Award Construction, Inc.: WSDOT bid record
Award Construction, Inc. submitted 16 bids on Washington State DOT contracts in the data, from 11 FEB 2009 to 12 JAN 2022, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $2,499,805
- Latest bid
- 12 JAN 2022
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2009 | 2 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 1 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 2 | 0 | 0% |
| 2015 | 1 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2017 | 2 | 0 | 0% |
| 2018 | 3 | 0 | 0% |
| 2020 | 1 | 1 | 100% |
| 2022 | 1 | 1 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NWR region | 13 | 2 | 15% |
| OR region | 1 | 0 | 0% |
| NCR region | 1 | 0 | 0% |
| SCR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Roadway excavation including haul | CY | 13 | 3 (23%) | $28.00 | $20.00 | |
| Crushed surfacing base course | TON | 12 | 2 (17%) | $32.25 | $26.44 | |
| Flexible guide post | EACH | 9 | 2 (22%) | $68.00 | $33.23 | |
| Plastic traffic arrow | EACH | 8 | 2 (25%) | $240.00 | $135.00 | |
| Construction signs class A | SF | 5 | 2 (40%) | $21.25 | $16.21 | |
| Plastic wide lane line | LF | 5 | 2 (40%) | $5.00 | $3.23 | |
| Erosion and sediment control lead | DAY | 10 | 1 (10%) | $112.50 | $100.00 | |
| Embankment compaction | CY | 10 | 1 (10%) | $14.50 | $3.50 | |
| Planing bituminous pavement | SY | 8 | 1 (13%) | $12.75 | $4.75 | |
| Plastic drainage marking | EACH | 8 | 1 (13%) | $122.50 | $34.00 | |
| Clearing and grubbing | ACRE | 7 | 1 (14%) | $48,500 | $8,000.00 | |
| Raised pavement marker type 2 | HUND | 6 | 1 (17%) | $572.50 | $478.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Interwest Construction, Inc. | 9 | 8 of 9 |
| Granite Construction Company | 8 | 4 of 8 |
| Strider Construction Co., Inc. | 7 | 5 of 7 |
| Colacurcio Brothers, Inc. | 7 | 5 of 7 |
| Ram Construction General | 6 | 4 of 6 |
| Tiger Construction, LTD. | 5 | 5 of 5 |
| SRV Construction, Inc. | 3 | 0 of 3 |
| Trimaxx Construction, Inc. | 3 | 3 of 3 |
| Razz Construction, Inc. | 2 | 2 of 2 |
| Jansen Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JAN 2022 | 009758 | NWR region | Sr 525 clinton ferry terminal vicinity pedestrian connectivity | 1 of 1 | $1,756,076 | Low |
| 08 JAN 2020 | 009503 | NWR region | Sr 524 yew way railroad crossing improvements | 1 of 2 | $743,729 | Low, 61% under the second |
| 28 FEB 2018 | 009218 | NWR region | Sr 548 kickerville rd intersection improvement | 2 of 5 | $573,013 | +1.0% |
| 07 FEB 2018 | 009196 | SCR region | I-182 queensgate dr - interchange improvements | 6 of 6 | $3,158,798 | +32% |
| 10 JAN 2018 | 009194 | NWR region | Sr 9 136th st se vic to sr 96 vic channelization | 2 of 4 | $856,980 | +5.0% |
| 13 DEC 2017 | 009172 | NWR region | Sr 542 sr 9 east junction intersection improvements | 3 of 8 | $1,037,828 | +5.0% |
| 05 JAN 2017 | 009004 | NWR region | Sr 542 hedrick creek fish barrier tree clearing | 7 of 11 | $65,628 | +63% |
| 09 MAR 2016 | 008851 | NWR region | Sr 542 high creek - fish passage 15a028 revised 3-3-2016 | 8 of 8 | $1,463,319 | +35% |
| 02 DEC 2015 | 008820 | NWR region | Sr 548 unnamed creek to drayton harbor fish passage 15a004 | 5 of 6 | $545,177 | +47% |
| 27 MAR 2013 | 008436 | NWR region | Sr 11 padden creek fish barrier removal | 6 of 6 | $2,144,983 | +22% |
| 21 FEB 2013 | 008418 | NWR region | Sr 546 depot rd and bender rd intersection improvements | 7 of 8 | $3,020,790 | +41% |
| 11 APR 2012 | 008269 | NWR region | Sr 530 fortson creek culvert - fish barrier | 7 of 8 | $1,066,677 | +31% |
| 06 JAN 2011 | 008058 | NCR region | Ncr major drainage 2011 | 6 of 9 | $578,207 | +9.0% |
| 06 JAN 2010 | 007867 | OR region | Sr 520 - pontoon anderson and middleton site restoration | 12 of 13 | $357,749 | +25% |
| 25 MAR 2009 | 007699 | NWR region | Sr 525 low cost enhancement restriping | 4 of 5 | $155,877 | +15% |
| 11 FEB 2009 | 007659 | NWR region | Sr 542 warnick bluff site | 13 of 17 | $532,698 | +35% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.