TDOT contract CN262029 bid tabulation
The resurfacing on s.r. 290 from s.r. 56 (l.m. 10.58) in jackson county to shipley road (l.m. 1.57) in putnam county, including thin epoxy overlay on the bridge at l.m. 0.4. Let by Tennessee DOT on March 20, 2026, Jackson And Putnam Counties. 2 bids received; low bid $1,276,444 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 20 MAR 2026
- Pay items
- 30
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $1,276,444 | Low |
| 2 | Vulcan Construction Materials, LLC | $1,394,964 | +9.0% |
Bid tabulation
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.