Award Construction, Inc.: WSDOT bid record

Award Construction, Inc. submitted 16 bids on Washington State DOT contracts in the data, from 11 FEB 2009 to 12 JAN 2022, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +28% above the low bid.

Owner
Washington State DOT
Low bid volume
$2,499,805
Latest bid
12 JAN 2022
Data through
07 OCT 2026
16Bids
2Low bids
13Win rate, percent
+28%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
2009200%
2010100%
2011100%
2012100%
2013200%
2015100%
2016100%
2017200%
2018300%
202011100%
202211100%
Award Construction, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
NWR region13215%
OR region100%
NCR region100%
SCR region100%
Award Construction, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Roadway excavation including haulCY133 (23%)$28.00$20.00
Crushed surfacing base courseTON122 (17%)$32.25$26.44
Flexible guide postEACH92 (22%)$68.00$33.23
Plastic traffic arrowEACH82 (25%)$240.00$135.00
Construction signs class ASF52 (40%)$21.25$16.21
Plastic wide lane lineLF52 (40%)$5.00$3.23
Erosion and sediment control leadDAY101 (10%)$112.50$100.00
Embankment compactionCY101 (10%)$14.50$3.50
Planing bituminous pavementSY81 (13%)$12.75$4.75
Plastic drainage markingEACH81 (13%)$122.50$34.00
Clearing and grubbingACRE71 (14%)$48,500$8,000.00
Raised pavement marker type 2HUND61 (17%)$572.50$478.00
Award Construction, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Interwest Construction, Inc.98 of 9
Granite Construction Company84 of 8
Strider Construction Co., Inc.75 of 7
Colacurcio Brothers, Inc.75 of 7
Ram Construction General64 of 6
Tiger Construction, LTD.55 of 5
SRV Construction, Inc.30 of 3
Trimaxx Construction, Inc.33 of 3
Razz Construction, Inc.22 of 2
Jansen Inc.22 of 2
Award Construction, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
12 JAN 2022009758NWR regionSr 525 clinton ferry terminal vicinity pedestrian connectivity1 of 1$1,756,076Low
08 JAN 2020009503NWR regionSr 524 yew way railroad crossing improvements1 of 2$743,729Low, 61% under the second
28 FEB 2018009218NWR regionSr 548 kickerville rd intersection improvement2 of 5$573,013+1.0%
07 FEB 2018009196SCR regionI-182 queensgate dr - interchange improvements6 of 6$3,158,798+32%
10 JAN 2018009194NWR regionSr 9 136th st se vic to sr 96 vic channelization2 of 4$856,980+5.0%
13 DEC 2017009172NWR regionSr 542 sr 9 east junction intersection improvements3 of 8$1,037,828+5.0%
05 JAN 2017009004NWR regionSr 542 hedrick creek fish barrier tree clearing7 of 11$65,628+63%
09 MAR 2016008851NWR regionSr 542 high creek - fish passage 15a028 revised 3-3-20168 of 8$1,463,319+35%
02 DEC 2015008820NWR regionSr 548 unnamed creek to drayton harbor fish passage 15a0045 of 6$545,177+47%
27 MAR 2013008436NWR regionSr 11 padden creek fish barrier removal6 of 6$2,144,983+22%
21 FEB 2013008418NWR regionSr 546 depot rd and bender rd intersection improvements7 of 8$3,020,790+41%
11 APR 2012008269NWR regionSr 530 fortson creek culvert - fish barrier7 of 8$1,066,677+31%
06 JAN 2011008058NCR regionNcr major drainage 20116 of 9$578,207+9.0%
06 JAN 2010007867OR regionSr 520 - pontoon anderson and middleton site restoration12 of 13$357,749+25%
25 MAR 2009007699NWR regionSr 525 low cost enhancement restriping4 of 5$155,877+15%
11 FEB 2009007659NWR regionSr 542 warnick bluff site13 of 17$532,698+35%
Award Construction, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy