TDOT contract CNZ202 bid tabulation
The resurfacing (microsurface or thin mix overlay) on s.r. 7 from near riverview lane (l.m. 15.29) to near old highway 7 (l.m. 19.55), including repair work on bridges. Let by Tennessee DOT on June 27, 2025, Maury County. 4 bids received; low bid $1,984,039 by Eubank Asphalt Paving & Sealing, LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 30
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eubank Asphalt Paving & Sealing, LLC | $1,984,039 | Low |
| 2 | Rogers Group, Inc. | $2,144,570 | +8.0% |
| 3 | Asphalt Paving Systems, Inc. | $2,439,157 | +23% |
| 4 | Vulcan Construction Materials, LLC | $2,573,239 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eubank Asphalt Paving & Sealing, LLC | 2. Rogers Group, Inc. | 3. Asphalt Paving Systems, Inc. | 4. Vulcan Construction Materials, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 8.50 | $800.00 | $2,800.00 | $1,000.00 | $1,800.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 766 | $15.00 | $52.00 | $55.08 | $40.00 |
| 3 | Bituminous material (BSC) (405-01.01) | TON | 238 | $935.00 | $910.00 | $1,095.08 | $1,700.00 |
| 4 | Mineral aggregate (BSC) (405-01.02) | TON | 2,071 | $55.00 | $59.25 | $102.97 | $94.00 |
| 5 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 3.70 | $1,000.00 | $1,600.00 | $2,205.00 | $2,100.00 |
| 6 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 1.20 | $1,000.00 | $1,900.00 | $2,205.00 | $2,100.00 |
| 7 | Traffic control (712-01) | LS | 1 | $55,000 | $70,000 | $146,462 | $90,000 |
| 8 | Flexible drums (channelizing) (712-04.01) | EACH | 50 | $20.00 | $37.00 | $36.75 | $40.00 |
| 9 | Signs (construction) (712-06) | SF | 1,197 | $7.50 | $7.75 | $7.77 | $11.00 |
| 10 | Arrow board (type C) (712-08.03) | EACH | 2 | $750.00 | $1,575.00 | $1,575.00 | $1,250.00 |
| 11 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 585 | $30.00 | $40.00 | $39.90 | $38.00 |
| 12 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 570 | $30.00 | $40.00 | $39.90 | $38.00 |
| 13 | Removal of snowplowable reflective marker (716-01.30) | EACH | 326 | $10.00 | $13.50 | $13.65 | $13.00 |
| 14 | Plastic pavement marking (stop line) (716-02.05) | LF | 190 | $25.00 | $21.00 | $21.00 | $20.00 |
| 15 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 31 | $225.00 | $210.00 | $210.00 | $200.00 |
| 16 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $15,000 | $21,000 | $21,000 | $20,000 |
| 17 | Painted pavement marking (6" line) (716-05.20) | LM | 21 | $1,100.00 | $1,875.00 | $1,890.00 | $1,800.00 |
| 18 | Contrast PVMT shadow marking 6" (tape) (716-09.57) | LF | 1,250 | $7.00 | $8.50 | $8.40 | $8.00 |
| 19 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 21 | $6,850.00 | $8,050.00 | $8,400.00 | $8,000.00 |
| 20 | Preformed permanent tape (6IN line) (716-15.10) | LF | 3,320 | $6.50 | $7.45 | $8.40 | $8.00 |
| 21 | Mobilization (717-01) | LS | 1 | $173,000 | $70,000 | $205,991 | $80,000 |
| 22 | Expansion joint repairs (604-10.44) | LF | 241 | $200.00 | $330.00 | $640.50 | $350.00 |
| 23 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 15 | $500.00 | $1,100.00 | $1,575.00 | $1,000.00 |
| 24 | Concrete repairs (604-10.53) | SY | 20 | $650.00 | $1,875.00 | $1,732.50 | $1,000.00 |
| 25 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 8,325 | $45.00 | $37.75 | $36.93 | $50.00 |
| 26 | Bituminous material for tack coat (TC) (403-01) | TON | 62 | $425.00 | $810.00 | $1,000.00 | |
| 27 | Acs mix(PG64-22) thin lift D asphalt (411-03.12) | TON | 5,724 | $116.50 | $135.25 | $145.00 | |
| 28 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 96 | $280.20 | |||
| 29 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 234 | $1,293.17 | |||
| 30 | Aggregate for micro surfacing (414-03.02) | TON | 1,938 | $190.84 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.