TDOT contract CN261021 bid tabulation

The resurfacing on s.r. 68 from near avalon drive (l.m. 11.10) to near old state road (l.m. 18.93). Let by Tennessee DOT on March 20, 2026, Monroe County. 2 bids received; low bid $4,030,000 by Rogers Group, Inc..

Owner
Tennessee DOT
Letting
20 MAR 2026
Pay items
44
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$4,030,000Low
2APAC-Atlantic, Inc.$4,739,995+18%
TDOT contract CN261021: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. APAC-Atlantic, Inc.
1Brooming & degrassing shoulders (208-01.05)LM16$620.00$1,200.00
2Mineral aggregate, type A base, grading D (303-01)TON2,160$52.00$46.50
3Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON2,314$145.00$148.00
4Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON7,837$120.00$149.50
5Bituminous material for prime coat (PC) (402-01)TON78$1,150.00$505.00
6Bituminous material for tack coat (TC) (403-01)TON238$900.00$800.00
7Acs mix(PG70-22) thin lift D asphalt (411-03.13)TON10,662$143.00$157.00
8Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM8$550.00$600.00
9Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM6$550.00$600.00
10Cold planing bituminous pavement (415-01.01)TON5,120$28.00$45.00
11Guardrail transition 27IN to 31IN (705-02.10)EACH24$130.00$145.00
12Earth pad for type 38 GR end treatment (705-04.09)EACH25$890.00$1,000.00
13Tangent energy absorbing term MASH TL-3 (705-06.20)EACH25$3,600.00$4,000.00
14Traffic control (712-01)LS1$75,000$180,000
15Flexible drums (channelizing) (712-04.01)EACH142$43.00$48.00
16Warning lights (type A) (712-05.01)EACH71$1.00$1.25
17Signs (construction) (712-06)SF1,469$7.50$8.50
18Arrow board (type C) (712-08.03)EACH2$1,025.00$1,250.00
19Class A concrete (foundation for sign supports) (713-01.01)CY1$105.00$1,500.00
20Steel bar reinforcement(foundation for sign supports) (713-01.02)LB200$1.00$1.50
21Perforated/knockout square tube post (713-11.02)LB226$5.50$6.50
22P post slip base (713-11.21)EACH8$620.00$700.00
23Flat sheet aluminum signs (0.080" thick) (713-13.02)SF48$12.00$14.00
24Flat sheet aluminum signs (0.100" thick) (713-13.03)SF9$14.00$16.00
25Removal of signs, posts and footings (713-15)LS1$520.00$600.00
26Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH607$39.00$46.00
27Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH1,464$39.00$46.00
28Removal of snowplowable reflective marker (716-01.30)EACH2,071$8.00$12.00
29Plastic pavement marking(channelization striping) (716-02.04)SY631$21.00$26.50
30Plastic pavement marking (stop line) (716-02.05)LF456$10.50$14.00
31Plastic pavement marking (turn lane arrow) (716-02.06)EACH71$205.00$250.00
32Plastic pavement marking (8" dotted line) (716-02.08)LF4,526$2.00$3.00
33Plastic pavement marking (8IN line) (716-02.12)LM0.50$10,500$12,000
34Plastic word pavement marking (only) (716-03.01)EACH2$155.00$175.00
35Plastic pavement marking (straight-turn arrow) (716-04.01)EACH1$285.00$320.00
36Plastic pavement marking (straight arrow) (716-04.05)EACH5$145.00$175.00
37Plastic pavement marking (exit only arrow) (716-04.07)EACH2$255.00$300.00
38Plastic pavement marking (lane reduction arrow) (716-04.14)EACH5$310.00$400.00
39Painted pavement marking (6" line) (716-05.20)LM42$900.00$1,200.00
40Removal of pavement marking (line) (716-08.20)LM18$2,650.00$3,200.00
41Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM32$3,850.00$4,500.00
42Mobilization (717-01)LS1$66,207$168,000
43Saw slot (730-14.02)LF1,500$6.00$7.75
44Loop wire (730-14.03)LF3,000$1.10$2.25
TDOT contract CN261021: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy