TDOT contract CNZ037 bid tabulation

The microsurfacing on u.s. 41 (u.s. 64, u.s. 72, s.r. 2) from near s.r. 134 (l.m. 21.75) to the hamilton county line (l.m. 33.91). Let by Tennessee DOT on February 7, 2025, Marion County. 2 bids received; low bid $1,504,902 by Asphalt Paving Systems, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
26
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Asphalt Paving Systems, Inc.$1,504,902Low
2Wiregrass Construction Company, Inc$1,909,871+27%
TDOT contract CNZ037: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Asphalt Paving Systems, Inc.2. Wiregrass Construction Company, Inc
1Brooming & degrassing shoulders (208-01.05)LM24.80$1,000.00$2,917.69
2Mineral aggregate, type A base, grading D (303-01)TON300$63.16$100.94
3Bituminous material for tack coat (micro-surfacing) (403-01.01)TON25$1,102.91$1,682.36
4High performance fog seals (403-01.10)SY48,852$1.79$0.87
5Emulsified asphalt for micro-surfacing (414-03.01)TON244$1,205.29$1,187.20
6Aggregate for micro surfacing (414-03.02)TON2,033$120.12$216.33
7Guardrail delineation enhancement (BI-directional) (705-04.22)EACH11,541$8.16$4.48
8Traffic control (712-01)LS1$38,650$54,353
9Flexible drums (channelizing) (712-04.01)EACH20$35.79$49.02
10Signs (construction) (712-06)SF473$8.37$11.46
11Arrow board (type C) (712-08.03)EACH2$1,421.05$1,946.35
12Changeable message sign unit (713-16.01)EACH2$8,526.32$11,678
13Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH820$42.11$57.67
14Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH148$42.11$57.67
15Removal of snowplowable reflective marker (716-01.30)EACH968$12.63$84.70
16Plastic pavement marking(channelization striping) (716-02.04)SY115$23.16$31.72
17Plastic pavement marking (stop line) (716-02.05)LF15$12.63$17.30
18Plastic pavement marking (turn lane arrow) (716-02.06)EACH1$263.16$252.30
19Plastic pavement marking (lane reduction arrow) (716-04.14)EACH2$315.79$324.39
20Painted pavement marking (4" line) (716-05.01)LM24$1,047.37$2,162.61
21Removal of pavement marking (channelization striping) (716-08.04)SY115$8.42$14.42
22Removal of pavement marking (stop line) (716-08.05)LF15$6.32$7.21
23Removal of pavement marking (line) (716-08.20)LM24.60$2,947.37$1,466.00
24Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM49.20$7,284.21$9,371.29
25Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF20$2.11$3.24
26Mobilization (717-01)LS1$136,581$160,000
TDOT contract CNZ037: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy