TxDOT contract A00064155 bid tabulation

Bridge Replacement, FM 324 (AT HURRICANE CREEK to .). Let by Texas DOT on April 3, 2025, Angelina, Lufkin District. 6 bids received; low bid $27,229,475 by A. L. Helmcamp, Inc., -10% against the engineer's estimate of $30,366,663.

Owner
Texas DOT
Letting
03 APR 2025
Pay items
148
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1A. L. Helmcamp, Inc.$27,229,475Low-10%
2Altus Construction LLC$27,998,349+3.0%-8.0%
3Longview Bridge and Road, LTD.$29,311,939+8.0%-3.0%
4James Construction Group, LLC$29,618,816+9.0%-2.0%
5Ragle Construction, Inc.$30,330,404+11%0.0%
6Isi Contracting, Inc.$30,433,670+12%0.0%
TxDOT contract A00064155: bids by rank

Engineer's estimate: $30,366,663.

Bid tabulation

LinePay itemUnitQuantityEstimate1. A. L. Helmcamp, Inc.2. Altus Construction LLC3. Longview Bridge and Road, LTD.4. James Construction Group, LLC5. Ragle Construction, Inc.6. Isi Contracting, Inc.
1Preparing row (100-7002)STA161$3,000.00$2,500.00$17,221$6,000.00$17,000$2,950.00$6,211.00
2Disposal of water well (103-7001)EACH2$6,000.00$7,500.00$10,618$3,100.00$7,500.00$1,500.00$5,500.00
3Removing concrete (driveways) (104-7011)SY1,088$32.00$19.91$42.00$31.40$15.00$77.00
4Remove (11") TRT/untrt base & asphalt pavement (105-7031)SY7,221$20.00$5.75$3.45$6.50$7.86$8.00$6.00
5Excavation (roadway) (110-7001)CY9,185$25.00$12.00$14.17$16.00$27.07$30.00$16.00
6Excavation (channel) (110-7002)CY389$70.00$12.00$22.78$40.00$36.50$20.00$28.00
7Excavation (special) (110-7003)CY4,009$15.00$12.00$24.75$28.00$24.53$20.00$7.11
8Embankment (final)(OC)(type B) (132-7003)CY1,952$19.00$26.55$35.50$68.19$25.00$54.00
9Embankment (final)(DC)(type C) (132-7006)CY15,410$25.00$40.00$19.47$20.00$32.78$10.00$48.00
10Embankment (vehicle)(OC)(type B) (132-7015)CY167$12.00$53.09$52.00$68.18$30.00$62.00
11Blading (150-7001)STA137$115.00$278.73$190.00$927.82$185.00$1,510.00
12Spec excavation work (hyd excavator) (158-7002)HR33$175.00$155.00$318.55$250.00$564.07$135.00$749.00
13Block sodding (162-7002)SY869$10.00$6.50$6.45$6.25$5.00$12.00$11.92
14Broadcast seed (temporary_warm) (164-7005)SY9,471$0.50$0.35$0.80$0.15$0.15$0.13$0.32
15Broadcast seed (temporary_cool) (164-7006)SY11,586$0.50$0.35$0.80$0.20$0.20$0.15$0.27
16Bond fiber MTRX seed (permanent)(rural)(clay) (164-7083)SY18,941$1.00$0.95$0.90$0.65$0.80$0.56$1.44
17Vegetative watering (168-7001)TGL397.30$25.00$15.00$29.13$52.00$42.04$40.00$60.00
18FL BS (roadway del) (type A GR 3) (247-7198)TON9,631$50.00$72.00$46.61$64.00$58.80$60.00$75.00
19Cement (275-7001)TON968$260.00$225.00$219.00$365.00$292.14$300.00$232.64
20Cement TRT (existing material & new base)(12") (275-7009)SY45,830$6.50$2.75$7.14$4.50$6.51$4.30$6.25
21Cement TRT (new base)(12") (275-7013)SY7,275$10.00$2.75$1.99$4.50$10.42$3.80$4.05
22Cement TRT (subgrade)(12") (275-7015)SY1,234$2.75$4.58$7.00$6.67$6.00$8.67
23Asphalt (RC-250) (316-7032)TON109$1,250.00$1,050.00$1,914.32$1,250.00$550.00$1,250.00$13.43
24Asphalt (AC-15P or CRS-2P) (316-7088)TON98.80$1,250.00$1,050.00$983.91$1,250.00$550.00$1,250.00$16.78
