ODOT contract 250572 bid tabulation

WAR-SR 73-07.20 (TWO LANE RESURFACING). Let by Ohio DOT on December 4, 2025, WAR. 3 bids received; low bid $4,722,570 by John R Jurgensen Company, +2.9% against the engineer's estimate of $4,589,000.

Owner
Ohio DOT
Letting
04 DEC 2025
Pay items
98
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1John R Jurgensen Company$4,722,570Low+3.0%
2Fillmore Construction$4,785,475+1.0%+4.0%
3Barrett Paving Materials Inc$5,028,794+6.0%+10%
ODOT contract 250572: bids by rank

Engineer's estimate: $4,589,000.

Bid tabulation

LinePay itemUnitQuantity1. John R Jurgensen Company2. Fillmore Construction3. Barrett Paving Materials Inc
1Clearing and grubbing (201E11000)LS1$19,342$25,000$8,000.00
2Pavement removed (202E23000)SY422$15.66$20.00$50.00
3Pipe removed, 24" and under (202E35100)FT81$25.69$20.00$12.00
4Guardrail removed (202E38000)FT11,721$2.50$2.50$2.50
5Anchor assembly removed, type A, as per plan (202E42001)EACH32$275.00$275.00$275.00
6Anchor assembly removed, type E (202E42010)EACH19$50.00$50.00$50.00
7Anchor assembly removed, type T (202E42040)EACH9$40.00$40.00$40.00
8Anchor assembly removed, type B (202E42050)EACH1$50.00$50.00$50.00
9Bridge terminal assembly removed (202E47000)EACH7$75.00$75.00$75.00
10Excavation (203E10000)CY566$19.50$30.00$40.00
11Embankment (203E20000)CY1,020$22.82$50.00$35.00
12Subgrade compaction (204E10000)SY1,951$2.25$5.00$5.00
13Excavation of subgrade (204E13000)CY888$34.88$30.00$40.00
14Granular material, type C (204E30020)CY888$70.40$100.00$85.00
15Geotextile fabric (204E50000)SY1,951$3.10$3.00$2.50
16Reshaping under guardrail (209E15000)STA142$35.00$35.00$35.00
17Guardrail, type MGS with long posts (606E15100)FT11,000$24.50$24.50$24.50
18Anchor assembly, MGS type E, MASH 2016 (606E26150)EACH46$2,450.00$2,450.00$2,450.00
19Anchor assembly, MGS type E, softstop (606E26150)EACH5$2,850.00$2,850.00$2,850.00
20Anchor assembly, MGS type T (606E26550)EACH14$1,100.00$1,100.00$1,100.00
21MGS bridge terminal assembly, type 1 (606E35002)EACH7$2,400.00$2,400.00$2,400.00
22Special - mailbox removed and reset (690E50350)EACH2$325.00$325.00$325.00
23Topsoil (659E00300)CY313$44.10$50.00$62.00
24Seeding and mulching (659E10000)SY2,818$1.48$1.45$1.48
25Commercial fertilizer (659E20000)TON0.38$925.00$1,400.00$925.00
26Lime (659E31000)ACRE0.58$100.00$450.00$100.00
27Water (659E35000)MGAL16$1.00$100.00$1.00
28Sodding reinforced (660E20000)SY77$17.45$15.00$17.45
29Slope erosion protection (670E00500)SY29$8.00$2.00$8.00
30Storm water pollution prevention plan (832E15000)LS1$2,300.00$3,500.00$2,500.00
31Storm water pollution prevention inspections (832E15002)LS1$6,790.00$5,000.00$7,500.00
32Storm water pollution prevention inspection software (832E15010)LS1$12,116$10,000$12,120
33Erosion control (832E30000)EACH24,405$1.00$1.00$1.00
346" base pipe underdrains (605E14000)FT2,816$14.55$12.00$18.00
3512" conduit, type D (611E04900)FT49$95.75$100.00$65.00
3612" conduit, type D (611E04900)FT46$124.64$200.00$90.00
37Pavement repair (253E02000)CY500$476.90$300.00$460.00
38Pavement planing, asphalt concrete, 1.25" (254E01000)SY229,104$1.35$2.00$2.30
39Patching planed surface (254E01600)SY2,298$4.26$5.00$5.00
40Asphalt concrete base, PG64-22, (449) (302E56000)CY458$217.56$200.00$225.00
41Aggregate base (304E20000)CY510$76.25$100.00$90.00
42Tack coat (407E10000)GAL9$5.00$5.00$4.00
43Non-tracking tack coat (407E20000)GAL21,029$5.00$5.00$4.00
44Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100)CY8,023$245.96$220.00$252.00
45Asphalt concrete intermediate course, type 2, (448) (441E50300)CY95$331.89$300.00$295.00
46Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY4$1,884.04$500.00$1,200.00
47Asphalt concrete intermediate course, type 1, (449), (driveways) (441E70600)CY5$1,552.44$500.00$1,200.00
