Ti-Zack Concrete, LLC: MoDOT bid record
Ti-Zack Concrete, LLC submitted 33 bids on Missouri DOT contracts in the data, from 19 FEB 2021 to 18 SEP 2026, and was the low bidder on 11 of them (33%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Missouri DOT
- Low bid volume
- $15,623,074
- Latest bid
- 18 SEP 2026
- Data through
- 16 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 1 | 25% |
| 2024 | 1 | 0 | 0% |
| 2025 | 8 | 3 | 38% |
| 2026 | 20 | 7 | 35% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Central | 8 | 2 | 25% |
| Kansas City | 7 | 1 | 14% |
| Southwest | 7 | 1 | 14% |
| Northwest | 4 | 4 | 100% |
| Northeast | 4 | 2 | 50% |
| Southeast | 2 | 0 | 0% |
| St. Louis | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Silt fence | 8061019 | LF | 32 | 19 (59%) | $2.20 | $3.45 |
| Type 1 aggregate for base (4 in. thick) | 3040143 | SY | 22 | 19 (86%) | $10.46 | $14.00 |
| Concrete curb ramp | 6081010 | SY | 38 | 14 (37%) | $161.26 | $172.00 |
| Type 5 aggregate for base (4 in. thick) | 3040504 | SY | 25 | 14 (56%) | $12.31 | $14.30 |
| Additional mobilization for seeding | 6181020 | EACH | 14 | 14 (100%) | $600.00 | $600.00 |
| Concrete curb (6 in. height and under) type S | 6091010 | LF | 22 | 13 (59%) | $49.94 | $60.75 |
| Curb inlet check | 8061007A | EACH | 34 | 12 (35%) | $110.00 | $145.38 |
| Truncated domes | 6081012 | SF | 39 | 11 (28%) | $36.75 | $35.00 |
| Sediment removal | 8061016 | CY | 29 | 10 (34%) | $27.50 | $25.69 |
| Misc.linear grading for ADA facilities | 2079903 | LF | 16 | 10 (63%) | $7.42 | $19.00 |
| Pavement marking removal | 6207001 | LF | 24 | 7 (29%) | $2.48 | $1.04 |
| Alternate ditch check | 8061006 | LF | 17 | 7 (41%) | $5.50 | $11.40 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Branco Enterprises, Inc. | 6 | 5 of 6 |
| Hunter Chase & Associates, Inc. | 5 | 4 of 5 |
| Sprouls Construction, Inc. | 5 | 2 of 5 |
| RL Persons Construction, Inc. | 5 | 2 of 5 |
| J D Bishop Construction, LLC | 4 | 1 of 4 |
| Don Schnieders Excavating Company, Inc. | 4 | 0 of 4 |
| Watson Concrete, Inc. | 4 | 2 of 4 |
| N.B. West Contracting Company | 3 | 1 of 3 |
| Leavenworth Excavating & Equipment Company, Inc. | 3 | 2 of 3 |
| Realm Construction Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 260918-D07 | Central | JCD0214 - ROUTE 50 - MONITEAU COUNTY | 1 of 5 | $847,850 | Low, 24% under the second |
| 18 SEP 2026 | 260918-G01 | Southwest | J8S0745, J8S3133, J8S3153 - ROUTE D - GREENE COUNTY | 5 of 6 | $7,295,089 | +11% |
| 18 JUN 2026 | 260618-D01 | Central | JCD0124 - ROUTE BU 70 - BOONE COUNTY | 2 of 4 | $359,854 | +15% |
| 15 MAY 2026 | 260515-C07 | Kansas City | JKU0097 - ROUTE 69 - CLAY COUNTY | 2 of 5 | $677,113 | +9.0% |
| 15 MAY 2026 | 260515-G01 | Southwest | J7P3518, J7S3399 - VARIOUS ROUTES - HENRY, ST. CLAIR, VERNON COUNTIES | 1 of 3 | $1,471,013 | Low, 2.0% under the second |
| 17 APR 2026 | 260417-C02 | Kansas City | J4P3268I - VARIOUS ROUTES - JACKSON COUNTY | 2 of 5 | $1,446,960 | +6.0% |
| 17 APR 2026 | 260417-D03 | Central | JCD0125 - ROUTE 763, 163, PP - BOONE COUNTY | 1 of 2 | $1,362,810 | Low, 42% under the second |
| 17 APR 2026 | 260417-G03 | Southwest | JSR0338, JSR0340 - VARIOUS ROUTES - HENRY, VERNON COUNTIES | 2 of 2 | $890,534 | +12% |
| 20 MAR 2026 | 260320-A01 | Northwest | JNW0143 - US 65 - LIVINGSTON COUNTY | 1 of 1 | $316,397 | Low |
| 20 MAR 2026 | 260320-F01 | St. Louis | J6P3510D - ROUTE 100 - ST. LOUIS COUNTY | 1 of 5 | $5,596,819 | Low, 0.0% under the second |
| 20 MAR 2026 | 260320-G01 | Southwest | J7P3397, JSR0165 - ROUTE 32, 39, 123 - CEDAR, GREENE COUNTIES | 3 of 5 | $883,932 | +14% |
| 20 MAR 2026 | 260320-G03 | Southwest | JSR0057, JSR0337 - ROUTE BU 13, BU 65, Various - STONE, TANEY, JASPER, LAWRENCE, NEWTON | 4 of 4 | $1,230,423 | +20% |
| 20 MAR 2026 | 260320-H04 | Southeast | JSE0332 - ROUTE I-57 - MISSISSIPPI COUNTY | 5 of 6 | $2,831,662 | +46% |
| 20 FEB 2026 | 260220-B02 | Northeast | JNE0028 - ROUTES 15, H - SHELBY COUNTY | 1 of 2 | $447,133 | Low, 26% under the second |
| 20 FEB 2026 | 260220-B03 | Northeast | JNE0198 - ROUTE 149, O, BU 63 - ADAIR COUNTY | 2 of 2 | $857,282 | +14% |
| 20 FEB 2026 | 260220-C01 | Kansas City | J4P3268F - ROUTE 78 - JACKSON COUNTY | 3 of 4 | $3,948,661 | +17% |
| 20 FEB 2026 | 260220-C02 | Kansas City | J4P3268G - ROUTES 12, 24 - JACKSON COUNTY | 1 of 1 | $1,060,183 | Low |
| 20 FEB 2026 | 260220-C03 | Kansas City | J4P3268H - VARIOUS ROUTES - JACKSON COUNTY | 3 of 3 | $3,093,741 | +8.0% |
| 20 FEB 2026 | 260220-D01 | Central | JCD0123 - ROUTE AC - BOONE COUNTY | 2 of 3 | $1,741,997 | +22% |
| 16 JAN 2026 | 260116-D06 | Central | JCD0129 - ROUTE 19, 32, 72 - DENT COUNTY | 2 of 4 | $1,595,652 | +7.0% |
| 14 NOV 2025 | 251114-A01 | Northwest | J1S3438 - US 65, US 136 - MERCER COUNTY | 1 of 2 | $1,095,352 | Low, 8.0% under the second |
| 14 NOV 2025 | 251114-D02 | Central | JCD0127 - ROUTE SP 44 - PULASKI COUNTY | 3 of 4 | $2,394,045 | +27% |
| 15 AUG 2025 | 250815-B05 | Northeast | JNE0146 - ROUTE V - LEWIS COUNTY | 1 of 3 | $749,179 | Low, 0.0% under the second |
| 20 JUN 2025 | 250620-B01 | Northeast | JNE0147 - ROUTE 156, J, 149, C - MACON COUNTY | 3 of 4 | $1,093,322 | +11% |
| 16 MAY 2025 | 250516-A03 | Northwest | JNW0030 - VARIOUS ROUTES - CARROLL, CHARITON COUNTIES | 1 of 3 | $2,327,674 | Low |
How this record was read
MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
- Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.