TxDOT contract A00064155 bid tabulation
Bridge Replacement, FM 324 (AT HURRICANE CREEK to .). Let by Texas DOT on April 3, 2025, Angelina, Lufkin District. 6 bids received; low bid $27,229,475 by A. L. Helmcamp, Inc., -10% against the engineer's estimate of $30,366,663.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 148
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. L. Helmcamp, Inc. | $27,229,475 | Low | -10% |
| 2 | Altus Construction LLC | $27,998,349 | +3.0% | -8.0% |
| 3 | Longview Bridge and Road, LTD. | $29,311,939 | +8.0% | -3.0% |
| 4 | James Construction Group, LLC | $29,618,816 | +9.0% | -2.0% |
| 5 | Ragle Construction, Inc. | $30,330,404 | +11% | 0.0% |
| 6 | Isi Contracting, Inc. | $30,433,670 | +12% | 0.0% |
Engineer's estimate: $30,366,663.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. L. Helmcamp, Inc. | 2. Altus Construction LLC | 3. Longview Bridge and Road, LTD. | 4. James Construction Group, LLC | 5. Ragle Construction, Inc. | 6. Isi Contracting, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 161 | $3,000.00 | $2,500.00 | $17,221 | $6,000.00 | $17,000 | $2,950.00 | $6,211.00 |
| 2 | Disposal of water well (103-7001) | EACH | 2 | $6,000.00 | $7,500.00 | $10,618 | $3,100.00 | $7,500.00 | $1,500.00 | $5,500.00 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 1,088 | $32.00 | $19.91 | $42.00 | $31.40 | $15.00 | $77.00 | |
| 4 | Remove (11") TRT/untrt base & asphalt pavement (105-7031) | SY | 7,221 | $20.00 | $5.75 | $3.45 | $6.50 | $7.86 | $8.00 | $6.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 9,185 | $25.00 | $12.00 | $14.17 | $16.00 | $27.07 | $30.00 | $16.00 |
| 6 | Excavation (channel) (110-7002) | CY | 389 | $70.00 | $12.00 | $22.78 | $40.00 | $36.50 | $20.00 | $28.00 |
| 7 | Excavation (special) (110-7003) | CY | 4,009 | $15.00 | $12.00 | $24.75 | $28.00 | $24.53 | $20.00 | $7.11 |
| 8 | Embankment (final)(OC)(type B) (132-7003) | CY | 1,952 | $19.00 | $26.55 | $35.50 | $68.19 | $25.00 | $54.00 | |
| 9 | Embankment (final)(DC)(type C) (132-7006) | CY | 15,410 | $25.00 | $40.00 | $19.47 | $20.00 | $32.78 | $10.00 | $48.00 |
| 10 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 167 | $12.00 | $53.09 | $52.00 | $68.18 | $30.00 | $62.00 | |
| 11 | Blading (150-7001) | STA | 137 | $115.00 | $278.73 | $190.00 | $927.82 | $185.00 | $1,510.00 | |
| 12 | Spec excavation work (hyd excavator) (158-7002) | HR | 33 | $175.00 | $155.00 | $318.55 | $250.00 | $564.07 | $135.00 | $749.00 |
| 13 | Block sodding (162-7002) | SY | 869 | $10.00 | $6.50 | $6.45 | $6.25 | $5.00 | $12.00 | $11.92 |
| 14 | Broadcast seed (temporary_warm) (164-7005) | SY | 9,471 | $0.50 | $0.35 | $0.80 | $0.15 | $0.15 | $0.13 | $0.32 |
| 15 | Broadcast seed (temporary_cool) (164-7006) | SY | 11,586 | $0.50 | $0.35 | $0.80 | $0.20 | $0.20 | $0.15 | $0.27 |
| 16 | Bond fiber MTRX seed (permanent)(rural)(clay) (164-7083) | SY | 18,941 | $1.00 | $0.95 | $0.90 | $0.65 | $0.80 | $0.56 | $1.44 |
| 17 | Vegetative watering (168-7001) | TGL | 397.30 | $25.00 | $15.00 | $29.13 | $52.00 | $42.04 | $40.00 | $60.00 |
| 18 | FL BS (roadway del) (type A GR 3) (247-7198) | TON | 9,631 | $50.00 | $72.00 | $46.61 | $64.00 | $58.80 | $60.00 | $75.00 |
| 19 | Cement (275-7001) | TON | 968 | $260.00 | $225.00 | $219.00 | $365.00 | $292.14 | $300.00 | $232.64 |
