Sprouls Construction, Inc.: MoDOT bid record

Sprouls Construction, Inc. submitted 16 bids on Missouri DOT contracts in the data, from 21 FEB 2020 to 15 MAY 2026, and was the low bidder on 1 of them (6%). When it was not low, its total sat a median +16% above the low bid.

Owner
Missouri DOT
Low bid volume
$917,417
Latest bid
15 MAY 2026
Data through
16 OCT 2026
16Bids
1Low bids
6Win rate, percent
+16%Median gap to the low bid when not low, 15 bids

By year

YearBidsLow bidsWin rate
2020100%
2021200%
20222150%
2023300%
2024100%
2025200%
2026500%
Sprouls Construction, Inc., MoDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction signs6161005SF2013 (65%)$7.00$7.00
Silt fence8061019LF1810 (56%)$4.50$3.45
Advanced warning rail system6161008EACH139 (69%)$100.00$51.40
Flashing arrow panel6161040EACH119 (82%)$500.00$1,000.00
Turf type tall fescue sodding8031000ASY119 (82%)$10.00$13.00
Curb inlet check8061007AEACH138 (62%)$100.00$145.38
Channelizer (trim line)6161025EACH98 (89%)$17.00$18.00
Class 3 excavation2063000CY117 (64%)$40.00$30.00
Preformed thermoplastic pavement marking, 24 in. white6200015LF106 (60%)$30.00$23.50
Rock ditch check8061005LF106 (60%)$27.50$20.00
Pavement marking removal6207001LF105 (50%)$3.50$1.04
Sediment removal8061016CY204 (20%)$50.00$25.69
Sprouls Construction, Inc., MoDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Sprouls Construction, Inc., MoDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
15 MAY 2026260515-G01SouthwestJ7P3518, J7S3399 - VARIOUS ROUTES - HENRY, ST. CLAIR, VERNON COUNTIES2 of 3$1,499,832+2.0%
15 MAY 2026260515-G05SouthwestJSR0075 - ROUTE H, NN - NEWTON COUNTY3 of 5$406,608+12%
20 MAR 2026260320-G01SouthwestJ7P3397, JSR0165 - ROUTE 32, 39, 123 - CEDAR, GREENE COUNTIES4 of 5$899,372+16%
20 MAR 2026260320-G03SouthwestJSR0057, JSR0337 - ROUTE BU 13, BU 65, Various - STONE, TANEY, JASPER, LAWRENCE, NEWTON2 of 4$1,138,464+11%
20 FEB 2026260220-G02SouthwestJSR0194-VARIOUS ROUTES-VARIOUS COUNTIES3 of 3$2+6.0%
16 MAY 2025250516-G02SouthwestJ7S3531, J7S3506, J7S3531B - VARIOUS ROUTES - BARTON, DADE, JASPER, NEWTON COUNTIES3 of 4$2,937,494+26%
16 MAY 2025250516-G05SouthwestJSR0170-ROUTE I-49-VERNON COUNTY2 of 2$1,276,087+25%
17 MAY 2024240517-G08SouthwestJSR0048, JSR0092 - ROUTE 43, 49, TT - JASPER, NEWTON COUNTIES2 of 2$1,314,922+15%
17 NOV 2023231117-G02SouthwestJ7S3519 - ROUTE 59,90, W, 43 - MCDONALD COUNTY2 of 3$768,813+68%
20 OCT 2023231020-G05SouthwestJ7S3550 - ROUTE W - BARTON COUNTY2 of 6$675,7360.0%
17 MAR 2023230317-G01SouthwestJ7P3527, J8S3200 - VARIOUS ROUTES - LAWRENCE, GREENE COUNTIES2 of 2$3,348,597+15%
20 MAY 2022220520-G04SouthwestJ7S3367E-ROUTES W,BB-VERNON COUNTY1 of 2$917,417Low, 8.0% under the second
21 JAN 2022220121-G04SouthwestJ7P3101I - ROUTE K - BARTON COUNTY2 of 2$681,234+21%
21 MAY 2021210521-G01SouthwestJ7P3370B-VARIOUS ROUTES- BATES COUNTIES2 of 3$350,237+27%
19 FEB 2021210219-G04SouthwestJ7P3283,J7S3250 - ROUTE 171,O - JASPER COUNTY4 of 7$634,657+39%
21 FEB 2020200221-G07SouthwestJ7P3190B - ROUTE CC - NEWTON COUNTY4 of 5$565,511+59%
Sprouls Construction, Inc.: latest MoDOT bids in the data

How this record was read

MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

  • Every bid counted here matched its published total to within one dollar; MoDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy