ODOT contract 250096 bid tabulation
MOE-SR 537-00.32 (SLIDE REPAIR). Let by Ohio DOT on February 13, 2025, MOE. 3 bids received; low bid $1,651,908 by Alan Stone Co Inc, +0.2% against the engineer's estimate of $1,648,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 67
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $1,651,908 | Low | 0.0% |
| 2 | Shelly & Sands Inc | $1,669,419 | +1.0% | +1.0% |
| 3 | Ohio-West Virginia Excavating Co | $2,176,017 | +32% | +32% |
Engineer's estimate: $1,648,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Shelly & Sands Inc | 3. Ohio-West Virginia Excavating Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $55,000 | $5,000.00 | $5,000.00 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 69 | $70.00 | $30.00 | $70.00 |
| 3 | Pipe removed, 24" and under (202E35100) | FT | 120 | $30.00 | $50.00 | $70.00 |
| 4 | Guardrail removed (202E38000) | FT | 900 | $2.50 | $2.00 | $4.00 |
| 5 | Removal misc.:pile extraction (202E98100) | EACH | 27 | $170.00 | $250.00 | $340.00 |
| 6 | Excavation (203E10000) | CY | 429 | $45.00 | $60.00 | $28.00 |
| 7 | Embankment (203E20000) | CY | 782 | $15.00 | $20.00 | $60.00 |
| 8 | Granular material, type C, as per plan (203E35121) | CY | 120 | $100.00 | $160.00 | $230.00 |
| 9 | Subgrade compaction (204E10000) | SY | 684 | $4.50 | $6.00 | $5.00 |
| 10 | Ditch cleanout (209E10000) | FT | 762 | $8.50 | $3.25 | $4.00 |
| 11 | Pavement planing, asphalt concrete, as per plan VA (254E01001) | SY | 34 | $220.00 | $61.00 | $65.00 |
| 12 | Guardrail, type MGS with long posts (606E15100) | FT | 850 | $25.00 | $22.00 | $25.00 |
| 13 | Rounded end section (606E20050) | EACH | 1 | $80.00 | $50.00 | $75.00 |
| 14 | Anchor assembly, MGS type A (606E25550) | EACH | 1 | $2,100.00 | $1,720.00 | $2,000.00 |
| 15 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,300.00 | $1,430.00 | $1,200.00 |
| 16 | Reference monument, type A (623E40500) | EACH | 19 | $1,100.00 | $1,200.00 | $300.00 |
| 17 | Dumped rock fill, type B, as per plan (601E26001) | CY | 3,348 | $110.00 | $132.00 | $134.00 |
| 18 | Seeding and mulching (659E10000) | SY | 2,278 | $1.50 | $1.65 | $5.00 |
| 19 | Commercial fertilizer (659E20000) | TON | 0.31 | $610.00 | $1,221.99 | $1,600.00 |
| 20 | Lime (659E31000) | ACRE | 0.47 | $880.00 | $150.00 | $300.00 |
| 21 | Water (659E35000) | MGAL | 6.15 | $110.00 | $1.00 | $2.00 |
| 22 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 23 | Concrete masonry (602E20000) | CY | 2 | $6,800.00 | $1,900.00 | $2,700.00 |
| 24 | Aggregate drains (605E31100) | FT | 53 | $40.00 | $20.00 | $50.00 |
| 25 | 15" conduit, type A (611E05700) | FT | 131 | $180.00 | $195.00 | $140.00 |
| 26 | 15" conduit, type A, as per plan (611E05701) | FT | 10 | $450.00 | $250.00 | $270.00 |
| 27 | 15" conduit, type A, as per plan (611E05701) | FT | 11 | $110.00 | $150.00 | $255.00 |
| 28 | Low strength mortar backfill (613E41200) | CY | 58 | $80.00 | $125.00 | $275.00 |
| 29 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 113 | $290.00 | $310.00 | $310.00 |
| 30 | Aggregate base (304E20000) | CY | 184 | $130.00 | $115.00 | $160.00 |
| 31 | Non-tracking tack coat (407E20000) | GAL | 147 | $6.00 | $3.20 | $5.00 |
| 32 | Prime coat (408E10000) | GAL | 143 | $15.00 | $10.00 | $5.00 |
| 33 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 80 | $330.00 | $261.00 | $265.00 |
| 34 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 27 | $400.00 | $285.00 | $290.00 |
| 35 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 14 | $480.00 | $361.00 | $365.00 |
| 36 | Compacted aggregate (617E10100) | CY | 239 | $140.00 | $120.00 | $130.00 |
| 37 | RPM (621E00100) | EACH | 20 | $160.00 | $150.00 | $150.00 |
| 38 | Raised pavement marker removed (621E54000) | EACH | 20 | $20.00 | $13.00 | $20.00 |
| 39 | Barrier reflector, type 2(bidirectional) (626E00110) | EACH | 18 | $10.00 | $16.00 | $10.00 |
| 40 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $250.00 | $225.00 | $100.00 |
| 41 | Edge line, 6", type 1 (642E00104) | MI | 0.32 | $2,700.00 | $2,425.00 | $2,500.00 |
| 42 | Center line, type 1 (642E00300) | MI | 0.31 | $3,000.00 | $2,750.00 | $2,800.00 |
| 43 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $3,800.00 | $3,120.00 | $3,000.00 |
| 44 | Work zone lighting system (614E12740) | EACH | 1 | $3,700.00 | $15,000 | $2,500.00 |
| 45 | Barrier reflector, type 1(bidirectional) (614E13310) | EACH | 18 | $35.00 | $10.00 | $30.00 |
| 46 | Object marker, two way (614E13360) | EACH | 18 | $35.00 | $15.00 | $35.00 |
| 47 | Work zone edge line, class I, 6" (614E22010) | MI | 0.34 | $3,200.00 | $2,950.00 | $11,000 |
| 48 | Work zone stop line, class I (614E26000) | FT | 20 | $15.00 | $14.00 | $15.00 |
| 49 | Roads for maintaining traffic (615E10000) | LS | 1 | $9,500.00 | $10,000 | $5,000.00 |
| 50 | Pavement for maintaining traffic, class B (615E25000) | SY | 96 | $140.00 | $137.00 | $220.00 |
| 51 | Water (616E10000) | MGAL | 67.70 | $0.05 | $40.00 | $1.00 |
| 52 | Portable barrier, unanchored (622E41100) | FT | 890 | $25.00 | $27.00 | $30.00 |
| 53 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $1.00 | $1,500.00 | $20,000 |
| 54 | Rock excavation (503E31100) | CY | 3 | $610.00 | $700.00 | $1,800.00 |
| 55 | Steel piles, misc.:soldier piles, W21X101 (507E00400) | FT | 3,001 | $95.00 | $88.25 | $135.00 |
| 56 | Class QC1 concrete, footing, as per plan (511E46511) | CY | 42 | $510.00 | $500.00 | $475.00 |
| 57 | Porous backfill with geotextile fabric (518E21200) | CY | 210 | $161.00 | $165.00 | $112.00 |
| 58 | 6" perforated corrugated plastic pipe (518E40000) | FT | 541 | $10.00 | $4.00 | $10.00 |
| 59 | 6" non-perforated corrugated plastic pipe (518E40012) | FT | 9 | $55.00 | $65.00 | $30.00 |
| 60 | Drilled shafts, 36" diameter, above bedrock, as per plan (524E94703) | FT | 2,431 | $100.00 | $92.00 | $120.00 |
| 61 | Drilled shafts, 36" diameter, into bedrock, as per plan (524E94705) | FT | 970 | $105.00 | $110.00 | $230.00 |
| 62 | Drilled shafts, misc.:extension (524E95000) | FT | 17 | $100.00 | $50.00 | $200.00 |
| 63 | Special - retaining wall, precast concrete lagging (530E51010) | SF | 2,977 | $20.00 | $30.00 | $40.00 |
| 64 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,000 | $10,900 | $26,000 |
| 65 | Maintaining traffic (614E11000) | LS | 1 | $41,000 | $16,000 | $85,000 |
| 66 | Construction layout stakes and surveying (623E10000) | LS | 1 | $14,000 | $18,000 | $10,000 |
| 67 | Mobilization (624E10000) | LS | 1 | $25,000 | $50,000 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.