TxDOT contract A00140955 bid tabulation
Bridge Replacement, SH 156 (AT STEPHENS CREEK to .). Let by Texas DOT on May 2, 2025, San Jacinto, Lufkin District. 8 bids received; low bid $4,304,421 by Skyline Bridge LLC, -3.3% against the engineer's estimate of $4,449,295.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 87
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Skyline Bridge LLC | $4,304,421 | Low | -3.0% |
| 2 | John Reed and Company, LLC | $4,346,368 | +1.0% | -2.0% |
| 3 | Longview Bridge and Road, LTD. | $4,550,200 | +6.0% | +2.0% |
| 4 | Forde Construction Company, Inc. | $4,978,022 | +16% | +12% |
| 5 | Hodges and Son Construction Company, Inc. | $5,134,662 | +19% | +15% |
| 6 | Altus Construction LLC | $5,180,355 | +20% | +16% |
| 7 | Texas Materials Group, Inc. | $5,512,566 | +28% | +24% |
| 8 | Isi Contracting, Inc. | $5,568,797 | +29% | +25% |
Engineer's estimate: $4,449,295.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Skyline Bridge LLC | 2. John Reed and Company, LLC | 3. Longview Bridge and Road, LTD. | 4. Forde Construction Company, Inc. | 5. Hodges and Son Construction Company, Inc. | 6. Altus Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 11.47 | $2,000.00 | $4,500.00 | $10,400 | $10,000 | $24,800 | $6,900.00 | $44,713 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 252 | $50.00 | $25.00 | $10.00 | $20.00 | $80.00 | $20.00 | $37.30 |
| 3 | Remove (0"-10") TRT/untrt base & asphalt pavement (105-7050) | SY | 2,063 | $15.00 | $14.00 | $10.00 | $14.00 | $15.00 | $12.00 | $11.19 |
| 4 | Excavation (roadway) (110-7001) | CY | 2,137 | $20.00 | $24.00 | $50.00 | $28.00 | $39.00 | $25.00 | $19.92 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 1,897 | $20.00 | $42.00 | $55.00 | $38.00 | $78.00 | $40.00 | $24.63 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 4,935 | $4.00 | $6.25 | $4.00 | $6.00 | $3.75 | $5.00 | $3.73 |
| 7 | Bond fiber MTRX seed (permanent)(rural)(sand) (164-7076) | SY | 4,935 | $1.75 | $1.00 | $1.00 | $0.80 | $0.82 | $1.00 | $2.80 |
| 8 | Bond fiber MTRX seed (temporary)(warm) (164-7077) | SY | 2,468 | $1.25 | $1.00 | $1.00 | $0.75 | $0.76 | $1.00 | $0.33 |
| 9 | Bond fiber MTRX seed (temporary)(cool) (164-7078) | SY | 2,468 | $1.25 | $1.00 | $1.00 | $0.80 | $0.79 | $1.00 | $2.80 |
| 10 | Vegetative watering (168-7001) | TGL | 199 | $20.00 | $1.00 | $150.00 | $17.00 | $235.00 | $1.00 | $34.11 |
| 11 | Sprinkling (dust control) (204-7001) | TGL | 43 | $1.00 | $50.00 | $120.00 | $40.00 | $178.00 | $1.00 | $0.93 |
| 12 | Proof rolling (216-7001) | HR | 9 | $200.00 | $150.00 | $40.00 | $200.00 | $330.00 | $1.00 | $93.25 |
| 13 | FL BS (roadway del) (type D GR 3) (247-7210) | TON | 2,625 | $50.00 | $70.00 | $130.00 | $70.00 | $60.00 | $75.00 | $59.61 |
| 14 | Cement (275-7001) | TON | 80 | $260.00 | $275.00 | $400.00 | $280.00 | $257.00 | $300.00 | $256.43 |
| 15 | Cement TRT (new base)(12") (275-7013) | SY | 4,320 | $10.75 | $13.50 | $8.00 | $5.00 | $10.00 | $16.00 | $2.80 |
| 16 | Salvage, haul & stockpile reclaimed asphalt pavement (3"-5") (305-7043) | SY | 3,780 | $12.00 | $18.00 | $3.00 | $6.00 | $8.00 | $12.00 | $3.73 |
| 17 | Asphalt (RC-250) (316-7032) | TON | 4.46 | $2,000.00 | $3,000.00 | $5,500.00 | $2,000.00 | $2,500.00 | $5,600.00 | $2,241.50 |
| 18 | Asphalt (AC-15P or CRS-2P) (316-7088) | TON | 8.93 | $1,250.00 | $1,800.00 | $5,000.00 | $2,000.00 | $2,500.00 | $5,400.00 | $1,152.07 |
| 19 | Aggregate (type PE, PL,E or L, GR-4)(sac-B) (316-7247) | CY | 34 | $385.00 | $1,200.00 | $230.00 | $300.00 | $940.00 | $1,400.00 | $466.24 |
| 20 | Aggregate (type E or L, GR-5) (316-7254) | CY | 30 | $385.00 | $1,200.00 | $230.00 | $300.00 | $978.00 | $1,200.00 | $127.46 |
| 21 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 1,553 | $180.00 | $220.00 | $180.00 | $220.00 | $160.00 | $220.00 | $323.02 |
| 22 | Cem stabil BKFL (400-7010) | CY | 1,084 | $325.00 | $250.00 | $120.00 | $250.00 | $153.00 | $250.00 | $201.48 |
| 23 | Temporary special shoring (403-7001) | SF | 436 | $70.00 | $65.00 | $10.00 | $95.00 | $50.00 | $100.00 | $37.30 |
| 24 | Drilled shaft (18 in) (416-7002) | LF | 250 | $175.00 | $85.00 | $140.00 | $125.00 | $275.00 | $150.00 | $198.09 |
| 25 | Drilled shaft (36 in) (416-7006) | LF | 1,050 | $375.00 | $275.00 | $380.00 | $340.00 | $350.00 | $250.00 | $186.53 |
| 26 | Class C concrete (abutment) (420-7012) | CY | 83.20 | $1,200.00 | $1,600.00 | $1,600.00 | $1,250.00 | $2,200.00 | $2,500.00 | $1,593.50 |
| 27 | Class C concrete (cap) (420-7022) | CY | 49.80 | $1,600.00 | $2,000.00 | $1,600.00 | $1,350.00 | $2,500.00 | $2,800.00 | $1,809.19 |
| 28 | Class C concrete (column) (420-7038) | CY | 36.20 | $2,600.00 | $2,200.00 | $1,600.00 | $1,300.00 | $2,600.00 | $2,800.00 | $1,752.40 |
| 29 | Reinforced concrete slab (422-7001) | SF | 8,969 | $30.00 | $35.00 | $30.00 | $42.00 | $33.00 | $45.00 | $48.99 |
| 30 | Approach slab (422-7013) | CY | 103 | $835.00 | $900.00 | $950.00 | $1,000.00 | $1,050.00 | $1,500.00 | $855.36 |
| 31 | Prestressed concrete girder (TX34) (425-7002) | LF | 1,547.97 | $200.00 | $245.00 | $296.00 | $245.00 | $255.00 | $295.00 | $314.69 |
| 32 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,595 | $235.00 | $185.00 | $120.00 | $185.00 | $320.00 | $180.00 | $215.55 |
| 33 | Rail (type T223) (450-7008) | LF | 469.40 | $185.00 | $175.00 | $180.00 | $175.00 | $140.00 | $180.00 | $134.50 |
| 34 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 97 | $275.00 | $275.00 | $196.00 | $320.00 | $296.00 | $250.00 | $230.05 |
| 35 | RC pipe (CL III)(18 in) (464-7003) | LF | 66 | $100.00 | $65.00 | $100.00 | $85.00 | $125.00 | $60.00 | $94.79 |
| 36 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 4 | $1,750.00 | $725.00 | $950.00 | $1,500.00 | $2,500.00 | $2,200.00 | $1,626.21 |
| 37 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $140,000 | $45,000 | $150,000 | $100,000 | $140,000 | $200,000 | $142,121 |
| 38 | Remove STR (driveway culvert) (496-7038) | EACH | 2 | $2,000.00 | $1,000.00 | $2,000.00 | $6,000.00 | $2,450.00 | $1,000.00 | $1,398.71 |
| 39 | Mobilization (500-7001) | LS | 1 | $400,000 | $400,000 | $420,000 | $400,000 | $490,000 | $455,000 | $515,445 |
| 40 | Barricades, signs and traffic handling (502-7001) | MO | 22 | $3,500.00 | $2,500.00 | $3,000.00 | $10,000 | $5,000.00 | $10,500 | $12,122 |
| 41 | Portable changeable message sign (503-7002) | EACH | 2 | $20,000 | $16,000 | $15,000 | $20,000 | $15,000 | $25,000 | $8,963.03 |
| 42 | TMA (stationary) (505-7001) | DAY | 10 | $350.00 | $250.00 | $275.00 | $250.00 | $250.00 | $300.00 | $207.26 |
| 43 | TMA (mobile operation) (505-7003) | DAY | 6 | $350.00 | $250.00 | $1,500.00 | $350.00 | $250.00 | $300.00 | $233.12 |
| 44 | Rock filter dams (install) (type 2) (506-7002) | LF | 89 | $55.00 | $65.00 | $70.00 | $44.00 | $70.00 | $1.00 | $50.63 |
| 45 | Rock filter dams (remove) (506-7011) | LF | 89 | $15.00 | $12.00 | $20.00 | $17.00 | $25.00 | $1.00 | $15.88 |
| 46 | Construction exits (install) (type 1) (506-7020) | SY | 222 | $40.00 | $10.00 | $70.00 | $40.00 | $76.00 | $1.00 | $31.70 |
| 47 | Construction exits (remove) (506-7024) | SY | 222 | $15.00 | $1.00 | $20.00 | $16.00 | $22.00 | $1.00 | $11.80 |
| 48 | Construction perimeter fence (506-7034) | LF | 161 | $15.00 | $15.00 | $15.00 | $9.00 | $7.00 | $2.00 | $5.32 |
| 49 | Temporary sediment control fence (install) (506-7039) | LF | 1,729 | $5.00 | $4.00 | $3.00 | $4.50 | $6.00 | $1.00 | $4.26 |
| 50 | Temporary sediment control fence (remove) (506-7041) | LF | 1,729 | $1.00 | $1.50 | $1.00 | $1.50 | $1.50 | $1.00 | $1.29 |
| 51 | Constructing detours (508-7001) | SY | 920 | $160.00 | $150.00 | $100.00 | $150.00 | $80.00 | $180.00 | $224.72 |
| 52 | One-way traffic control (port traffic signal) (510-7003) | MO | 21 | $2,900.00 | $2,800.00 | $3,500.00 | $5,000.00 | $1,500.00 | $3,500.00 | $7,249.96 |
| 53 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 1,100 | $100.00 | $90.00 | $80.00 | $80.00 | $80.00 | $80.00 | $43.38 |
| 54 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 120 | $100.00 | $115.00 | $60.00 | $90.00 | $96.00 | $80.00 | $81.02 |
| 55 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 820 | $25.00 | $35.00 | $5.00 | $12.00 | $29.00 | $25.00 | $13.99 |
| 56 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 40 | $25.00 | $35.00 | $5.00 | $20.00 | $50.00 | $25.00 | $13.70 |
| 57 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 1,100 | $60.00 | $50.00 | $15.00 | $10.00 | $33.00 | $50.00 | $18.65 |
| 58 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 120 | $80.00 | $100.00 | $15.00 | $10.00 | $55.00 | $50.00 | $18.96 |
| 59 | Driveways (ACP) (530-7010) | SY | 186 | $75.00 | $80.00 | $215.00 | $100.00 | $235.00 | $150.00 | $85.00 |
| 60 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 1,586 | $0.35 | $3.50 | $6.00 | $3.00 | $5.20 | $5.00 | $0.23 |
| 61 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 853 | $0.40 | $4.00 | $6.00 | $5.00 | $5.20 | $5.00 | $0.32 |
| 62 | Mill rumble strips (concrete) (centerline) (533-7004) | LF | 294 | $0.50 | $10.00 | $6.00 | $15.00 | $5.20 | $5.00 | $0.23 |
| 63 | Metal W-beam guard fence (timber post) (540-7001) | LF | 450 | $35.00 | $28.00 | $26.00 | $27.00 | $28.00 | $26.00 | $26.75 |
| 64 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 3 | $1,500.00 | $2,250.00 | $2,100.00 | $1,900.00 | $2,350.00 | $2,000.00 | $2,331.18 |
| 65 | Remove metal beam guard fence (542-7001) | LF | 200 | $8.00 | $5.00 | $2.50 | $3.00 | $2.80 | $2.00 | $3.00 |
| 66 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,500.00 | $3,500.00 | $3,447.00 | $3,500.00 | $3,900.00 | $3,100.00 | $3,106.56 |
| 67 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $725.00 | $1,000.00 | $250.00 | $220.00 | $280.00 | $500.00 | $298.39 |
| 68 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $10,000 | $30,000 | $27,750 | $30,000 | $31,000 | $30,000 | $29,839 |
| 69 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $1,175.00 | $1,500.00 | $1,643.00 | $1,600.00 | $1,800.00 | $2,000.00 | $884.12 |
| 70 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 6 | $810.00 | $1,250.00 | $592.00 | $840.00 | $670.00 | $800.00 | $477.70 |
| 71 | Remove SM RD SN sup&AM (644-7073) | EACH | 6 | $185.00 | $250.00 | $85.00 | $150.00 | $96.00 | $150.00 | $107.23 |
| 72 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 4 | $57.00 | $50.00 | $50.00 | $22.00 | $66.00 | $50.00 | $33.57 |
| 73 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 8 | $46.00 | $50.00 | $29.00 | $28.00 | $68.00 | $50.00 | $35.12 |
| 74 | Work zone pavement marking removing (reflectorized) type II-A-A (662-7051) | EACH | 50 | $6.00 | $15.00 | $3.75 | $11.00 | $4.25 | $10.00 | $5.59 |
| 75 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 5,352 | $2.50 | $1.75 | $0.75 | $2.75 | $0.85 | $1.50 | $1.28 |
| 76 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 24 | $12.00 | $15.00 | $12.00 | $22.00 | $14.00 | $15.00 | $14.92 |
| 77 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 1,920 | $2.50 | $1.75 | $1.00 | $3.00 | $1.10 | $2.00 | $1.45 |
| 78 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 1,310 | $0.75 | $4.25 | $3.00 | $8.00 | $3.40 | $4.00 | $1.08 |
| 79 | Reflectorized profile pavement marking type I(Y)6"(broken)(090MIL) (666-7273) | LF | 340 | $0.75 | $4.25 | $3.00 | $8.00 | $3.40 | $4.00 | $0.94 |
| 80 | Pavement sler 6" (666-7347) | LF | 3,731 | $1.00 | $1.00 | $1.00 | $2.25 | $1.10 | $0.80 | $0.42 |
| 81 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 2,294 | $0.75 | $1.50 | $1.75 | $2.50 | $2.00 | $2.00 | $0.76 |
| 82 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 290 | $0.75 | $1.50 | $3.00 | $2.50 | $3.40 | $2.00 | $0.68 |
| 83 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 1,147 | $0.75 | $1.50 | $2.00 | $1.10 | $2.25 | $1.50 | $0.67 |
| 84 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 62 | $6.00 | $15.00 | $9.00 | $9.00 | $10.00 | $10.00 | $5.13 |
| 85 | Eliminating existing PM & markers (4") (677-7001) | LF | 2,807 | $0.60 | $1.00 | $1.00 | $1.10 | $1.10 | $0.80 | $0.70 |
| 86 | Bonding course (3007-7001) | GAL | 227 | $6.50 | $28.00 | $10.00 | $6.00 | $5.65 | $8.00 | $4.43 |
| 87 | Driveway assistance device (dad) system (6063-7001) | MO | 21 | $10,000 | $1,650.00 | $1,200.00 | $3,000.00 | $1,400.00 | $1,500.00 | $186.49 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.