ODOT contract 250569 bid tabulation
RIC-VAR OVERLAY FY2026 (TWO LANE RESURFACING). Let by Ohio DOT on December 4, 2025, RIC. 2 bids received; low bid $5,268,719 by Kokosing Construction Company Inc, -1.0% against the engineer's estimate of $5,321,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 132
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Kokosing Construction Company Inc | $5,268,719 | Low | -1.0% |
| 2 | Shelly & Sands Inc | $5,333,428 | +1.0% | 0.0% |
Engineer's estimate: $5,321,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kokosing Construction Company Inc | 2. Shelly & Sands Inc |
|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 152 | $45.00 | $32.00 |
| 2 | Walk removed (202E30000) | SF | 10,127 | $3.50 | $3.25 |
| 3 | Curb removed (202E32000) | FT | 783 | $12.00 | $9.00 |
| 4 | Curb and gutter removed (202E32500) | FT | 94 | $12.00 | $10.30 |
| 5 | Guardrail removed (202E38000) | FT | 7,293.75 | $2.00 | $2.00 |
| 6 | Anchor assembly removed, type A (202E42000) | EACH | 3 | $295.00 | $295.00 |
| 7 | Anchor assembly removed, type E (202E42010) | EACH | 19 | $145.00 | $145.00 |
| 8 | Anchor assembly removed, type T (202E42040) | EACH | 11 | $85.00 | $85.00 |
| 9 | Anchor assembly removed, type B (202E42050) | EACH | 2 | $130.00 | $130.00 |
| 10 | Anchor assembly removed for reuse, type E (202E42810) | EACH | 2 | $195.00 | $195.00 |
| 11 | Anchor assembly removed for reuse, type T (202E42820) | EACH | 1 | $110.00 | $110.00 |
| 12 | Bridge terminal assembly removed (202E47000) | EACH | 12 | $75.00 | $75.00 |
| 13 | Removal misc.: landscape rocks (202E98300) | SY | 2 | $135.00 | $150.00 |
| 14 | Embankment, as per plan (203E20001) | CY | 528 | $58.00 | $58.00 |
| 15 | Reshaping under guardrail, as per plan (209E15001) | STA | 89.13 | $50.00 | $50.00 |
| 16 | Linear grading (209E60500) | MI | 15.10 | $2,000.00 | $4,500.00 |
| 17 | Grading mailbox approaches (209E80000) | EACH | 40 | $20.00 | $100.00 |
| 18 | Guardrail, type 5 (606E13000) | FT | 425 | $18.40 | $18.40 |
| 19 | Guardrail, type MGS (606E15050) | FT | 350 | $19.60 | $19.60 |
| 20 | Guardrail, type MGS with long posts (606E15100) | FT | 7,118.75 | $22.00 | $22.00 |
| 21 | Raising type 5 guardrail (606E17000) | FT | 181.25 | $8.00 | $8.00 |
| 22 | Anchor assembly, type A (606E25000) | EACH | 1 | $1,650.00 | $1,650.00 |
| 23 | Anchor assembly, MGS type B (606E26050) | EACH | 2 | $2,550.00 | $2,550.00 |
| 24 | Anchor assembly, type E (606E26100) | EACH | 6 | $2,420.00 | $2,420.00 |
| 25 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 17 | $2,480.00 | $2,480.00 |
| 26 | Anchor assembly, type T (606E26500) | EACH | 2 | $1,120.00 | $1,120.00 |
| 27 | Anchor assembly, MGS type T (606E26550) | EACH | 10 | $1,350.00 | $1,350.00 |
| 28 | Anchor assembly rebuilt, type E (606E27850) | EACH | 2 | $1,520.00 | $1,520.00 |
| 29 | Anchor assembly rebuilt, type T (606E27900) | EACH | 1 | $850.00 | $850.00 |
| 30 | Bridge terminal assembly, type 4 (606E35140) | EACH | 11 | $985.00 | $985.00 |
| 31 | Bridge terminal assembly, type 4, as per plan (606E35141) | EACH | 1 | $1,350.00 | $1,350.00 |
| 32 | 4" concrete walk (608E10000) | SF | 4,279 | $10.50 | $15.50 |
| 33 | 8" concrete walk (608E15000) | SF | 400 | $16.00 | $16.00 |
| 34 | Curb ramp (608E52000) | SF | 5,591 | $10.50 | $15.50 |
| 35 | Curb ramp, as per plan (608E52001) | SF | 725 | $16.00 | $24.00 |
| 36 | Combination curb and gutter, type 2 (609E12000) | FT | 50 | $50.00 | $46.50 |
| 37 | Curb, type 6 (609E26000) | FT | 532 | $50.00 | $31.00 |
| 38 | Curb, type 6, as per plan (609E26001) | FT | 7 | $50.00 | $41.00 |
| 39 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 8 | $550.00 | $800.00 |
| 40 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 2 | $875.00 | $1,225.00 |
| 41 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,600.00 | $7,000.00 |
| 42 | Special - mailbox support system, single (690E50100) | EACH | 2 | $225.00 | $225.00 |
| 43 | Special - mailbox support system, double (690E50200) | EACH | 2 | $320.00 | $320.00 |
| 44 | Topsoil, as per plan (659E00301) | CY | 26 | $75.00 | $85.00 |
| 45 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 |
| 46 | Catch basin adjusted to grade (611E98630) | EACH | 77 | $900.00 | $800.00 |
| 47 | Manhole adjusted to grade (611E99654) | EACH | 31 | $600.00 | $800.00 |
| 48 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01043) | CY | 1,433 | $275.00 | $270.00 |
| 49 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01043) | CY | 254 | $320.00 | $600.00 |
| 50 | Pavement repair, as per plan (253E02001) | CY | 199 | $290.00 | $350.00 |
| 51 | Pavement repair, as per plan (253E02001) | CY | 41 | $340.00 | $800.00 |
| 52 | Pavement planing, asphalt concrete (1.5") (254E01000) | SY | 118,454 | $0.80 | $1.20 |
| 53 | Pavement planing, asphalt concrete (3.0") (254E01000) | SY | 37,609 | $2.50 | $3.25 |
| 54 | Patching planed surface (254E01600) | SY | 797 | $3.00 | $4.00 |
| 55 | Aggregate base (304E20000) | CY | 1 | $75.00 | $200.00 |
| 56 | Tack coat (407E10000) | GAL | 21,837 | $2.90 | $2.25 |
| 57 | Prime coat, as per plan (408E10001) | GAL | 12,613 | $5.20 | $4.50 |
| 58 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 2,584 | $235.00 | $220.00 |
| 59 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201) | CY | 1,315 | $260.00 | $228.00 |
| 60 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201) | CY | 4,951 | $220.00 | $190.00 |
| 61 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 1,838 | $238.00 | $208.00 |
| 62 | Compacted aggregate (617E10100) | CY | 1,905 | $30.00 | $58.00 |
| 63 | Shoulder preparation (617E20000) | SY | 31,482 | $0.25 | $0.20 |
| 64 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 3.04 | $1,525.00 | $1,525.00 |
| 65 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 1.52 | $1,525.00 | $1,525.00 |
| 66 | Longitudinal joint preparation (874E21000) | MI | 1.52 | $3,000.00 | $13,000 |
| 67 | Pavement planing, asphalt concrete, class A (1.0") (897E01010) | SY | 92,554 | $0.70 | $1.00 |
| 68 | Patching planed surface (897E02000) | SY | 474 | $3.00 | $4.00 |
| 69 | Valve box adjusted to grade (638E10800) | EACH | 28 | $450.00 | $700.00 |
| 70 | RPM (621E00100) | EACH | 909 | $34.50 | $34.50 |
| 71 | Raised pavement marker removed (621E54000) | EACH | 866 | $1.00 | $5.00 |
| 72 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 131 | $14.50 | $14.50 |
| 73 | Sign support assembly, pole mounted (630E79500) | EACH | 10 | $140.00 | $140.00 |
| 74 | Sign, flat sheet (630E80100) | SF | 10 | $70.00 | $70.00 |
| 75 | Removal of ground mounted sign and disposal (630E84900) | EACH | 7 | $25.00 | $25.00 |
| 76 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $70.00 | $70.00 |
| 77 | Removal of ground mounted post support and reerection (630E86010) | EACH | 6 | $140.00 | $140.00 |
| 78 | Signing, misc.: solar-powered rectangular rapid FL (630E97700) | EACH | 2 | $9,000.00 | $9,000.00 |
| 79 | Edge line, 6", type 1 (642E00104) | MI | 26.94 | $730.00 | $730.00 |
| 80 | Center line, type 1 (642E00300) | MI | 14.52 | $650.00 | $650.00 |
| 81 | Channelizing line, 12" (644E00404) | FT | 104 | $4.00 | $4.00 |
| 82 | Stop line (644E00500) | FT | 1,566 | $7.45 | $7.45 |
| 83 | Crosswalk line, 12" (644E00620) | FT | 1,798 | $4.00 | $4.00 |
| 84 | Transverse/diagonal line (644E00700) | FT | 566 | $7.00 | $7.00 |
| 85 | School symbol marking, 96" (644E01110) | EACH | 4 | $420.00 | $420.00 |
| 86 | Parking lot stall marking (644E01200) | FT | 5,490 | $1.25 | $1.25 |
| 87 | Lane arrow (644E01300) | EACH | 6 | $100.00 | $100.00 |