| 20 | Cement TRT (existing material & new base)(12") (275-7009) | SY | 45,830 | $6.50 | $2.75 | $7.14 | $4.50 | $6.51 | $4.30 | $6.25 |
| 21 | Cement TRT (new base)(12") (275-7013) | SY | 7,275 | $10.00 | $2.75 | $1.99 | $4.50 | $10.42 | $3.80 | $4.05 |
| 22 | Cement TRT (subgrade)(12") (275-7015) | SY | 1,234 | $2.75 | $4.58 | $7.00 | $6.67 | $6.00 | $8.67 | |
| 23 | Asphalt (RC-250) (316-7032) | TON | 109 | $1,250.00 | $1,050.00 | $1,914.32 | $1,250.00 | $550.00 | $1,250.00 | $13.43 |
| 24 | Asphalt (AC-15P or CRS-2P) (316-7088) | TON | 98.80 | $1,250.00 | $1,050.00 | $983.91 | $1,250.00 | $550.00 | $1,250.00 | $16.78 |
| 25 | Aggregate (type E or L, GR-5) (316-7254) | CY | 708 | $225.00 | $175.00 | $269.54 | $175.00 | $320.00 | $150.00 | $1,007.00 |
| 26 | Aggregate (type E or L, PE or PL GR 4) (316-7268) | CY | 409 | $225.00 | $200.00 | $181.77 | $250.00 | $198.00 | $200.00 | $403.00 |
| 27 | SP mixes SP-B PG64-22 (344-7001) | TON | 815 | $175.00 | $201.58 | $190.00 | $141.00 | $205.00 | $210.00 | |
| 28 | SP mixes SP-C PG70-22 (344-7019) | TON | 5,592 | $180.00 | $165.00 | $197.42 | $186.00 | $172.00 | $205.00 | $206.00 |
| 29 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 5,614 | $180.00 | $170.00 | $190.80 | $180.00 | $173.00 | $210.00 | $199.00 |
| 30 | SP mixes SP-C sac-A PG70-22 (exempt) (344-7022) | TON | 56 | $200.00 | $500.00 | $557.45 | $525.00 | $250.00 | $210.00 | $582.00 |
| 31 | Planing asphalt concrete pavement(2") (354-7051) | SY | 834 | $5.00 | $10.09 | $8.00 | $10.40 | $12.00 | $19.27 | |
| 32 | Cem stabil BKFL (400-7010) | CY | 331 | $350.00 | $185.00 | $260.89 | $300.00 | $197.34 | $115.00 | $391.74 |
| 33 | Temporary special shoring (403-7001) | SF | 1,335 | $65.00 | $61.00 | $31.85 | $60.00 | $72.54 | $45.00 | $29.94 |
| 34 | Drilled shaft (18 in) (416-7002) | LF | 180 | $250.00 | $260.00 | $373.56 | $315.00 | $59.80 | $80.00 | $281.00 |
| 35 | Drilled shaft (36 in) (416-7006) | LF | 3,870 | $350.00 | $290.00 | $168.02 | $450.00 | $220.18 | $240.00 | $388.00 |
| 36 | Drilled shaft (42 in) (416-7007) | LF | 420 | $650.00 | $365.00 | $319.32 | $550.00 | $300.31 | $320.00 | $570.00 |
| 37 | Drilled shaft (48 in) (416-7008) | LF | 800 | $1,000.00 | $660.00 | $409.80 | $515.00 | $390.67 | $425.00 | $633.00 |
| 38 | Class C concrete (abutment) (420-7012) | CY | 79.40 | $1,800.00 | $1,300.00 | $1,125.63 | $1,100.00 | $1,074.15 | $1,200.00 | $2,705.66 |
| 39 | Class C concrete (cap) (420-7022) | CY | 485.70 | $2,000.00 | $1,500.00 | $1,113.89 | $1,250.00 | $1,587.95 | $1,700.00 | $2,279.00 |
| 40 | Class C concrete (column) (420-7038) | CY | 429.20 | $2,200.00 | $1,350.00 | $1,034.77 | $1,350.00 | $1,565.87 | $1,600.00 | $2,364.00 |
| 41 | Class C concrete (crashwall) (420-7050) | CY | 215.40 | $2,000.00 | $1,050.00 | $566.91 | $565.00 | $831.96 | $1,400.00 | $1,750.00 |
| 42 | Class C concrete (collar) (420-7061) | EACH | 1 | $6,000.00 | $5,309.09 | $3,250.00 | $3,689.85 | $1,525.00 | $4,503.00 | |
| 43 | Reinforced concrete slab (422-7001) | SF | 118,680 | $30.00 | $32.00 | $26.55 | $30.00 | $27.10 | $22.00 | $20.00 |
| 44 | Approach slab (422-7013) | CY | 92.90 | $1,000.00 | $900.00 | $1,075.43 | $910.00 | $673.84 | $580.00 | $1,423.00 |
| 45 | Prestressed concrete girder (TX34) (425-7002) | LF | 2,027.88 | $200.00 | $200.00 | $221.57 | $235.00 | $249.16 | $230.00 | $238.00 |
| 46 | Prestressed concrete girder (TX54) (425-7005) | LF | 9,378.31 | $225.00 | $220.00 | $228.61 | $250.00 | $265.27 | $260.00 | $236.00 |
| 47 | Riprap (stone common)(grout)(12 in) (432-7038) | CY | 141 | $450.00 | $350.00 | $424.73 | $380.00 | $356.00 | $330.00 | $168.00 |
| 48 | Riprap (stone common)(grout)(18 in) (432-7039) | CY | 54 | $300.00 | $375.00 | $530.91 | $377.00 | $351.40 | $360.00 | $195.00 |
| 49 | Riprap (stone protection)(27 in) (432-7046) | CY | 1,273 | $275.00 | $325.00 | $160.52 | $400.00 | $231.08 | $170.00 | $166.00 |
| 50 | Elastomeric bearing (E7) (434-7027) | EACH | 6 | $4,700.00 | $5,000.00 | $7,831.98 | $4,700.00 | $5,365.84 | $4,000.00 | $1,731.00 |
| 51 | Elastomeric bearing (F7) (434-7037) | EACH | 6 | $5,000.00 | $5,000.00 | $7,517.68 | $4,800.00 | $5,365.84 | $4,000.00 | $1,731.00 |
| 52 | Sliding elastomeric bearing (ES 7) (434-7047) | EACH | 12 | $4,500.00 | $5,500.00 | $1,083.06 | $4,550.00 | $5,393.35 | $4,000.00 | $2,423.00 |
| 53 | STR steel (plate girder) (442-7001) | LB | 2,666,932 | $2.50 | $2.30 | $2.45 | $2.75 | $2.75 | $2.00 | $2.00 |
| 54 | Rail (type SSTR) (450-7024) | LF | 5,228 | $135.00 | $85.00 | $61.90 | $71.00 | $59.62 | $60.00 | $160.00 |
| 55 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 329 | $280.00 | $240.00 | $179.89 | $270.00 | $220.78 | $190.00 | $177.00 |
| 56 | Sealed expansion joint (5 in) (SEJ - M) (454-7005) | LF | 90 | $320.00 | $300.00 | $195.02 | $307.00 | $224.06 | $190.00 | $177.00 |
| 57 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 4 | $990.00 | $350.40 | $2,100.00 | $2,126.00 | $1,200.00 | $5,724.00 | |
| 58 | RC pipe (CL III)(18 in) (464-7003) | LF | 640 | $99.00 | $58.71 | $79.50 | $88.44 | $90.00 | $202.00 | |
| 59 | RC pipe (CL III)(24 in) (464-7005) | LF | 164 | $160.00 | $121.00 | $90.04 | $98.00 | $110.82 | $125.00 | $342.00 |
| 60 | RC pipe (CL V)(18 in) (464-7032) | LF | 235 | $127.00 | $87.06 | $92.00 | $129.24 | $95.00 | $265.00 | |
| 61 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 2 | $9,900.00 | $7,555.50 | $4,200.00 | $13,484 | $9,665.00 | $23,416 | |
| 62 | Wingwall (PW - 1) (HW=3 FT) (466-7173) | EACH | 1 | $17,700 | $13,140 | $10,700 | $14,268 | $8,850.00 | $44,609 | |
| 63 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 1 | $1,300.00 | $1,066.49 | $1,800.00 | $941.54 | $1,475.00 | $4,477.00 | |
| 64 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 56 | $1,300.00 | $1,066.49 | $1,230.00 | $941.54 | $1,335.00 | $3,422.00 | |
| 65 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 4 | $2,000.00 | $2,100.00 | $1,777.48 | $1,650.00 | $1,501.52 | $2,150.00 | $4,266.00 |
| 66 | Removing structure (set) (496-7004) | EACH | 1 | $550.00 | $623.15 | $1,300.00 | $540.37 | $630.00 | $6,500.00 | |
| 67 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $125,000 | $60,000 | $100,873 | $56,000 | $70,000 | $4,500,000 | $163,152 |
| 68 | Removing structure (pipe) (496-7037) | EACH | 1 | $1,500.00 | $550.00 | $995.46 | $1,300.00 | $874.40 | $1,500.00 | $808.60 |
| 69 | Remove STR (driveway culvert) (496-7038) | EACH | 31 | $1,700.00 | $550.00 | $1,743.24 | $1,225.00 | $1,017.33 | $370.00 | $2,000.00 |
| 70 | Mobilization (500-7001) | LS | 1 | $3,000,000 | $2,700,000 | $2,786,627 | $2,000,000 | $1,912,840 | $3,000,000 | $3,000,000 |
