ODOT contract 260043 bid tabulation

BUT-SR 73-16.05 (TWO LANE RESURFACING). Let by Ohio DOT on January 29, 2026, BUT. 3 bids received; low bid $878,414 by Fillmore Construction, -13% against the engineer's estimate of $1,006,000.

Owner
Ohio DOT
Letting
29 JAN 2026
Pay items
73
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Fillmore Construction$878,414Low-13%
2Barrett Paving Materials Inc$917,530+4.0%-9.0%
3John R Jurgensen Company$976,410+11%-3.0%
ODOT contract 260043: bids by rank

Engineer's estimate: $1,006,000.

Bid tabulation

LinePay itemUnitQuantity1. Fillmore Construction2. Barrett Paving Materials Inc3. John R Jurgensen Company
1Clearing and grubbing (201E11000)LS1$2,500.00$2,800.00$513.57
2Walk removed, as per plan (202E30001)SF3,043$12.00$6.50$6.00
3Curb removed, as per plan (202E32001)FT80$17.00$22.25$18.75
4Curb and gutter removed, as per plan (202E32501)FT262$20.00$27.00$20.00
5Excavation (203E10000)CY10$100.00$55.00$200.00
6Embankment (203E20000)CY50$100.00$75.00$75.00
74" concrete walk (608E10000)SF1,622$20.00$13.75$14.00
8Curb ramp, as per plan (608E52001)SF2,786$24.00$27.25$15.00
9Detectable warning (608E53020)SF20$50.00$100.00$50.00
10Combination curb and gutter, type 2 (609E12000)FT97$100.00$75.75$55.00
11Curb, type 6 (609E26000)FT84$80.00$56.50$47.00
12Topsoil (659E00300)CY20$60.00$165.00$75.00
13Seeding and mulching, class 1 (659E00500)SY180$10.00$5.00$20.00
14Erosion control (832E30000)EACH10,000$1.00$1.00$1.00
156" base pipe underdrains (605E14000)FT100$50.00$41.00$15.00
16Catch basin adjusted to grade (611E98630)EACH10$2,000.00$1,285.00$1,498.66
17Manhole adjusted to grade (611E99654)EACH9$1,000.00$900.00$1,353.62
18Valve box adjusted to grade (638E10800)EACH9$500.00$775.00$934.67
19Pavement repair (253E02000)CY236$260.00$430.00$468.54
20Pavement planing, asphalt concrete, as per plan, 3 (254E01001)SY19,183$3.00$3.75$3.91
21Patching planed surface (254E01600)SY1,922$5.00$8.50$7.07
22Non-tracking tack coat (407E20000)GAL3,073$3.00$4.50$5.00
23Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY671$228.00$254.00$297.20
24Asphalt concrete intermediate course, type 2, (449) (441E70300)CY936$218.00$237.00$247.65
25Ground mounted support, no. 3 post (630E03100)FT77$15.00$15.00$18.00
26Sign, flat sheet (630E80100)SF26$15.00$15.50$25.00
27Removal of ground mounted sign and disposal (630E84900)EACH3$15.00$15.00$15.00
28Removal of ground mounted sign and reerection (630E85100)EACH3$45.00$45.00$75.00
29Removal of ground mounted post support and disposal (630E86002)EACH4$20.00$20.00$35.00
30Signing, misc.: relocation of solar powered rectan (630E97700)EACH2$2,495.00$1,310.00$1,310.00
31Detector loop (632E26500)EACH2$1,795.00$1,445.00$1,445.00
32Loop detector tie in (632E27200)EACH2$120.00$185.00$185.00
33Pedestal foundation (632E64020)EACH2$2,390.00$1,660.00$1,660.00
34Edge line, 4" (644E00100)MI1.05$2,559.00$2,559.00$3,575.00
35Lane line, 4" (644E00200)MI0.04$5,000.00$5,000.00$1,510.00
36Center line (644E00300)MI1.13$5,100.00$5,100.00$5,500.00
37Channelizing line, 8" (644E00400)FT274$3.00$3.00$2.05
38Stop line (644E00500)FT168$7.00$7.00$6.90
39Crosswalk line, 12" (644E00620)FT720$3.50$3.50$3.45
40Crosswalk line, 24" (644E00630)FT60$7.00$7.00$5.50
41Transverse/diagonal line (644E00700)FT174$7.00$7.00$6.90
42Island marking (644E00900)SF125$3.50$3.50$4.10
43Railroad symbol marking (644E01000)EACH2$655.00$655.00$410.00
44Parking lot stall marking (644E01200)FT266$6.00$6.00$2.75
45Lane arrow (644E01300)EACH19$93.00$93.00$110.00
46Law enforcement officer with patrol car for assistance (614E11110)HR8$120.00$125.00$135.32
47Work zone lane line, class I, 4" (614E20000)MI0.04$1,500.00$1,500.00$625.00
48Work zone lane line, class III, 4", 642 paint (614E20550)MI0.04$1,500.00$1,500.00$625.00
49Work zone center line, class I (614E21000)MI1.13$3,000.00$3,000.00$1,400.00
50Work zone center line, class III, 642 paint (614E21550)MI1.13$3,000.00$3,000.00$1,400.00
51Work zone edge line, class I, 4" (614E22000)MI1.05$1,500.00$1,500.00$935.00
52Work zone edge line, class III, 4", 642 paint (614E22350)MI1.05$1,500.00$1,500.00$935.00
53Work zone channelizing line, class I, 8" (614E23000)FT274$1.50$1.50$1.15
54Work zone channelizing line, class III, 8", 642 paint (614E23680)FT274$1.50$1.50$1.15
55Work zone transverse/diagonal line, class I (614E25000)FT174$1.00$1.00$1.95
56Work zone transverse/diagonal line, class III, 642 paint (614E25620)FT174$1.00$1.00$1.95
57Work zone stop line, class I (614E26000)FT168$3.00$3.00$3.90
58Work zone stop line, class III, 642 paint (614E26610)FT168$3.00$3.00$3.90
59Work zone crosswalk line, class I, 12" (614E27010)FT720$1.00$1.00$1.95
60Work zone crosswalk line, class I, 24" (614E27020)FT60$2.00$2.00$1.95
61Work zone crosswalk line, class III, 12", 642 paint (614E27250)FT720$1.00$1.00$1.95
62Work zone crosswalk line, class III, 24", 642 paint (614E27260)FT60$2.00$2.00$1.95
63Work zone arrow, class I (614E30000)EACH19$25.00$25.00$46.75
64Work zone arrow, class III, 642 paint (614E30650)EACH19$25.00$25.00$46.75
65Work zone railroad symbol marking, class I (614E32000)EACH2$134.00$134.00$187.50
66Work zone railroad symbol marking, class III, 642 paint (614E32210)EACH2$134.00$134.00$187.50
67Work zone island marking, class I (614E32700)SF125$0.50$0.50$2.35
68Work zone island marking, class III, 642 paint (614E32800)SF125$0.50$0.50$2.35
69Premium on railroads' protective public liability and property damage liability insurance (100E00300)LS1$5,000.00$14,150$5,000.00
70Premium for contract performance bond and for payment bond (103E05000)LS1$10,000$2,155.55$5,981.70
71Maintaining traffic (614E11000)LS1$40,000$32,000$61,277
72Construction layout stakes and surveying (623E10000)LS1$5,000.00$2,150.00$4,821.97
73Mobilization (624E10000)LS1$52,000$29,500$48,750
ODOT contract 260043: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way