SB Structures, LLC: WSDOT bid record
SB Structures, LLC submitted 10 bids on Washington State DOT contracts in the data, from 05 JAN 2011 to 01 FEB 2023, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $832,363
- Latest bid
- 01 FEB 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2011 | 2 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2018 | 1 | 0 | 0% |
| 2019 | 2 | 0 | 0% |
| 2022 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 4 | 0 | 0% |
| SWR region | 3 | 1 | 33% |
| NWR region | 2 | 0 | 0% |
| ER region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Paint line | LF | 7 | 3 (43%) | $0.80 | $0.25 | |
| Construction signs class A | SF | 6 | 3 (50%) | $22.50 | $16.21 | |
| Plastic drainage marking | EACH | 5 | 3 (60%) | $70.00 | $34.00 | |
| Extruded curb | LF | 5 | 3 (60%) | $19.50 | $12.00 | |
| Beam guardrail type 31 | LF | 5 | 3 (60%) | $45.00 | $26.32 | |
| Crushed surfacing base course | TON | 7 | 2 (29%) | $33.25 | $26.44 | |
| Plastic traffic arrow | EACH | 5 | 2 (40%) | $155.00 | $135.00 | |
| Removing guardrail | LF | 5 | 2 (40%) | $6.50 | $5.00 | |
| Raised pavement marker type 2 | HUND | 5 | 2 (40%) | $1,250.00 | $478.00 | |
| Temporary pavement marking-short duration | LF | 5 | 2 (40%) | $1.20 | $0.40 | |
| Structure excavation class A including haul | CY | 5 | 1 (20%) | $25.00 | $23.50 | |
| Underdrain pipe 6 inch diameter | LF | 5 | 1 (20%) | $20.00 | $12.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ceccanti, Inc. | 6 | 2 of 6 |
| Cascade Bridge LLC | 6 | 2 of 6 |
| Quigg Bros., Inc. | 6 | 2 of 6 |
| Rognlin'S, Inc. | 4 | 1 of 4 |
| Selby Bridge Company, Inc. | 4 | 2 of 4 |
| Max J. Kuney Company | 4 | 3 of 4 |
| C.A. Carey Corporation | 3 | 2 of 3 |
| Granite Construction Company | 3 | 1 of 3 |
| Midmountain Contractors, Inc. | 3 | 1 of 3 |
| Guy F. Atkinson Construction, | 2 | 1 of 2 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 FEB 2023 | 009930 | SWR region | I-5 koontz road bridge emergency bridge repair | 2 of 5 | $1,008,911 | +6.0% |
| 06 APR 2022 | 009795 | SWR region | Sr 506 1.5 miles n of frontage rd to i-5 emergency bridge repair | 1 of 8 | $832,363 | Low, 1.0% under the second |
| 09 FEB 2022 | 009763 | OR region | Sr 16 and sr 302 (spur) purdy creek remove fish barriers and paving | 4 of 11 | $29,719,797 | +16% |
| 24 JAN 2019 | 009360 | OR region | Sr 107 chehalis river bridge structural rehabilitation & painting | 8 of 10 | $21,288,071 | +9.0% |
| 09 JAN 2019 | 009357 | NWR region | Sr 509 & sr 518 s 192 st to normandy pk & sr 509 to sr 99 paving & ada & deck & seismic | 6 of 6 | $11,573,586 | +28% |
| 07 JAN 2018 | 009197 | SWR region | Sr 508 s. fork newaukum river bridge replacement | 7 of 10 | $5,466,500 | +9.0% |
| 25 JAN 2017 | 009011 | ER region | Us 395 nsc freya st - structures | 6 of 7 | $8,852,525 | +16% |
| 03 DEC 2014 | 008685 | OR region | Sr 162 puyallup river bridge bridge replacement 13c521 | 2 of 15 | $5,660,195 | +3.0% |
| 20 APR 2011 | 008113 | NWR region | Sr 518 bridges - seismic retrofit | 8 of 11 | $4,353,699 | +17% |
| 05 JAN 2011 | 008047 | OR region | I-5 exit 111 lacey vic. noise walls | 2 of 17 | $2,893,775 | +1.0% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.