| 71 | Barricades, signs and traffic handling (502-7001) | MO | 34 | $3,000.00 | $15,000 | $19,909 | $15,100 | $8,738.11 | $20,000 | $14,549 |
| 72 | Portable changeable message sign (503-7002) | EACH | 4 | $15,000 | $7,500.00 | $7,654.76 | $20,200 | $17,818 | $25,000 | $6,856.00 |
| 73 | TMA (stationary) (505-7001) | DAY | 200 | $250.00 | $400.00 | $265.45 | $500.00 | $820.16 | $300.00 | $329.00 |
| 74 | TMA (mobile operation) (505-7003) | DAY | 50 | $250.00 | $500.00 | $265.45 | $500.00 | $1,252.84 | $825.00 | $827.00 |
| 75 | Rock filter dams (install) (type 1) (506-7001) | LF | 204 | $35.00 | $50.00 | $31.85 | $38.00 | $50.00 | $34.00 | $82.00 |
| 76 | Rock filter dams (remove) (506-7011) | LF | 204 | $10.00 | $17.00 | $13.56 | $12.00 | $10.00 | $11.00 | $25.00 |
| 77 | Construction exits (install) (type 1) (506-7020) | SY | 476 | $45.00 | $38.00 | $27.08 | $39.00 | $25.00 | $35.00 | $70.00 |
| 78 | Construction exits (remove) (506-7024) | SY | 476 | $15.00 | $17.00 | $10.08 | $12.00 | $10.00 | $11.00 | $16.00 |
| 79 | Construction perimeter fence (506-7034) | LF | 1,684 | $15.00 | $5.00 | $4.54 | $11.00 | $6.00 | $6.00 | $7.00 |
| 80 | Temporary sediment control fence (install) (506-7039) | LF | 12,686 | $5.00 | $4.75 | $3.64 | $3.50 | $3.99 | $3.25 | $6.00 |
| 81 | Temporary sediment control fence (remove) (506-7041) | LF | 12,686 | $1.00 | $1.40 | $1.10 | $1.00 | $1.00 | $0.70 | $3.00 |
| 82 | Rock filter dams (install) (type 2) 6:1 (506-7048) | LF | 60 | $110.00 | $67.69 | $41.00 | $50.00 | $37.00 | $227.62 | |
| 83 | Constructing detours (508-7001) | SY | 540 | $150.00 | $165.00 | $183.93 | $210.00 | $173.49 | $150.00 | $525.00 |
| 84 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,540 | $450.00 | $60.00 | $39.82 | $105.00 | $82.02 | $105.00 | $91.77 |
| 85 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 120 | $300.00 | $80.00 | $69.20 | $136.00 | $82.02 | $105.00 | $100.62 |
| 86 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,540 | $60.00 | $13.00 | $15.93 | $10.00 | $7.54 | $14.00 | $16.07 |
| 87 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 120 | $80.00 | $40.00 | $16.19 | $35.00 | $17.63 | $14.00 | $64.45 |
| 88 | Driveways (concrete) (530-7006) | SY | 1,209 | $209.00 | $95.82 | $187.00 | $179.90 | $105.00 | $334.68 | |
| 89 | Driveways (ACP) (530-7010) | SY | 3,440 | $65.00 | $91.00 | $26.40 | $86.00 | $83.59 | $105.00 | $85.79 |
| 90 | Driveways (base) (530-7015) | SY | 169 | $64.00 | $71.67 | $50.00 | $51.97 | $75.00 | $150.00 | |
| 91 | Turnouts (ACP) (530-7018) | SY | 290 | $60.00 | $102.32 | $142.00 | $242.26 | $170.00 | $126.38 | |
| 92 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 750 | $18.00 | $8.10 | $13.00 | $9.60 | $8.00 | $13.90 | |
| 93 | Metal W-beam guard fence (timber post) (540-7001) | LF | 250 | $35.00 | $28.00 | $22.85 | $27.50 | $26.75 | $26.75 | $50.71 |
| 94 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,500.00 | $1,950.00 | $1,990.91 | $2,100.00 | $1,750.00 | $1,750.00 | $1,865.06 |
| 95 | Remove metal beam guard fence (542-7001) | LF | 325 | $8.00 | $4.50 | $2.56 | $4.50 | $2.00 | $2.00 | $17.23 |
| 96 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 4 | $270.00 | $440.00 | $219.00 | $450.00 | $150.00 | $150.00 | $1,413.67 |
| 97 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,300.00 | $2,653.12 | $3,300.00 | $3,050.00 | $3,050.00 | $4,067.72 |
| 98 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $700.00 | $440.00 | $254.84 | $440.00 | $200.00 | $200.00 | $1,413.67 |
| 99 | Chain link fence (install) (8') (550-7005) | LF | 570 | $75.00 | $66.00 | $31.85 | $47.00 | $94.59 | $75.00 | $109.66 |
| 100 | Wire fence (type C) (552-7003) | LF | 200 | $25.00 | $55.00 | $23.89 | $28.00 | $23.89 | $25.00 | $31.05 |
| 101 | Wire fence (remove) (552-7011) | LF | 200 | $5.00 | $21.00 | $3.88 | $12.00 | $7.00 | $10.00 | $18.21 |
| 102 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 1 | $596.00 | $334.47 | $770.00 | $542.00 | $628.00 | $606.40 | |
| 103 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 17 | $253.00 | $249.53 | $193.00 | $230.00 | $252.00 | $257.33 | |
| 104 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 2 | $270.00 | $292.00 | $250.00 | $245.00 | $297.00 | $274.12 | |
| 105 | Relocate existing mailbox (560-7012) | EACH | 3 | $130.00 | $132.73 | $310.00 | $118.00 | $159.00 | $132.02 | |
| 106 | In RD IL (U/P) (type 1) (250W EQ) LED (610-7015) | EACH | 8 | $1,300.00 | $2,750.00 | $1,934.77 | $6,600.00 | $1,500.00 | $1,250.00 | $1,973.71 |
| 107 | In RD IL (U/P) (type 2) (250W EQ) LED (610-7017) | EACH | 12 | $825.00 | $2,750.00 | $1,858.71 | $7,700.00 | $1,500.00 | $1,500.00 | $2,091.02 |
| 108 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,545 | $24.00 | $16.50 | $12.74 | $6.60 | $20.00 | $20.00 | $35.09 |
| 109 | Conduit (RM) (1") (618-7072) | LF | 958 | $27.00 | $33.00 | $51.10 | $33.00 | $25.00 | $35.00 | $25.67 |
| 110 | Electrical conductor (no.12) insulated (620-7004) | LF | 3,594 | $2.00 | $1.65 | $1.19 | $1.65 | $2.00 | $1.75 | $2.18 |
| 111 | Electrical conductor (no.6) insulated (620-7010) | LF | 5,175 | $2.50 | $2.75 | $2.19 | $2.20 | $2.50 | $2.25 | $3.51 |
| 112 | Ground box type C (162911)W/apron (624-7006) | EACH | 2 | $3,200.00 | $2,420.00 | $1,059.16 | $1,100.00 | $500.00 | $1,500.00 | $1,458.33 |
| 113 | Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009) | EACH | 1 | $8,500.00 | $6,600.00 | $4,778.18 | $7,150.00 | $10,000 | $9,000.00 | $11,696 |
| 114 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $845.00 | $865.38 | $985.00 | $768.00 | $777.00 | $834.16 | |
| 115 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $1,125.00 | $1,079.00 | $1,056.51 | $1,250.00 | $981.00 | $965.00 | $1,065.52 |
| 116 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $4,181.00 | $976.87 | $1,250.00 | $3,801.00 | $1,042.00 | $4,128.46 | |
| 117 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 3 | $1,387.00 | $1,438.76 | $1,450.00 | $1,261.00 | $1,245.00 | $1,369.64 | |
| 118 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 26 | $600.00 | $471.00 | $621.16 | $550.00 | $428.00 | $448.00 | $464.87 |
| 119 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 15 | $725.00 | $581.00 | $695.49 | $726.00 | $528.00 | $541.00 | $573.49 |
| 120 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $560.00 | $589.31 | $705.00 | $509.00 | $554.00 | $552.85 | |
| 121 | Relocate SM RD SN sup&AM type TWT (644-7068) | EACH | 1 | $275.00 | $499.05 | $550.00 | $250.00 | $400.00 | $271.54 | |
| 122 | Remove SM RD SN sup&AM (644-7073) | EACH | 63 | $185.00 | $130.00 | $91.58 | $100.00 | $118.00 | $99.00 | $128.17 |
| 123 | In SRSS & AM (rail)(90 MPH)(P mount) (644-7078) | EACH | 3 | $5,000.00 | $5,500.00 | $3,056.45 | $3,600.00 | $7,741.00 | $5,480.00 | $8,407.90 |
| 124 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 50 | $25.00 | $26.00 | $13.27 | $27.00 | $12.50 | $20.00 | $24.80 |
| 125 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $32.00 | $32.00 | $16.46 | $32.00 | $15.50 | $25.00 | $24.80 |
| 126 | Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061) | EACH | 36 | $150.00 | $88.00 | $132.73 | $83.00 | $125.00 | $153.00 | $24.80 |
| 127 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 1,820 | $4.50 | $6.75 | $5.31 | $4.50 | $6.00 | $3.00 | $6.52 |
| 128 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 1,820 | $4.50 | $6.75 | $5.31 | $4.50 | $6.00 | $3.00 | $6.52 |
| 129 | Work zone pavement marking removing (W)8"(DOT) (662-7070) | LF | 38 | $4.85 | $5.31 | $11.00 | $4.40 | $7.55 | $4.78 | |
| 130 | Work zone pavement marking removing (W)8"(solid) (662-7072) | LF | 68 | $2.55 | $2.65 | $11.00 | $2.33 | $7.55 | $2.53 | |
| 131 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 44 | $15.00 | $8.80 | $8.49 | $27.50 | $8.00 | $20.00 | $8.69 |
| 132 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 113 | $1.05 | $0.50 | $2.25 | $2.00 | $1.62 | $2.16 | |
| 133 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,700 | $2.00 | $1.05 | $0.52 | $2.25 | $2.00 | $1.68 | $2.16 |
| 134 | Reflectorized pavement marking type I (W)8"(broken)(090MIL) (666-7014) | LF | 150 | $1.10 | $2.65 | $2.50 | $1.00 | $3.95 | $1.09 | |
| 135 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 600 | $1.10 | $1.59 | $1.10 | $1.00 | $3.95 | $1.09 | |
| 136 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 5,260 | $0.50 | $0.33 | $0.74 | $0.60 | $0.30 | $1.50 | $0.33 |
| 137 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 5,260 | $0.50 | $0.33 | $0.74 | $0.60 | $0.30 | $1.50 | $0.33 |
| 138 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 36,369 | $1.50 | $0.72 | $0.74 | $0.90 | $0.65 | $0.98 | $0.71 |
| 139 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 750 | $0.66 | $0.80 | $1.10 | $0.60 | $0.98 | $0.65 | |
| 140 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 6,281 | $1.50 | $0.72 | $0.80 | $1.10 | $0.65 | $0.98 | $0.71 |
| 141 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 28,863 | $1.50 | $0.66 | $0.74 | $0.90 | $0.60 | $0.98 | $0.65 |
| 142 | Prefabricated PM type B (W)(arrow) (668-7023) | EACH | 2 | $688.00 | $265.45 | $275.00 | $625.00 | $1,125.00 | $678.85 | |
| 143 | Prefabricated PM type B (W)(word) (668-7031) | EACH | 2 | $770.00 | $292.00 | $385.00 | $700.00 | $1,125.00 | $760.31 | |
| 144 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 77 | $18.00 | $22.50 | $13.27 | $15.00 | $20.50 | $40.00 | $22.27 |
| 145 | Reflectorized pavement marker type I-C (672-7002) | EACH | 91 | $7.00 | $8.00 | $5.31 | $505.00 | $7.25 | $6.85 | $7.87 |
| 146 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 590 | $7.00 | $8.00 | $5.31 | $5.50 | $7.25 | $6.85 | $7.87 |
| 147 | Eliminating existing PM & markers (4") (677-7001) | LF | 3,130 | $4.00 | $0.70 | $0.58 | $1.10 | $0.60 | $0.55 | $0.65 |
| 148 | Bonding course (3007-7001) | GAL | 5,082 | $6.00 | $4.65 | $6.90 | $7.50 | $7.50 | $7.50 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.