INDOT contract R-41302-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on January 15, 2025, Shelby, Greenfield. 9 bids received; low bid $2,851,000 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 128
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,851,000 | Low |
| 2 | Dave Omara Contractor Inc | $2,943,275 | +3.0% |
| 3 | Calumet Civil Contractors Inc | $2,983,000 | +5.0% |
| 4 | Beaty Construction Inc | $3,183,542 | +12% |
| 5 | His Constructors Inc | $3,230,250 | +13% |
| 6 | Rieth-Riley Construction Co., Inc. | $3,231,818 | +13% |
| 7 | E & B Paving LLC | $3,535,560 | +24% |
| 8 | Paul H Rohe Company Inc | $4,214,645 | +48% |
| 9 | Morphey Construction Inc. | $4,262,612 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Dave Omara Contractor Inc | 3. Calumet Civil Contractors Inc | 4. Beaty Construction Inc | 5. His Constructors Inc | 6. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,900 | $29,272 | $30,000 | $30,000 | $28,500 | $28,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $140,000 | $147,850 | $75,000 | $150,000 | $181,248 | $153,372 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $56,000 | $59,140 | $30,000 | $30,000 | $30,018 | $19,639 |
| 0012 | Pavement removal (202-02240) | SYS | 4,135 | $12.70 | $10.95 | $19.50 | $10.00 | $9.25 | $23.83 |
| 0013 | Sidewalk concrete, remove (202-52710) | SYS | 711 | $28.00 | $6.95 | $15.50 | $8.00 | $11.75 | $17.53 |
| 0014 | Sign, remove (202-74035) | EACH | 5 | $200.00 | $80.00 | $75.00 | $75.00 | $90.00 | $75.00 |
| 0015 | Inlet, remove (202-91385) | EACH | 4 | $2,600.00 | $495.00 | $1,425.00 | $600.00 | $1,180.00 | $957.87 |
| 0016 | Light fixture and conduit, remove (202-91707) | EACH | 1 | $1,372.00 | $1,495.00 | $1,372.00 | $1,372.00 | $1,690.00 | $1,372.00 |
| 0017 | Manhole, remove (202-93047) | EACH | 1 | $2,650.00 | $1,983.00 | $1,425.00 | $1,320.00 | $1,350.00 | $1,375.60 |
| 0018 | Apron, remove (202-94425) | SYS | 365 | $27.00 | $10.95 | $15.50 | $10.00 | $31.00 | $31.35 |
| 0019 | Concrete wall, remove (202-96035) | LFT | 16 | $255.00 | $293.00 | $247.00 | $150.00 | $200.00 | $90.74 |
| 0020 | Excavation, common (203-02000) | CYS | 4,565 | $37.00 | $32.25 | $35.00 | $57.00 | $24.00 | $90.87 |
| 0021 | Borrow (203-02070) | CYS | 50 | $19.75 | $20.00 | $40.00 | $1.00 | $33.00 | $0.01 |
| 0022 | Stormwater management budget (205-12108) | DOL | 43,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $15,000 | $27,490 | $15,000 | $30,000 | $12,039 |
| 0024 | SWQCP preparation (205-12618) | LS | 1 | $1,700.00 | $2,000.00 | $2,000.00 | $5,000.00 | $4,400.00 | $27,325 |
| 0025 | Subgrade treatment, type II (207-08264) | SYS | 860 | $28.00 | $23.00 | $26.00 | $36.00 | $16.00 | $24.89 |
| 0026 | Subgrade treatment, type III (207-08266) | SYS | 2,245 | $6.25 | $10.00 | $8.25 | $4.00 | $3.00 | $3.81 |
| 0027 | Subgrade treatment, type ibc (207-12635) | SYS | 6,550 | $12.90 | $16.95 | $16.50 | $17.00 | $17.00 | $15.37 |
| 0028 | B borrow (211-02050) | CYS | 100 | $32.00 | $79.00 | $65.00 | $120.00 | $64.00 | $76.61 |
| 0029 | Structure backfill, type 1 (211-09264) | CYS | 1,070 | $62.00 | $75.00 | $67.00 | $35.00 | $63.00 | $44.86 |
| 0030 | Subbase for PCCP (302-06464) | CYS | 1,850 | $64.00 | $79.00 | $89.00 | $55.00 | $55.00 | $89.99 |
| 0031 | Dense graded subbase (302-07455) | CYS | 125 | $171.00 | $89.00 | $145.00 | $150.00 | $87.00 | $166.78 |
| 0032 | Compacted aggregate, no. 53 (303-01180) | TON | 1,365 | $38.00 | $35.00 | $45.00 | $36.00 | $56.00 | $48.16 |
| 0033 | Milling, asphalt, 2 in. (306-08036) | SYS | 125 | $36.50 | $25.00 | $45.00 | $27.00 | $30.00 | $64.00 |
| 0034 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 101 | $174.00 | $200.00 | $108.50 | $145.00 | $215.00 | $179.26 |
| 0035 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 132 | $158.00 | $100.00 | $91.50 | $107.00 | $195.00 | $151.37 |
| 0036 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 226 | $152.00 | $120.00 | $98.50 | $103.00 | $188.00 | $142.80 |
| 0037 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 44 | $138.00 | $195.00 | $125.00 | $140.00 | $170.00 | $130.90 |
| 0038 | Joint adhesive, surface (401-10258) | LFT | 350 | $2.50 | $5.00 | $1.00 | $0.45 | $3.00 | $1.02 |
| 0039 | Joint adhesive, intermediate (401-10259) | LFT | 300 | $5.40 | $5.00 | $1.00 | $0.60 | $6.00 | $1.25 |
| 0040 | Liquid asphalt sealant (401-11785) | LFT | 650 | $1.10 | $5.00 | $1.00 | $0.01 | $1.25 | $0.01 |
| 0041 | Asphalt for tack coat (406-05520) | TON | 1.50 | $870.00 | $600.00 | $3,000.00 | $1.00 | $1,000.00 | $0.01 |
| 0042 | QC/QA-PCCP, 10 in. (501-06321) | SYS | 4,780 | $81.50 | $110.00 | $96.00 | $94.00 | $110.00 | $89.76 |
| 0043 | PCCP, 8 in. (502-06999) | SYS | 245 | $81.00 | $104.00 | $120.00 | $98.00 | $100.00 | $136.97 |
| 0044 | Retrofitted tie bars (503-03489) | EACH | 30 | $18.00 | $25.00 | $26.00 | $100.00 | $25.00 | $48.95 |
| 0045 | D-1 contraction joint (503-05240) | LFT | 2,837 | $19.50 | $15.00 | $18.00 | $15.00 | $26.00 | $23.36 |
| 0046 | Terminal joint, type PCCP (503-12478) | LFT | 377 | $369.00 | $243.00 | $145.00 | $330.00 | $475.00 | $198.88 |
| 0047 | HMA for sidewalk (604-05528) | TON | 347 | $129.00 | $139.00 | $112.00 | $100.00 | $160.00 | $109.84 |
| 0048 | Curb ramp, concrete (604-08086) | SYS | 157 | $272.00 | $147.00 | $255.00 | $320.00 | $354.00 | $203.64 |
| 0049 | Detectable warning surfaces (604-12083) | SYS | 20 | $295.00 | $325.00 | $412.00 | $530.00 | $375.00 | $454.65 |
| 0050 | Curb, integral concrete (605-06090) | LFT | 4,115 | $27.00 | $20.00 | $33.50 | $25.00 | $36.00 | $37.01 |
| 0051 | Curb, integral concrete, modified (605-06105) | LFT | 260 | $72.00 | $34.00 | $85.00 | $100.00 | $92.00 | $37.01 |
| 0052 | Curb, concrete (605-06120) | LFT | 940 | $31.50 | $32.00 | $39.00 | $30.00 | $41.00 | $50.41 |
| 0053 | HMA for approaches, type B (610-07487) | TON | 76 | $279.00 | $225.00 | $205.00 | $200.00 | $345.00 | $263.09 |
| 0054 | PCCP for approaches, 6 in. (610-08446) | SYS | 730 | $74.00 | $75.00 | $86.00 | $140.00 | $95.00 | $107.81 |
| 0055 | Mailbox assembly, triple (611-02825) | EACH | 1 | $450.00 | $475.00 | $500.00 | $450.00 | $550.00 | $640.00 |
| 0056 | Mailbox assembly, single (611-06497) | EACH | 5 | $275.00 | $300.00 | $375.00 | $275.00 | $330.00 | $220.00 |
| 0057 | Mailbox assembly, double (611-06498) | EACH | 1 | $375.00 | $400.00 | $450.00 | $375.00 | $460.00 | $440.00 |
| 0058 | Right-of-way marker (615-06490) | EACH | 35 | $165.00 | $170.00 | $275.00 | $165.00 | $200.00 | $150.00 |
| 0059 | Monument, type B (615-06505) | EACH | 4 | $1,000.00 | $1,000.00 | $925.00 | $1,000.00 | $1,230.00 | $920.00 |
| 0060 | Monument, type C (615-06510) | EACH | 6 | $815.00 | $825.00 | $425.00 | $815.00 | $1,000.00 | $475.00 |
| 0061 | Monument, type D (615-06515) | EACH | 19 | $130.00 | $135.00 | $200.00 | $130.00 | $160.00 | $110.00 |
| 0062 | Monument, RE-establish (615-06520) | EACH | 1 | $2,475.00 | $2,475.00 | $2,050.00 | $2,475.00 | $3,045.00 | $920.00 |
| 0063 | Water (621-06567) | KGAL | 29.60 | $5.00 | $5.00 | $5.00 | $57.00 | $6.00 | $5.00 |
| 0064 | Sodding, nursery (621-06575) | SYS | 7,410 | $4.90 | $5.50 | $9.85 | $4.89 | $6.00 | $4.90 |
| 0065 | Field office, type C (628-09403) | MOS | 8 | $4,550.00 | $2,235.00 | $3,200.00 | $3,600.00 | $3,900.00 | $4,149.17 |
| 0066 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 3,155 | $8.45 | $10.00 | $30.00 | $15.00 | $10.00 | $8.45 |
| 0067 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 43 | $45.00 | $24.00 | $64.00 | $82.00 | $55.00 | $45.00 |
| 0068 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 240 | $69.00 | $78.00 | $95.00 | $101.00 | $67.00 | $73.70 |
| 0069 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 283 | $69.50 | $92.00 | $100.00 | $130.00 | $69.00 | $78.76 |
| 0070 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 278 | $94.00 | $143.00 | $110.00 | $135.00 | $142.00 | $87.23 |
| 0071 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 150 | $86.00 | $92.00 | $115.00 | $119.00 | $110.00 | $62.59 |
| 0072 | Video inspection for pipe (715-09064) | LFT | 865 | $2.90 | $1.50 | $2.90 | $2.90 | $3.50 | $2.90 |
| 0073 | Video inspection for underdrain (718-06532) | LFT | 3,000 | $1.00 | $1.50 | $1.00 | $1.00 | $1.25 | $1.00 |
| 0074 | Geotextile for underdrains, type 1A (718-12305) | SYS | 3,065 | $2.95 | $1.95 | $1.25 | $2.40 | $3.50 | $2.95 |
| 0075 | Aggregate for underdrains (718-52610) | CYS | 288 | $67.40 | $79.00 | $81.00 | $98.00 | $83.00 | $67.40 |
| 0076 | Casting, manhole, adjust to grade (720-12798) | EACH | 11 | $1,550.00 | $1,275.00 | $950.00 | $1,200.00 | $905.00 | $883.30 |
| 0077 | Inlet, type F7 (720-45035) | EACH | 1 | $2,225.00 | $2,000.00 | $3,500.00 | $2,600.00 | $2,245.00 | $2,996.08 |
| 0078 | Catch basin, type E7 (720-45235) | EACH | 1 | $2,600.00 | $1,900.00 | $3,500.00 | $3,500.00 | $2,370.00 | $3,262.15 |
| 0079 | Pipe catch basin, 15 in. (720-45265) | EACH | 1 | $2,500.00 | $1,990.00 | $2,000.00 | $3,200.00 | $1,385.00 | $2,366.61 |
| 0080 | Manhole, type C4 (720-45410) | EACH | 3 | $4,500.00 | $3,900.00 | $6,000.00 | $5,000.00 | $7,100.00 | $6,773.58 |
| 0081 | Manhole, type D4 (720-45415) | EACH | 1 | $4,500.00 | $9,500.00 | $6,000.00 | $8,600.00 | $9,545.00 | $7,872.42 |
| 0082 | Manhole, type D4, modified (720-45515) | EACH | 1 | $5,600.00 | $12,300 | $6,000.00 | $9,350.00 | $8,380.00 | $8,180.81 |
| 0083 | Catch basin, type W4 (720-92240) | EACH | 1 | $4,400.00 | $3,150.00 | $3,190.00 | $6,300.00 | $5,830.00 | $4,994.17 |
| 0084 | Casting, water valve, adjust to grade (720-94840) | EACH | 3 | $1,900.00 | $1,135.00 | $540.00 | $490.00 | $680.00 | $537.46 |
| 0085 | Inlet, type B15 (720-98174) | EACH | 11 | $5,250.00 | $2,995.00 | $4,250.00 | $3,500.00 | $3,240.00 | $4,308.98 |
| 0086 | Inlet, type C15 (720-98555) | EACH | 2 | $5,400.00 | $3,095.00 | $4,250.00 | $3,450.00 | $3,195.00 | $4,387.74 |
| 0087 | Leveling pad, concrete (731-93947) | LFT | 175 | $65.00 | $89.00 | $86.50 | $82.00 | $63.00 | $73.51 |
| 0088 | Aggregate for drainage fill (732-11770) | CYS | 26 | $119.00 | $85.00 | $79.00 | $79.00 | $97.00 | $112.14 |
| 0089 | Modular block wall (732-11810) | SFT | 750 | $28.00 | $29.00 | $26.33 | $26.33 | $32.00 | $19.92 |
| 0090 | Modular block wall erection (732-11811) | SFT | 750 | $36.50 | $29.00 | $26.64 | $26.64 | $33.00 | $42.80 |
| 0091 | Road closure sign assembly (801-04308) | EACH | 16 | $500.00 | $280.00 | $184.00 | $184.00 | $225.00 | $371.40 |
| 0092 | Detour route marker assembly (801-06625) | EACH | 31 | $250.00 | $105.00 | $140.00 | $140.00 | $170.00 | $105.96 |
| 0093 | Construction sign, type A (801-06640) | EACH | 36 | $300.00 | $80.00 | $181.00 | $181.00 | $220.00 | $153.47 |
| 0094 | Construction sign, type B (801-06645) | EACH | 8 | $100.00 | $65.00 | $59.00 | $59.00 | $72.00 | $56.98 |
| 0095 | Maintaining traffic (801-06775) | LS | 1 | $15,772 | $49,739 | $32,424 | $235,000 | $20,000 | $31,576 |
| 0096 | Barricade, type III-A (801-07118) | LFT | 120 | $20.00 | $16.00 | $9.00 | $9.00 | $11.00 | $16.46 |
| 0097 | Barricade, type III-B (801-07119) | LFT | 120 | $20.00 | $16.00 | $11.00 | $11.00 | $13.00 | $19.40 |
| 0098 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 516 | $17.00 | $36.95 | $33.90 | $17.00 | $21.00 | $33.90 |
| 0099 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 184.50 | $24.00 | $31.50 | $28.90 | $24.00 | $30.00 | $28.90 |
| 0100 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 80 | $22.00 | $34.00 | $31.00 | $22.00 | $27.00 | $31.00 |
| 0101 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 20 | $42.00 | $35.00 | $32.80 | $42.00 | $52.00 | $32.80 |
| 0102 | Sign post, timber, 4 in. X 6 in. (802-96994) | LFT | 42 | $50.00 | $70.00 | $65.90 | $10.00 | $12.00 | $65.90 |
| 0103 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 400 | $42.90 | $47.00 | $42.90 | $42.90 | $52.00 | $42.90 |
| 0104 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 25 | $4.70 | $5.00 | $4.70 | $4.70 | $5.75 | $4.70 |
| 0105 | Handhole, lighting (807-02191) | EACH | 20 | $1,260.00 | $1,350.00 | $1,260.00 | $1,260.00 | $1,550.00 | $1,260.00 |
| 0106 | Luminaire, ornamental (807-03950) | EACH | 20 | $2,778.00 | $3,000.00 | $2,778.00 | $2,778.00 | $3,420.00 | $2,778.00 |
| 0107 | Light pole, ornamental (807-03951) | EACH | 20 | $8,331.00 | $9,000.00 | $8,331.00 | $8,331.00 | $10,265 | $8,331.00 |
| 0108 | Lighting foundation , 3 FT dia. X 8 FT deep (807-04653) | EACH | 20 | $1,856.00 | $1,995.00 | $1,856.00 | $1,856.00 | $2,285.00 | $1,856.00 |
| 0109 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 3,998 | $16.60 | $17.00 | $16.60 | $16.60 | $20.00 | $16.60 |
| 0110 | Service point, type I (807-86805) | EACH | 1 | $8,178.00 | $8,500.00 | $8,178.00 | $8,178.00 | $10,075 | $8,178.00 |
| 0111 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 1,060 | $0.86 | $0.90 | $0.86 | $0.86 | $1.05 | $0.86 |
| 0112 | Connector kit, unfused (807-86910) | EACH | 20 | $55.80 | $59.00 | $55.80 | $55.80 | $68.00 | $55.80 |
| 0113 | Connector kit, fused (807-86915) | EACH | 20 | $51.30 | $55.00 | $51.30 | $51.30 | $63.00 | $51.30 |
| 0114 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 45 | $22.00 | $23.00 | $22.00 | $22.00 | $27.00 | $22.00 |
| 0115 | Multiple compression fitting, waterproofed (807-86925) | EACH | 24 | $22.00 | $23.00 | $22.00 | $22.00 | $27.00 | $22.00 |
| 0116 | Insulation link, non- waterproofed (807-86930) | EACH | 40 | $13.10 | $14.00 | $13.10 | $13.10 | $16.00 | $13.10 |
| 0117 | Insulation link, waterproofed (807-86935) | EACH | 28 | $15.90 | $17.00 | $15.90 | $15.90 | $19.00 | $15.90 |
| 0118 | Cable-duct marker (807-86955) | EACH | 5 | $280.00 | $300.00 | $280.00 | $280.00 | $340.00 | $280.00 |
| 0119 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 500 | $16.40 | $17.00 | $16.40 | $16.40 | $20.00 | $16.40 |
| 0120 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 658 | $1.00 | $1.85 | $1.71 | $1.71 | $1.25 | $0.39 |
| 0121 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 2,870 | $1.00 | $1.85 | $1.71 | $1.71 | $1.25 | $0.40 |
| 0122 | Transverse marking, multi-component, crosshatch line, yellow, 12 in. (808-10042) | LFT | 377 | $7.00 | $2.50 | $2.25 | $2.25 | $8.50 | $4.13 |
| 0123 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 20 | $12.00 | $25.00 | $20.65 | $20.65 | $14.75 | $9.22 |
| 0124 | Transverse marking, multi-component, crosswalk line, white, 8 in. (808-10074) | LFT | 62 | $5.00 | $4.25 | $3.90 | $3.90 | $6.15 | $4.44 |
| 0125 | Transverse marking, multi-component, crosswalk line, white, 24 in. (808-10099) | LFT | 328 | $12.00 | $13.00 | $12.00 | $12.00 | $14.75 | $6.91 |
| 0126 | Transverse marking, multi-component, yield line, white, 24 in. (808-11776) | LFT | 80 | $12.00 | $29.00 | $26.75 | $26.75 | $14.75 | $10.52 |
| 0127 | Grooving for pavement markings (808-12032) | LFT | 3,528 | $2.00 | $2.50 | $1.61 | $1.61 | $2.00 | $0.41 |
| 0128 | Snowplowable raised pavement marker (808-75998) | EACH | 49 | $75.00 | $127.00 | $118.90 | $118.90 | $92.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.