| 88 | Handicap symbol marking (644E01600) | EACH | 1 | $55.00 | $55.00 |
| 89 | Bike crossing symbol (644E01620) | EACH | 6 | $270.00 | $270.00 |
| 90 | Pavement marking, misc.: crosswalk line, 18", as P (644E50300) | FT | 1,291 | $5.55 | $5.55 |
| 91 | Edge line, 6" (646E10010) | MI | 0.40 | $12,000 | $12,000 |
| 92 | Center line (646E10200) | MI | 0.20 | $12,000 | $12,000 |
| 93 | Pull box, misc.: adjusted to grade (625E31600) | EACH | 4 | $450.00 | $400.00 |
| 94 | Pull box, misc.: slip resistant lid (625E31600) | EACH | 2 | $1,250.00 | $525.00 |
| 95 | Ground rod (625E32000) | EACH | 11 | $265.00 | $300.00 |
| 96 | Accessible pedestrian pushbutton (632E20750) | EACH | 3 | $950.00 | $1,000.00 |
| 97 | Detector loop, as per plan (632E26501) | EACH | 1 | $2,650.00 | $3,500.00 |
| 98 | Signal support foundation (632E64010) | EACH | 4 | $1,500.00 | $2,000.00 |
| 99 | Pedestal foundation, as per plan (632E64021) | EACH | 7 | $2,450.00 | $2,000.00 |
| 100 | Pedestal, 8', transformer base (632E89900) | EACH | 3 | $750.00 | $1,000.00 |
| 101 | Pedestal, misc.: reuse of pedestrian pedestal (632E90010) | EACH | 4 | $425.00 | $700.00 |
| 102 | Reuse of pedestrian signal head, as per plan (632E90203) | EACH | 10 | $550.00 | $700.00 |
| 103 | Reuse of signal support, as per plan (632E90207) | EACH | 2 | $2,750.00 | $900.00 |
| 104 | Reuse of pedestrian pushbutton, as per plan (632E90211) | EACH | 7 | $275.00 | $475.00 |
| 105 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $105.00 | $95.00 |
| 106 | Work zone marking sign (614E12460) | EACH | 302 | $70.00 | $70.00 |
| 107 | Asphalt concrete for maintaining traffic (614E13000) | CY | 80 | $125.00 | $250.00 |
| 108 | Portable changeable message sign, as per plan (614E18601) | SNMT | 16 | $900.00 | $900.00 |
| 109 | Work zone center line, class III, 642 paint (614E21550) | MI | 31.35 | $700.00 | $700.00 |
| 110 | Work zone channelizing line, class III, 12", 642 paint (614E23690) | FT | 268 | $0.85 | $0.85 |
| 111 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 1,510 | $3.00 | $3.00 |
| 112 | Work zone stop line, class III, 642 paint (614E26610) | FT | 3,774 | $4.00 | $4.00 |
| 113 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 7,842 | $3.50 | $3.50 |
| 114 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 16 | $50.00 | $50.00 |
| 115 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 116 | $26.21 | $26.21 |
| 116 | Joint sealer (516E31000) | FT | 6 | $26.21 | $26.21 |
| 117 | Special - patching concrete bridge deck (519E12510) | SY | 2 | $793.20 | $793.20 |
| 118 | Special - sawing and sealing concrete joints (516E31250) | FT | 34 | $26.21 | $26.21 |
| 119 | Special - patching concrete bridge deck (519E12510) | SY | 13 | $793.20 | $793.20 |
| 120 | Removal misc.: joint seal (202E98200) | FT | 41 | $6.45 | $6.45 |
| 121 | Joint sealer (516E31000) | FT | 41 | $26.21 | $26.21 |
| 122 | Special - patching concrete bridge deck (519E12510) | SY | 3 | $793.20 | $793.20 |
| 123 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 204 | $26.21 | $26.21 |
| 124 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 8 | $48.69 | $48.69 |
| 125 | Patching concrete structure, as per plan (519E11101) | SF | 72 | $153.63 | $153.63 |
| 126 | Special - patching concrete bridge deck (519E12510) | SY | 29 | $793.20 | $793.20 |
| 127 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 102 | $26.21 | $26.21 |
| 128 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $21,000 | $25,000 |
| 129 | Maintaining traffic (614E11000) | LS | 1 | $425,055 | $460,000 |
| 130 | Field office, type B (619E16010) | MNTH | 9 | $1,700.00 | $3,200.00 |
| 131 | Construction layout stakes and surveying (623E10000) | LS | 1 | $4,000.00 | $16,100 |
| 132 | Mobilization (624E10000) | LS | 1 | $263,000 | $200,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.