25Aggregate (type E or L, GR-5) (316-7254)CY708$225.00$175.00$269.54$175.00$320.00$150.00$1,007.00
26Aggregate (type E or L, PE or PL GR 4) (316-7268)CY409$225.00$200.00$181.77$250.00$198.00$200.00$403.00
27SP mixes SP-B PG64-22 (344-7001)TON815$175.00$201.58$190.00$141.00$205.00$210.00
28SP mixes SP-C PG70-22 (344-7019)TON5,592$180.00$165.00$197.42$186.00$172.00$205.00$206.00
29SP mixes SP-C sac-A PG70-22 (344-7020)TON5,614$180.00$170.00$190.80$180.00$173.00$210.00$199.00
30SP mixes SP-C sac-A PG70-22 (exempt) (344-7022)TON56$200.00$500.00$557.45$525.00$250.00$210.00$582.00
31Planing asphalt concrete pavement(2") (354-7051)SY834$5.00$10.09$8.00$10.40$12.00$19.27
32Cem stabil BKFL (400-7010)CY331$350.00$185.00$260.89$300.00$197.34$115.00$391.74
33Temporary special shoring (403-7001)SF1,335$65.00$61.00$31.85$60.00$72.54$45.00$29.94
34Drilled shaft (18 in) (416-7002)LF180$250.00$260.00$373.56$315.00$59.80$80.00$281.00
35Drilled shaft (36 in) (416-7006)LF3,870$350.00$290.00$168.02$450.00$220.18$240.00$388.00
36Drilled shaft (42 in) (416-7007)LF420$650.00$365.00$319.32$550.00$300.31$320.00$570.00
37Drilled shaft (48 in) (416-7008)LF800$1,000.00$660.00$409.80$515.00$390.67$425.00$633.00
38Class C concrete (abutment) (420-7012)CY79.40$1,800.00$1,300.00$1,125.63$1,100.00$1,074.15$1,200.00$2,705.66
39Class C concrete (cap) (420-7022)CY485.70$2,000.00$1,500.00$1,113.89$1,250.00$1,587.95$1,700.00$2,279.00
40Class C concrete (column) (420-7038)CY429.20$2,200.00$1,350.00$1,034.77$1,350.00$1,565.87$1,600.00$2,364.00
41Class C concrete (crashwall) (420-7050)CY215.40$2,000.00$1,050.00$566.91$565.00$831.96$1,400.00$1,750.00
42Class C concrete (collar) (420-7061)EACH1$6,000.00$5,309.09$3,250.00$3,689.85$1,525.00$4,503.00
43Reinforced concrete slab (422-7001)SF118,680$30.00$32.00$26.55$30.00$27.10$22.00$20.00
44Approach slab (422-7013)CY92.90$1,000.00$900.00$1,075.43$910.00$673.84$580.00$1,423.00
45Prestressed concrete girder (TX34) (425-7002)LF2,027.88$200.00$200.00$221.57$235.00$249.16$230.00$238.00
46Prestressed concrete girder (TX54) (425-7005)LF9,378.31$225.00$220.00$228.61$250.00$265.27$260.00$236.00
47Riprap (stone common)(grout)(12 in) (432-7038)CY141$450.00$350.00$424.73$380.00$356.00$330.00$168.00
48Riprap (stone common)(grout)(18 in) (432-7039)CY54$300.00$375.00$530.91$377.00$351.40$360.00$195.00
49Riprap (stone protection)(27 in) (432-7046)CY1,273$275.00$325.00$160.52$400.00$231.08$170.00$166.00
50Elastomeric bearing (E7) (434-7027)EACH6$4,700.00$5,000.00$7,831.98$4,700.00$5,365.84$4,000.00$1,731.00
51Elastomeric bearing (F7) (434-7037)EACH6$5,000.00$5,000.00$7,517.68$4,800.00$5,365.84$4,000.00$1,731.00
52Sliding elastomeric bearing (ES 7) (434-7047)EACH12$4,500.00$5,500.00$1,083.06$4,550.00$5,393.35$4,000.00$2,423.00
53STR steel (plate girder) (442-7001)LB2,666,932$2.50$2.30$2.45$2.75$2.75$2.00$2.00
54Rail (type SSTR) (450-7024)LF5,228$135.00$85.00$61.90$71.00$59.62$60.00$160.00
55Sealed expansion joint (4 in) (SEJ - M) (454-7004)LF329$280.00$240.00$179.89$270.00$220.78$190.00$177.00
56Sealed expansion joint (5 in) (SEJ - M) (454-7005)LF90$320.00$300.00$195.02$307.00$224.06$190.00$177.00
57Concrete box culvert (4 FT X 2 FT) (462-7003)LF4$990.00$350.40$2,100.00$2,126.00$1,200.00$5,724.00
58RC pipe (CL III)(18 in) (464-7003)LF640$99.00$58.71$79.50$88.44$90.00$202.00
59RC pipe (CL III)(24 in) (464-7005)LF164$160.00$121.00$90.04$98.00$110.82$125.00$342.00
60RC pipe (CL V)(18 in) (464-7032)LF235$127.00$87.06$92.00$129.24$95.00$265.00
61Headwall (CH - PW - 0) (diameter= 24 in) (466-7101)EACH2$9,900.00$7,555.50$4,200.00$13,484$9,665.00$23,416
62Wingwall (PW - 1) (HW=3 FT) (466-7173)EACH1$17,700$13,140$10,700$14,268$8,850.00$44,609
63Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307)EACH1$1,300.00$1,066.49$1,800.00$941.54$1,475.00$4,477.00
64Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH56$1,300.00$1,066.49$1,230.00$941.54$1,335.00$3,422.00
65Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH4$2,000.00$2,100.00$1,777.48$1,650.00$1,501.52$2,150.00$4,266.00
66Removing structure (set) (496-7004)EACH1$550.00$623.15$1,300.00$540.37$630.00$6,500.00
67Removing structure (bridge 100 - 499 FT length) (496-7010)EACH1$125,000$60,000$100,873$56,000$70,000$4,500,000$163,152
68Removing structure (pipe) (496-7037)EACH1$1,500.00$550.00$995.46$1,300.00$874.40$1,500.00$808.60
69Remove STR (driveway culvert) (496-7038)EACH31$1,700.00$550.00$1,743.24$1,225.00$1,017.33$370.00$2,000.00
70Mobilization (500-7001)LS1$3,000,000$2,700,000$2,786,627$2,000,000$1,912,840$3,000,000$3,000,000
71Barricades, signs and traffic handling (502-7001)MO34$3,000.00$15,000$19,909$15,100$8,738.11$20,000$14,549
72Portable changeable message sign (503-7002)EACH4$15,000$7,500.00$7,654.76$20,200$17,818$25,000$6,856.00
73TMA (stationary) (505-7001)DAY200$250.00$400.00$265.45$500.00$820.16$300.00$329.00
74TMA (mobile operation) (505-7003)DAY50$250.00$500.00$265.45$500.00$1,252.84$825.00$827.00
75Rock filter dams (install) (type 1) (506-7001)LF204$35.00$50.00$31.85$38.00$50.00$34.00$82.00
76Rock filter dams (remove) (506-7011)LF204$10.00$17.00$13.56$12.00$10.00$11.00$25.00
77Construction exits (install) (type 1) (506-7020)SY476$45.00$38.00$27.08$39.00$25.00$35.00$70.00
78Construction exits (remove) (506-7024)SY476$15.00$17.00$10.08$12.00$10.00$11.00$16.00
79Construction perimeter fence (506-7034)LF1,684$15.00$5.00$4.54$11.00$6.00$6.00$7.00
80Temporary sediment control fence (install) (506-7039)LF12,686$5.00$4.75$3.64$3.50$3.99$3.25$6.00
81Temporary sediment control fence (remove) (506-7041)LF12,686$1.00$1.40$1.10$1.00$1.00$0.70$3.00
82Rock filter dams (install) (type 2) 6:1 (506-7048)LF60$110.00$67.69$41.00$50.00$37.00$227.62
83Constructing detours (508-7001)SY540$150.00$165.00$183.93$210.00$173.49$150.00$525.00
84Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009)LF1,540$450.00$60.00$39.82$105.00$82.02$105.00$91.77
85Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010)LF120$300.00$80.00$69.20$136.00$82.02$105.00$100.62
86Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057)LF1,540$60.00$13.00$15.93$10.00$7.54$14.00$16.07
87Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058)LF120$80.00$40.00$16.19$35.00$17.63$14.00$64.45
88Driveways (concrete) (530-7006)SY1,209$209.00$95.82$187.00$179.90$105.00$334.68
89Driveways (ACP) (530-7010)SY3,440$65.00$91.00$26.40$86.00$83.59$105.00$85.79
90Driveways (base) (530-7015)SY169$64.00$71.67$50.00$51.97$75.00$150.00
91Turnouts (ACP) (530-7018)SY290$60.00$102.32$142.00$242.26$170.00$126.38
92Mill rumble strips (asphalt) (shoulder) (533-7001)LF750$18.00$8.10$13.00$9.60$8.00$13.90
93Metal W-beam guard fence (timber post) (540-7001)LF250$35.00$28.00$22.85$27.50$26.75$26.75$50.71
94Metal beam guard fence trans (thrie-beam) (540-7005)EACH4$1,500.00$1,950.00$1,990.91$2,100.00$1,750.00$1,750.00$1,865.06
95Remove metal beam guard fence (542-7001)LF325$8.00$4.50$2.56$4.50$2.00$2.00$17.23
96RM metal beam guard fence trans (thrie-beam) (542-7004)EACH4$270.00$440.00$219.00$450.00$150.00$150.00$1,413.67
97Guardrail end treatment (install) (544-7001)EACH4$3,000.00$3,300.00$2,653.12$3,300.00$3,050.00$3,050.00$4,067.72
98Guardrail end treatment (remove) (544-7003)EACH4$700.00$440.00$254.84$440.00$200.00$200.00$1,413.67
99Chain link fence (install) (8') (550-7005)LF570$75.00$66.00$31.85$47.00$94.59$75.00$109.66
100Wire fence (type C) (552-7003)LF200$25.00$55.00$23.89$28.00$23.89$25.00$31.05
101Wire fence (remove) (552-7011)LF200$5.00$21.00$3.88$12.00$7.00$10.00$18.21
102Mailbox install-M (TWG-post) type 1 (560-7001)EACH1$596.00$334.47$770.00$542.00$628.00$606.40
103Mailbox install-S (WC-post) type 3 (560-7004)EACH17$253.00$249.53$193.00$230.00$252.00$257.33
104Mailbox install-D (WC-post) type 3 (560-7005)EACH2$270.00$292.00$250.00$245.00$297.00$274.12
105Relocate existing mailbox (560-7012)EACH3$130.00$132.73$310.00$118.00$159.00$132.02
106In RD IL (U/P) (type 1) (250W EQ) LED (610-7015)EACH8$1,300.00$2,750.00$1,934.77$6,600.00$1,500.00$1,250.00$1,973.71
107In RD IL (U/P) (type 2) (250W EQ) LED (610-7017)EACH12$825.00$2,750.00$1,858.71$7,700.00$1,500.00$1,500.00$2,091.02
108Conduit (PVC) (schedule 40) (2") (618-7030)LF1,545$24.00$16.50$12.74$6.60$20.00$20.00$35.09
109Conduit (RM) (1") (618-7072)LF958$27.00$33.00$51.10$33.00$25.00$35.00$25.67
110Electrical conductor (no.12) insulated (620-7004)LF3,594$2.00$1.65$1.19$1.65$2.00$1.75$2.18
111Electrical conductor (no.6) insulated (620-7010)LF5,175$2.50$2.75$2.19$2.20$2.50$2.25$3.51
112Ground box type C (162911)W/apron (624-7006)EACH2$3,200.00$2,420.00$1,059.16$1,100.00$500.00$1,500.00$1,458.33
113Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009)EACH1$8,500.00$6,600.00$4,778.18$7,150.00$10,000$9,000.00$11,696
114Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH6$845.00$865.38$985.00$768.00$777.00$834.16
115Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH6$1,125.00$1,079.00$1,056.51$1,250.00$981.00$965.00$1,065.52
116Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$4,181.00$976.87$1,250.00$3,801.00$1,042.00$4,128.46
117Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH3$1,387.00$1,438.76$1,450.00$1,261.00$1,245.00$1,369.64
118Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH26$600.00$471.00$621.16$550.00$428.00$448.00$464.87
119Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058)EACH15$725.00$581.00$695.49$726.00$528.00$541.00$573.49
120Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH1$560.00$589.31$705.00$509.00$554.00$552.85
121Relocate SM RD SN sup&AM type TWT (644-7068)EACH1$275.00$499.05$550.00$250.00$400.00$271.54
122Remove SM RD SN sup&AM (644-7073)EACH63$185.00$130.00$91.58$100.00$118.00$99.00$128.17
123In SRSS & AM (rail)(90 MPH)(P mount) (644-7078)EACH3$5,000.00$5,500.00$3,056.45$3,600.00$7,741.00$5,480.00$8,407.90
124Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH50$25.00$26.00$13.27$27.00$12.50$20.00$24.80
125Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH10$32.00$32.00$16.46$32.00$15.50$25.00$24.80
126Install object marker assembly (OM-2Z)(WFLX)SRF(BI) (658-7061)EACH36$150.00$88.00$132.73$83.00$125.00$153.00$24.80
127Work zone pavement marking removing (traffic BTN) type W (662-7058)LF1,820$4.50$6.75$5.31$4.50$6.00$3.00$6.52
128Work zone pavement marking removing (traffic BTN) type Y (662-7060)LF1,820$4.50$6.75$5.31$4.50$6.00$3.00$6.52
129Work zone pavement marking removing (W)8"(DOT) (662-7070)LF38$4.85$5.31$11.00$4.40$7.55$4.78
130Work zone pavement marking removing (W)8"(solid) (662-7072)LF68$2.55$2.65$11.00$2.33$7.55$2.53
131Work zone pavement marking removing (W)24"(solid) (662-7077)LF44$15.00$8.80$8.49$27.50$8.00$20.00$8.69
132Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH113$1.05$0.50$2.25$2.00$1.62$2.16
133Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH3,700$2.00$1.05$0.52$2.25$2.00$1.68$2.16
134Reflectorized pavement marking type I (W)8"(broken)(090MIL) (666-7014)LF150$1.10$2.65$2.50$1.00$3.95$1.09
135Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023)LF600$1.10$1.59$1.10$1.00$3.95$1.09
136Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF5,260$0.50$0.33$0.74$0.60$0.30$1.50$0.33
137Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF5,260$0.50$0.33$0.74$0.60$0.30$1.50$0.33
138Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF36,369$1.50$0.72$0.74$0.90$0.65$0.98$0.71
139Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419)LF750$0.66$0.80$1.10$0.60$0.98$0.65
140Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF6,281$1.50$0.72$0.80$1.10$0.65$0.98$0.71
141Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF28,863$1.50$0.66$0.74$0.90$0.60$0.98$0.65
142Prefabricated PM type B (W)(arrow) (668-7023)EACH2$688.00$265.45$275.00$625.00$1,125.00$678.85
143Prefabricated PM type B (W)(word) (668-7031)EACH2$770.00$292.00$385.00$700.00$1,125.00$760.31
144Prefabricated PM type C (W)(24")(solid) (668-7089)LF77$18.00$22.50$13.27$15.00$20.50$40.00$22.27
145Reflectorized pavement marker type I-C (672-7002)EACH91$7.00$8.00$5.31$505.00$7.25$6.85$7.87
146Reflectorized pavement marker type II-A-A (672-7004)EACH590$7.00$8.00$5.31$5.50$7.25$6.85$7.87
147Eliminating existing PM & markers (4") (677-7001)LF3,130$4.00$0.70$0.58$1.10$0.60$0.55$0.65
148Bonding course (3007-7001)GAL5,082$6.00$4.65$6.90$7.50$7.50$7.50$7.00
TxDOT contract A00064155: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy