B.F. Sisk Dam Safety Modification
- Location
- San Luis Reservoir, CA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | U.S. Bureau of Reclamation | |
| Category | Dams and hydro | |
| Amount | US$1.1 billion (US dollars), as of May 2020 | U.S. Bureau of Reclamation |
| What the amount covers | Capital estimate: 'This modification, estimated to cost $1.1 billion, is the largest in the history of Reclamation's Dam Safety Program.' (Reclamation, May 2020) | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.1 bn | Capital estimate | Whole project | May 2020 | U.S. Bureau of Reclamation'This modification, estimated to cost $1.1 billion, is the largest in the history of Reclamation's Dam Safety Program.' (Reclamation, May 2020) |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| NW Construction | construction contractor | Phase 2 construction (central stability berm) | U.S. Bureau of Reclamation |
| NW Construction, Inc. | contractor | Phase I (modifications to the existing concrete spillway, shear key earthfill, toe drains, outlet works tunnel extension) | NW Construction, Inc. |
About the project
Reclamation's official estimate for the B.F. Sisk Dam Safety of Dams modification is $1.1 billion.
Scope notes
- Official estimate for the Dam Safety modification. A separately proposed storage expansion must have its own scope and cost record. U.S. Bureau of Reclamation
Sources
- B.F. Sisk Dam Safety Modification, U.S. Bureau of Reclamation. Official estimate for the Dam Safety modification. A separately proposed storage expansion must have its own scope and cost record.. Consulted 9 Nov 2026.
- Reclamation awards $255M contract to kick off Phase 2 construction for B.F. Sisk Safety of Dams Project, U.S. Bureau of Reclamation, 27 May 2025. 'The Bureau of Reclamation is awarding a major construction contract for Phase 2 of the B.F. Sisk Safety of Dams Modification Project. The $255 million award to NW Construction marks a significant milestone'. Consulted 18 Nov 2026.
- B.F. Sisk Dam SOD Modifications: Phase I, NW Construction, Inc.. 'Recent Projects, NW Construction, Inc.: "B.F. Sisk Dam SOD Modifications: Phase I", Owner: "Bureau of Reclamation", Location: "Los Banos, Merced County, California"'. Consulted 18 Nov 2026.