48Compacted aggregate (617E10100)CY952$137.47$100.00$100.00
49Shoulder preparation (617E20000)SY17,717$1.61$2.00$0.50
50Water (617E25000)MGAL19$7.51$100.00$10.00
51Rumble strips, shoulder (asphalt concrete) (618E40600)MI9.25$750.00$1,000.00$1,275.00
52RPM (621E00100)EACH1,213$36.70$40.00$36.70
53Raised pavement marker removed (621E54000)EACH1,191$12.00$10.00$10.00
54Barrier reflector, type 2, (bidirectional) (626E00110)EACH152$12.00$12.00$12.00
55Ground mounted support, no. 3 post (630E03100)FT39$16.00$16.00$16.00
56Sign, flat sheet (630E80100)SF24.75$26.00$26.00$26.00
57Removal of ground mounted sign and disposal (630E84900)EACH3$15.00$15.00$15.00
58Removal of ground mounted post support and disposal (630E86002)EACH3$30.00$30.00$30.00
59Edge line, 6" (644E00104)MI20.20$3,810.00$4,089.00$3,810.00
60Center line (644E00300)MI11.43$3,875.00$4,508.00$3,875.00
61Channelizing line, 12" (644E00404)FT4,384$1.50$1.84$1.50
62Stop line (644E00500)FT300$7.50$7.16$7.50
63Transverse/diagonal line (644E00700)FT2,583$7.50$7.15$7.50
64Island marking (644E00900)SF350$6.00$3.35$6.00
65Lane arrow (644E01300)EACH64$115.00$112.50$115.00
66Wet reflective traffic paint, edge line, 6" (807E10010)MI9.61$2,580.00$3,835.00$2,580.00
67Wet reflective traffic paint, lane line, 6" (807E10110)MI4.42$1,100.00$1,917.00$1,100.00
68Wet reflective traffic paint, channelizing line, 1 (807E10310)FT850$1.30$1.50$1.30
69Grooving for 6" recessed pavement marking, (asphalt) (850E10010)MI14.03$1,300.00$2,218.00$1,300.00
70Grooving for 12" recessed pavement marking, (asphalt) (850E10130)FT850$0.30$1.85$0.30
71Increased barrier delineation (614E11630)FT172$2.32$3.00$2.32
72Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH6$1,973.66$2,000.00$1,973.66
73Barrier reflector, type 1 (bidirectional) (614E13310)EACH41$13.03$14.00$13.03
74Object marker, two way (614E13360)EACH45$25.79$26.00$25.97
75Work zone lane line, class III, 6", 642 paint (614E20560)MI4.42$500.00$665.00$500.00
76Work zone center line, class III, 642 paint (614E21550)MI11.58$990.00$2,188.00$990.00
77Work zone edge line, class III, 6", 642 paint (614E22360)MI30.21$700.00$1,124.00$700.00
78Work zone channelizing line, class III, 12", 642 paint (614E23690)FT4,980$0.85$0.76$0.85
79Work zone stop line, class III, 642 paint (614E26610)FT300$2.80$5.15$2.80
80Pavement for maintaining traffic, class B (615E25000)SY1,708$58.74$100.00$80.00
81Water (616E10000)MGAL4$164.25$100.00$100.00
82Portable barrier, unanchored (622E41100)FT1,823$30.98$31.00$30.98
83Portions of structure removed (202E11300)CY0.03$81,765$10,000$80,000
84Epoxy coated steel reinforcement (509E10000)LB76$37.04$3.00$15.00
85Class QC1 concrete, headwall (511E46610)CY0.41$18,833$8,000.00$20,000
86Sealing of concrete surfaces (512E10000)SY1$800.00$1,000.00$300.00
87Premium for contract performance bond and for payment bond (103E05000)LS1$15,352$35,000$23,414
88Maintaining traffic (614E11000)LS1$128,275$250,000$275,000
89Construction layout stakes and surveying, as per plan (623E10001)LS1$11,853$25,000$20,000
90Monument assembly removed and reset (623E40000)EACH5$749.13$3,000.00$1,250.00
91Mobilization (624E10000)LS1$225,000$153,000$100,000
100Tied concrete block mat with type 1 underlayment (601E21050)SY6$280.89$100.00$125.00
1016" conduit, type F for underdrain outlets (611E00510)FT41$54.06$50.00$32.00
102Precast reinforced concrete outlet (611E99710)EACH3$655.66$500.00$250.00
103Law enforcement officer with patrol car for assistance (614E11110)HR200$131.42$100.00$85.00
104Work zone raised pavement marker (614E12800)EACH26$19.42$7.51$7.51
105Roads for maintaining traffic (615E10000)LS1$50,118$5,000.00$35,000
106Rumble stripes, edge line (asphalt concrete) (618E41000)MI19.84$750.00$1,000.00$1,275.00
ODOT contract 250572: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy