ODOT contract 260043 bid tabulation
BUT-SR 73-16.05 (TWO LANE RESURFACING). Let by Ohio DOT on January 29, 2026, BUT. 3 bids received; low bid $878,414 by Fillmore Construction, -13% against the engineer's estimate of $1,006,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 73
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fillmore Construction | $878,414 | Low | -13% |
| 2 | Barrett Paving Materials Inc | $917,530 | +4.0% | -9.0% |
| 3 | John R Jurgensen Company | $976,410 | +11% | -3.0% |
Engineer's estimate: $1,006,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Fillmore Construction | 2. Barrett Paving Materials Inc | 3. John R Jurgensen Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $2,500.00 | $2,800.00 | $513.57 |
| 2 | Walk removed, as per plan (202E30001) | SF | 3,043 | $12.00 | $6.50 | $6.00 |
| 3 | Curb removed, as per plan (202E32001) | FT | 80 | $17.00 | $22.25 | $18.75 |
| 4 | Curb and gutter removed, as per plan (202E32501) | FT | 262 | $20.00 | $27.00 | $20.00 |
| 5 | Excavation (203E10000) | CY | 10 | $100.00 | $55.00 | $200.00 |
| 6 | Embankment (203E20000) | CY | 50 | $100.00 | $75.00 | $75.00 |
| 7 | 4" concrete walk (608E10000) | SF | 1,622 | $20.00 | $13.75 | $14.00 |
| 8 | Curb ramp, as per plan (608E52001) | SF | 2,786 | $24.00 | $27.25 | $15.00 |
| 9 | Detectable warning (608E53020) | SF | 20 | $50.00 | $100.00 | $50.00 |
| 10 | Combination curb and gutter, type 2 (609E12000) | FT | 97 | $100.00 | $75.75 | $55.00 |
| 11 | Curb, type 6 (609E26000) | FT | 84 | $80.00 | $56.50 | $47.00 |
| 12 | Topsoil (659E00300) | CY | 20 | $60.00 | $165.00 | $75.00 |
| 13 | Seeding and mulching, class 1 (659E00500) | SY | 180 | $10.00 | $5.00 | $20.00 |
| 14 | Erosion control (832E30000) | EACH | 10,000 | $1.00 | $1.00 | $1.00 |
| 15 | 6" base pipe underdrains (605E14000) | FT | 100 | $50.00 | $41.00 | $15.00 |
| 16 | Catch basin adjusted to grade (611E98630) | EACH | 10 | $2,000.00 | $1,285.00 | $1,498.66 |
| 17 | Manhole adjusted to grade (611E99654) | EACH | 9 | $1,000.00 | $900.00 | $1,353.62 |
| 18 | Valve box adjusted to grade (638E10800) | EACH | 9 | $500.00 | $775.00 | $934.67 |
| 19 | Pavement repair (253E02000) | CY | 236 | $260.00 | $430.00 | $468.54 |
| 20 | Pavement planing, asphalt concrete, as per plan, 3 (254E01001) | SY | 19,183 | $3.00 | $3.75 | $3.91 |
| 21 | Patching planed surface (254E01600) | SY | 1,922 | $5.00 | $8.50 | $7.07 |
| 22 | Non-tracking tack coat (407E20000) | GAL | 3,073 | $3.00 | $4.50 | $5.00 |
| 23 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 671 | $228.00 | $254.00 | $297.20 |
| 24 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 936 | $218.00 | $237.00 | $247.65 |
| 25 | Ground mounted support, no. 3 post (630E03100) | FT | 77 | $15.00 | $15.00 | $18.00 |
| 26 | Sign, flat sheet (630E80100) | SF | 26 | $15.00 | $15.50 | $25.00 |
| 27 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $15.00 | $15.00 | $15.00 |
| 28 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $45.00 | $45.00 | $75.00 |
| 29 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $20.00 | $20.00 | $35.00 |
| 30 | Signing, misc.: relocation of solar powered rectan (630E97700) | EACH | 2 | $2,495.00 | $1,310.00 | $1,310.00 |
| 31 | Detector loop (632E26500) | EACH | 2 | $1,795.00 | $1,445.00 | $1,445.00 |
| 32 | Loop detector tie in (632E27200) | EACH | 2 | $120.00 | $185.00 | $185.00 |
| 33 | Pedestal foundation (632E64020) | EACH | 2 | $2,390.00 | $1,660.00 | $1,660.00 |
| 34 | Edge line, 4" (644E00100) | MI | 1.05 | $2,559.00 | $2,559.00 | $3,575.00 |
| 35 | Lane line, 4" (644E00200) | MI | 0.04 | $5,000.00 | $5,000.00 | $1,510.00 |
| 36 | Center line (644E00300) | MI | 1.13 | $5,100.00 | $5,100.00 | $5,500.00 |
| 37 | Channelizing line, 8" (644E00400) | FT | 274 | $3.00 | $3.00 | $2.05 |
| 38 | Stop line (644E00500) | FT | 168 | $7.00 | $7.00 | $6.90 |
| 39 | Crosswalk line, 12" (644E00620) | FT | 720 | $3.50 | $3.50 | $3.45 |
| 40 | Crosswalk line, 24" (644E00630) | FT | 60 | $7.00 | $7.00 | $5.50 |
| 41 | Transverse/diagonal line (644E00700) | FT | 174 | $7.00 | $7.00 | $6.90 |
| 42 | Island marking (644E00900) | SF | 125 | $3.50 | $3.50 | $4.10 |
| 43 | Railroad symbol marking (644E01000) | EACH | 2 | $655.00 | $655.00 | $410.00 |
| 44 | Parking lot stall marking (644E01200) | FT | 266 | $6.00 | $6.00 | $2.75 |
| 45 | Lane arrow (644E01300) | EACH | 19 | $93.00 | $93.00 | $110.00 |
| 46 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 8 | $120.00 | $125.00 | $135.32 |
| 47 | Work zone lane line, class I, 4" (614E20000) | MI | 0.04 | $1,500.00 | $1,500.00 | $625.00 |
| 48 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 0.04 | $1,500.00 | $1,500.00 | $625.00 |
| 49 | Work zone center line, class I (614E21000) | MI | 1.13 | $3,000.00 | $3,000.00 | $1,400.00 |
| 50 | Work zone center line, class III, 642 paint (614E21550) | MI | 1.13 | $3,000.00 | $3,000.00 | $1,400.00 |
| 51 | Work zone edge line, class I, 4" (614E22000) | MI | 1.05 | $1,500.00 | $1,500.00 | $935.00 |
| 52 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 1.05 | $1,500.00 | $1,500.00 | $935.00 |
| 53 | Work zone channelizing line, class I, 8" (614E23000) | FT | 274 | $1.50 | $1.50 | $1.15 |
| 54 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 274 | $1.50 | $1.50 | $1.15 |
| 55 | Work zone transverse/diagonal line, class I (614E25000) | FT | 174 | $1.00 | $1.00 | $1.95 |
| 56 | Work zone transverse/diagonal line, class III, 642 paint (614E25620) | FT | 174 | $1.00 | $1.00 | $1.95 |
| 57 | Work zone stop line, class I (614E26000) | FT | 168 | $3.00 | $3.00 | $3.90 |
| 58 | Work zone stop line, class III, 642 paint (614E26610) | FT | 168 | $3.00 | $3.00 | $3.90 |
| 59 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 720 | $1.00 | $1.00 | $1.95 |
| 60 | Work zone crosswalk line, class I, 24" (614E27020) | FT | 60 | $2.00 | $2.00 | $1.95 |
| 61 | Work zone crosswalk line, class III, 12", 642 paint (614E27250) | FT | 720 | $1.00 | $1.00 | $1.95 |
| 62 | Work zone crosswalk line, class III, 24", 642 paint (614E27260) | FT | 60 | $2.00 | $2.00 | $1.95 |
| 63 | Work zone arrow, class I (614E30000) | EACH | 19 | $25.00 | $25.00 | $46.75 |
| 64 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 19 | $25.00 | $25.00 | $46.75 |
| 65 | Work zone railroad symbol marking, class I (614E32000) | EACH | 2 | $134.00 | $134.00 | $187.50 |
| 66 | Work zone railroad symbol marking, class III, 642 paint (614E32210) | EACH | 2 | $134.00 | $134.00 | $187.50 |
| 67 | Work zone island marking, class I (614E32700) | SF | 125 | $0.50 | $0.50 | $2.35 |
| 68 | Work zone island marking, class III, 642 paint (614E32800) | SF | 125 | $0.50 | $0.50 | $2.35 |
| 69 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $14,150 | $5,000.00 |
| 70 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,000 | $2,155.55 | $5,981.70 |
| 71 | Maintaining traffic (614E11000) | LS | 1 | $40,000 | $32,000 | $61,277 |
| 72 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $2,150.00 | $4,821.97 |
| 73 | Mobilization (624E10000) | LS | 1 | $52,000 | $29,500 | $48,750 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.