,553.00$8,514.60$8,227.00
93Aluminum signs (type A) (636-7001)SF299$61.00$45.00$31.14$33.00
94Relocate SM RD SN sup&AM type TWT (644-7068)EACH1$730.00$710.00$656.88$635.00
95Remove SM RD SN sup&AM (644-7073)EACH2$200.00$194.00$86.25$84.00
96Work zone pavement marking removing (W)6"(solid) (662-7068)LF5,050$2.75$2.70$1.27$1.22
97Work zone pavement marking removing (Y)6"(solid) (662-7100)LF5,540$2.75$2.70$1.27$1.22
98Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,220$3.25$3.25$2.01$1.94
99Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF1,195$12.00$11.75$10.35$10.00
100Pavement sler 6" (666-7347)LF830$1.25$1.30$0.21$1.00
101Pavement sler 8" (666-7348)LF1,140$1.25$1.30$0.28$0.30
102Pavement sler 24" (666-7352)LF370$4.00$3.90$0.83$0.90
103Pavement sler (arrow) (666-7353)EACH14$33.00$32.25$5.75$6.00
104Pavement sler (word) (666-7354)EACH14$33.00$32.25$5.75$6.00
105Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF390$4.00$3.90$1.32$1.30
106Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF830$2.75$2.60$1.32$1.30
107Prefabricated PM type C (W)(arrow) (668-7091)EACH14$460.00$451.60$323.58$313.00
108Prefabricated PM type C (W)(word) (668-7103)EACH14$540.00$529.00$353.03$340.00
109Reflectorized pavement marker type I-C (672-7002)EACH90$12.00$11.60$11.50$11.00
110Reflectorized pavement marker type II-A-A (672-7004)EACH4$12.00$11.60$11.50$11.00
111Eliminating existing PM & markers (6") (677-7002)LF4,180$2.75$2.60$3.70$3.60
112Pavement surface preparation for marking (6") (678-7002)LF830$1.25$1.30$0.02$1.00
113Pavement surface preparation for marking (8") (678-7004)LF1,140$1.25$1.30$0.05$1.00
114Pavement surface preparation for marking (24") (678-7008)LF370$4.00$3.90$0.14$0.20
115Pavement surface preparation for marking (arrow) (678-7009)EACH14$20.00$19.37$5.75$6.00
116Pavement surface preparation for marking (word) (678-7016)EACH14$20.00$19.37$5.75$6.00
117Install highway traffic signal (isolated) (680-7002)EACH3$70,000$43,292$38,587$37,283
118Removing traffic signals (680-7004)EACH8$6,400.00$5,120.00$1,803.20$1,744.00
119Vehicle signal section (12")LED(green) (682-7001)EACH25$250.00$331.00$294.40$285.00
120Vehicle signal section (12")LED(green arrow) (682-7002)EACH8$250.00$331.00$294.40$285.00
121Vehicle signal section (12")LED(yel) (682-7003)EACH25$250.00$331.00$294.40$285.00
122Vehicle signal section (12")LED(yel arrow) (682-7004)EACH14$250.00$331.00$294.40$285.00
123Vehicle signal section (12")LED(red) (682-7005)EACH25$250.00$331.00$294.40$285.00
124Vehicle signal section (12")LED(red arrow) (682-7006)EACH8$250.00$331.00$294.40$285.00
125Pedestrian signal section (LED)(countdown) (682-7018)EACH18$590.00$845.40$753.25$728.00
126Backplate W/reflectorized border(3 sec)aluminum (682-7039)EACH27$170.00$198.65$175.95$171.00
127Backplate W/reflectorized border(4 sec)aluminum (682-7040)EACH6$220.00$251.80$224.25$217.00
128Traffic signal CBL (type A)(14 AWG)(1 conductor) (684-7027)LF26,405$1.40$1.25$2.25$2.01$1.94
129Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF2,625$2.25$3.00$2.67$2.58
130Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF2,335$3.00$3.50$3.08$2.98
131Traffic signal CBL (type A)(14 AWG)(9 conductor) (684-7035)LF985$2.50$4.11$3.66$3.53
132Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF2,570$1.50$2.40$2.15$2.08
133Ins traffic signal PL AM(S)1 arm(24')lum (686-7027)EACH1$14,000$17,008$15,159$14,647
134Ins traffic signal PL AM(S)1 arm(28')lum (686-7031)EACH1$14,000$17,420$15,525$15,000
135Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH1$17,000$20,136$17,948$17,341
136Ins traffic signal PL AM(S)1 arm(44')lum (686-7047)EACH2$18,000$21,466$19,134$18,487
137Ins traffic signal PL AM(S)1 arm(50')lum (686-7055)EACH3$42,000$51,127$45,571$44,030
138Ins traffic signal PL AM(S)2 arm(40-28')lum (686-7139)EACH1$20,000$23,700$21,117$20,400
139Ins traffic signal PL AM(S)2 arm(50 - 40')lum (686-7191)EACH1$44,000$52,635$46,914$45,300
140Pedestrian pole assembly (687-7001)EACH10$1,500.00$3,535.00$3,148.70$3,040.00
141Pedestrian detect push button (APS) (688-7001)EACH18$1,200.00$1,281.00$1,142.24$1,104.00
142Bonding course (3007-7001)GAL883$7.75$7.65$11.50$5.00
143Bbu system (external battery cabinet) (6007-7001)EACH3$8,600.00$12,250$10,918$10,550
144VDS prosr sys (6017-7001)EACH3$14,000$17,460$15,562$15,036
145VIVDS cam assy var LNS (6017-7003)EACH12$6,100.00$8,270.00$7,370.35$7,122.00
146VDS CNTRL software (6017-7009)EACH3$540.00$808.00$719.90$696.00
147VDS atspm (6017-7010)EACH3$4,200.00$5,243.00$4,672.45$4,515.00
148VDS cabling (6017-7012)LF1,880$1.75$3.80$3.37$3.26
149CCTV field equipment (digital) (6018-7002)EACH3$2,000.00$3,725.00$3,318.90$3,207.00
150ITS com CBL (ethernet) (6018-7004)LF275$2.75$7.90$7.04$6.80
151Fiber optic CBL (single-mode)(12 fiber) (6027-7001)LF1,270$6.85$1.75$7.95$7.08$6.84
152Fiber optic CBL (SNGL-mode)(72 fiber) (6027-7014)LF52,810$2.55$2.50$3.05$2.71$2.62
TxDOT contract A00206294: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy